work plan. The Contractor will not be entitled to compensation for the suspension of work resulting from the late <br /> proposed of closures. <br /> reopening <br /> COMPENSATION s operations the <br /> The Engineer shall be notified of delays in the Con racto delayed or interfered with by reason of thosesconditions and <br /> opinion of the Engineer,the Contractor's controlling opera <br /> tion is the Contractor's loss due to that delay could not have been avoided by rescheduling the affected closure or by judicious <br /> handling of forces, equipment and plant, the delay will be considered a right of way delay and will be compensated in <br /> h g ht of Way Delays,"of the Standard Specifications: <br /> conformance with the Provisions. Section 8-1.09, ,Right <br /> within t <br /> ad and his planned closures are he time frame allowed <br /> 1. The Contractor's proposed Closure Schedule is den will not be entitled to <br /> for closures in "Maintaining Traffic of these spec Provisions, except that the Contractor <br /> roved. <br /> compensation for amendments to the Closure Schedule that are not app <br /> 2. The Contractor is denied a confirmed closure. roved Closure <br /> tim <br /> ted in the <br /> Should the Engineer direct the Contractor <br /> due to removalremove a closure of the cosure will beefore the onside ed a night of way delay and <br /> Schedule, delay to the Contractors schedule <br /> ht of Way Delays," <br /> compensation for the delay will be determined in conformance with the provisions in Section 8-1.09,"Right <br /> of the Standard Specifications. <br /> 10-1.12 TRAFFIC CONTROL SYSTEM FOR LANE CLOSURE sin conformance with the details shown on the <br /> A traffic control system shall consist of closing traffic lanes and tamp ,� Specifications, the <br /> plans, the provisions in Section 12, "Construction Area Traffic Control Devices, of the Standard Sp <br /> provisions the under "Maintaining Traffic" and "Construction Area Signs" of these special Provisions, and these special <br /> provisions. the <br /> s or take <br /> The provisions in this section will not relieve thethCen provisions in in Section 7b1 09,ility t�'PubliceSafety�n of the al eStandatd <br /> measures as may be necessary to comply with P <br /> Specifications. lacin , <br /> Each vehicle used to place,maintain and remove components s operation when sysvehiclenis being useultilane d fors p all g <br /> equipped with a Type II flashing arrow sign which shall b P <br /> within a stationary lane closure shall only display the caution display <br /> maintaining or removing components. Vehicles equipped with Type II flashing arrow sign not involve in placing, <br /> components when operated arrow sign <br /> maintaining or removing P components of a traffic <br /> mode. The sign shall be controllable by the ops hich are being used to place,maintain and remove ompon ng <br /> shown on the plans shall not be used on vehicles w <br /> control system and shall be in place before a lane closure requiring its use is completed. <br /> shall immediately repair the components to the original condition or replace <br /> If components in the traffic control system are displaced or cease to operate or function as specified, from any cause, <br /> during the progress of the work,the Contractor <br /> rts t the original location. <br /> the components and shall restore the comp gin l l at the end of each work period,components of the traffic <br /> be <br /> When lane and ramp closures are made for work periods y' o stored l selected central <br /> control system, except portable delineators placed along open trenches or excavation adjacent to the traveled way, <br /> the components may <br /> removed from the traveled way anif the <br /> d swiithiinethe limit of the highway Contractor so lright of way. all labor, <br /> locations designated by the Engin <br /> The contract lump sum price paid for traffic control system shall include full compensation for fvolved in urnishing all <br /> materials (including signs), tools, equipment, and incidentals, and for doing all the ooneiits of the traffic control system <br /> to new locations, replacing, and disposing of the comp y neer. <br /> storing, maintaining, moving and 1 to the item of <br /> shown on the plans,as specified in the Standard Specifications <br /> theS�dardlSpecifications shallnot t apply to he i <br /> The adjustment provisions in Section 4-1.03, "Changes," <br /> e Engineer co and will be made on the basis of the cost of the <br /> 9-1.03, <br /> traffic control system. Adjustments in compensation for traffic control system will be made only for inerease$e r increased <br /> decreased <br /> traffic control system required by changes ordered ysis as provided in <br /> or decreased traffic control necessary. The adjustment <br /> will <br /> for increased workcand estimated on the <br /> , be made on a same basis in the case of <br /> Force Account Payment, of the Standard Specificationsprovided in Section 4-1.03D of the Standard <br /> decrease work. lassed as extra work,as p <br /> Traffic control system required by work which is c <br /> Specifications,will be paid for as a part of the extra work. <br /> 10-1.13 PORTABLE CHANGEABLE MESSAGE SIGN ated, and maintained for each lane closure and <br /> Two Portable changeable message signs shall be furnished,placed, oper <br /> closure at locations designated by the Engineer and shall conform to the provisions in Section 12,"Construction <br /> one for ramp Contract No. 10-OM7104 <br /> 154 <br />