work plan. The Contractor will not be entitled to compensation for the suspension of work resulting from the late
<br /> proposed of closures.
<br /> reopening
<br /> COMPENSATION s operations the
<br /> The Engineer shall be notified of delays in the Con racto delayed or interfered with by reason of thosesconditions and
<br /> opinion of the Engineer,the Contractor's controlling opera
<br /> tion is the Contractor's loss due to that delay could not have been avoided by rescheduling the affected closure or by judicious
<br /> handling of forces, equipment and plant, the delay will be considered a right of way delay and will be compensated in
<br /> h g ht of Way Delays,"of the Standard Specifications:
<br /> conformance with the Provisions. Section 8-1.09, ,Right
<br /> within t
<br /> ad and his planned closures are he time frame allowed
<br /> 1. The Contractor's proposed Closure Schedule is den will not be entitled to
<br /> for closures in "Maintaining Traffic of these spec Provisions, except that the Contractor
<br /> roved.
<br /> compensation for amendments to the Closure Schedule that are not app
<br /> 2. The Contractor is denied a confirmed closure. roved Closure
<br /> tim
<br /> ted in the
<br /> Should the Engineer direct the Contractor
<br /> due to removalremove a closure of the cosure will beefore the onside ed a night of way delay and
<br /> Schedule, delay to the Contractors schedule
<br /> ht of Way Delays,"
<br /> compensation for the delay will be determined in conformance with the provisions in Section 8-1.09,"Right
<br /> of the Standard Specifications.
<br /> 10-1.12 TRAFFIC CONTROL SYSTEM FOR LANE CLOSURE sin conformance with the details shown on the
<br /> A traffic control system shall consist of closing traffic lanes and tamp ,� Specifications, the
<br /> plans, the provisions in Section 12, "Construction Area Traffic Control Devices, of the Standard Sp
<br /> provisions the under "Maintaining Traffic" and "Construction Area Signs" of these special Provisions, and these special
<br /> provisions. the
<br /> s or take
<br /> The provisions in this section will not relieve thethCen provisions in in Section 7b1 09,ility t�'PubliceSafety�n of the al eStandatd
<br /> measures as may be necessary to comply with P
<br /> Specifications. lacin ,
<br /> Each vehicle used to place,maintain and remove components s operation when sysvehiclenis being useultilane d fors p all g
<br /> equipped with a Type II flashing arrow sign which shall b P
<br /> within a stationary lane closure shall only display the caution display
<br /> maintaining or removing components. Vehicles equipped with Type II flashing arrow sign not involve in placing,
<br /> components when operated arrow sign
<br /> maintaining or removing P components of a traffic
<br /> mode. The sign shall be controllable by the ops hich are being used to place,maintain and remove ompon ng
<br /> shown on the plans shall not be used on vehicles w
<br /> control system and shall be in place before a lane closure requiring its use is completed.
<br /> shall immediately repair the components to the original condition or replace
<br /> If components in the traffic control system are displaced or cease to operate or function as specified, from any cause,
<br /> during the progress of the work,the Contractor
<br /> rts t the original location.
<br /> the components and shall restore the comp gin l l at the end of each work period,components of the traffic
<br /> be
<br /> When lane and ramp closures are made for work periods y' o stored l selected central
<br /> control system, except portable delineators placed along open trenches or excavation adjacent to the traveled way,
<br /> the components may
<br /> removed from the traveled way anif the
<br /> d swiithiinethe limit of the highway Contractor so lright of way. all labor,
<br /> locations designated by the Engin
<br /> The contract lump sum price paid for traffic control system shall include full compensation for fvolved in urnishing all
<br /> materials (including signs), tools, equipment, and incidentals, and for doing all the ooneiits of the traffic control system
<br /> to new locations, replacing, and disposing of the comp y neer.
<br /> storing, maintaining, moving and 1 to the item of
<br /> shown on the plans,as specified in the Standard Specifications
<br /> theS�dardlSpecifications shallnot t apply to he i
<br /> The adjustment provisions in Section 4-1.03, "Changes,"
<br /> e Engineer co and will be made on the basis of the cost of the
<br /> 9-1.03,
<br /> traffic control system. Adjustments in compensation for traffic control system will be made only for inerease$e r increased
<br /> decreased
<br /> traffic control system required by changes ordered ysis as provided in
<br /> or decreased traffic control necessary. The adjustment
<br /> will
<br /> for increased workcand estimated on the
<br /> , be made on a same basis in the case of
<br /> Force Account Payment, of the Standard Specificationsprovided in Section 4-1.03D of the Standard
<br /> decrease work. lassed as extra work,as p
<br /> Traffic control system required by work which is c
<br /> Specifications,will be paid for as a part of the extra work.
<br /> 10-1.13 PORTABLE CHANGEABLE MESSAGE SIGN ated, and maintained for each lane closure and
<br /> Two Portable changeable message signs shall be furnished,placed, oper
<br /> closure at locations designated by the Engineer and shall conform to the provisions in Section 12,"Construction
<br /> one for ramp Contract No. 10-OM7104
<br /> 154