Laserfiche WebLink
Particulate air(NEPA)filter equipped vacuum attachment operated concurrently with the removal operations or other equally <br /> effective methods approved by the Engineer. The Contractor shall submit a written work plan for the removal, storage, and <br /> disposal of yellow thermoplastic traffic stripe to the Engineer for approval not less than 15 days prior to the start of the <br /> removal operations. Removal operations shall not be started until the Engineer has approved the work plan. <br /> The removed yellow thermoplastic traffic stripe residue shall be stored and labeled in covered containers. Labels shall <br /> conform to the provisions of Title 22, California Code of Regulations, Sections 66262.31 and 66262.32. Labels shall be <br /> marked with date when the waste is generated, the words "Hazardous Waste," composition and physical state of the waste <br /> (for example, asphalt grindings with thermoplastic or paint), the word "Toxic," the name and address of the En <br /> Engineer's telephone number, contract number, and Contractor or subcontractor. The containers shall be a type approved by <br /> the United States Department of Transportation for the transportation and temporary Engineer,the removed the <br /> containers shall be handled so that no spillage will occur. The containers shall be stored in a secured fenced enclosure at a <br /> location within the project limits until disposal,as approved by the Engineer. <br /> If the yellow thermoplastic traffic stripe residue is transported to a Class 1 disposal facility as a hazardous waste, a <br /> manifest shall be used, and the transporter shall be registered with the California Department of Toxic Substance Control. <br /> The Engineer will obtain the United States Environmental Protection Agency Identification Number and sign all manifests as <br /> the generator within 2 working days of receiving sample test results and approving the test methods. <br /> Additional disposal costs for removal residue regulated under RCRA, as determined by test results, will be paid for as <br /> extra work as provided in Section 4-1.03D, "Extra Work,"of the Standard Specifications. <br /> Nothing in these special provisions shall relieve the Contractor of the Contractor's responsibilities as specified in <br /> Section 7-1.09, "Public Safety,"of the Standard Specifications. <br /> The contract lump sum price paid for Lead Compliance Plan (Stripe Removal) shall include full compensation for <br /> furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in preparing the Lead <br /> Compliance Plan, including paying the Certified Industrial Hygienist, and for providing personnel protective equipment, <br /> training, air monitoring, and medical surveillance, as specified in the Standard Specifications and these special provisions, <br /> and as directed by the Engineer. <br /> Full compensation for providing a written work plan for the removal, storage, and disposal of yellow thermoplastic <br /> traffic stripe shall be considered as included in the contract prices paid per meter for remove yellow thermoplastic traffic <br /> stripe no separate payment will be made therefor. <br /> REMOVE ROADSIDE SIGN <br /> Existing roadside signs,at those locations shown on the plans to be removed,shall be removed and disposed of. <br /> Existing roadside signs shall not be removed until replacement signs have been installed or until the existing signs are no <br /> longer required for the direction of public traffic,unless otherwise directed by the Engineer. <br /> REMOVE ROADSIDE SIGN PANEL <br /> Existing roadside sign panels,at those locations shown on the plans to be removed,shall be removed and disposed of. <br /> Existing roadside sign panels shall not be removed until replacement sign panels have been installed or until the existing <br /> signs are no longer required for the direction of public traffic,unless otherwise directed by the Engineer. <br /> 10-1.16 PILING <br /> GENERAL <br /> Piling shall conform to the provisions in Section 49, <br /> Provisions. "Piling," of the Standard Specifications, and these special <br /> Unless otherwise specified,welding of any work performed in conformance with the provisions in Section 49, "Piling," <br /> of the Standard Specifications,shall be in conformance with the requirements in AWS D1.1. <br /> Attention is directed to "Welding"of these special provisions. <br /> CAST-IN-DRILLED-HOLE CONCRETE PILES <br /> Cast-in-drilled-hole concrete piling shall conform to the provisions in Section 49-4, "Cast-In-Place Concrete Piles," of <br /> the Standard Specifications and these special provisions. <br /> The provisions of"Welding"of these special provisions shall not apply to temporary steel casings. <br /> Cast-in-drilled-hole concrete piles 600 mm in diameter or larger may be constructed by excavation and depositing <br /> concrete under slurry. <br /> Materials <br /> Concrete deposited under slurry shall have a nominal penetration equal to or greater than 90 mm. Concrete shall be <br /> proportioned to prevent excessive bleed water and segregation. <br /> Contract No. 10-0M7104 <br /> 157 <br />