Laserfiche WebLink
crash cushion modules shall be placed on movable pallets or frames conforming to the dimensions shown on <br /> Temporary Pallets <br /> pallets or frames shall provide a full bearing base beneath the modules. The modules and supporting p <br /> the plans. Thep along the Pavement or bridge deck. <br /> or frames shall not be moved by sliding or skidding g P tans,when the closest <br /> A Type R or P marker panel shall within3.6 <br /> dto the front of the of the traveled way.ash cushion The marker spanel when required, shall be firmly <br /> point of the crash cushion array is wi r by other methods determined by the Engineer. panels <br /> fastened to the crash cushion wicomm mcioal quality <br /> crashacush o dware omodules, sand filling, pallets or frames, and market'P <br /> At the completion of the project, P �y crash cushion <br /> shall become the property of the Contractor and shall be removed from the site of the work. Temporary <br /> modules shall not be installed in the permanentlaced work-in conformance with the provisions in "Public Safety" of these special <br /> Temporary crash cushion modules p <br /> provisions will not be measured nor paid for. <br /> 10-1.15 EXISTING HIGHWAY FACILITIES <br /> The work performed in connection with various existing high <br /> nd twhese special p ovisionsv facilities shall r to the provisions in Section 15, <br /> "Existing Highway Facilities,"of the Standard Specifications a <br /> REMOVE PAVEMENT MARKER <br /> ive, when no longer required for traffic lane delineation as <br /> Existing pavement markers, including underlying <br /> hes <br /> determined by the Engineer,shall be removed and disposed of <br /> REMOVE TRAFFIC STRIPE AND PAVEMENT MARKING tans and as directed by the <br /> Traffic stripe and pavement marking shall be removed at the locations shown on the p <br /> Engineer. eater than <br /> Attention is directed to"Water Pollutionthermoplastic traffic stripe con ins,lead chromate in average concentrations gr tans. <br /> Waste from removal of yellow th00 m Total Lead. yellow thermoplastic traffic stripe-exist as shown on the p <br /> or equal to 5 mg/L Soluble Lead or 1000 mg/kg thermoplastic contains heavy metals in concentrations <br /> that exceed <br /> Contractor <br /> Residue produced from the removal of yellow 22 of the yellow <br /> established e t the California Health andety underthe Federae and l Resource Conservation on and Recovery Act(RCRA). <br /> shall assume that the residue is noregulated <br /> thermoplastic may produce toxic fumes when heated. <br /> s after accumulating 100 kg of residue and dust. The Contractor <br /> The removed yellow thermoplastic shall be disposed of at a Class 1 disposal facility in conformance wi the <br /> requirements of the disposal facility operator within 20 day lastic residue as required by the disposal facility an <br /> shall make necessary arrangements to test the yellow hermop <br /> shall include, at a minimum, (1) Total Lead by EPA Method 6010B and ChromiumSoluble Lead and <br /> special provisions. Testing California Waste Extraction Test, and (3) <br /> Method 7000 series, (2) Soluble Lead and Chromium by on les shall <br /> Chromium by Total CharacteL of <br /> ristic Leaching Procedure. From samples shall be taken waste or porti analyzed individually ss Samples of <br /> waste are produced, a minimum of four randomly selected P areproduced,a minimum <br /> not be composited. From each additionalll 3360 L of waste or taken and analyzed.P rtiEach samplon e shall be homogenized if less than 3prior to analysis by the <br /> one additional random sample shall le aliquot sufficient to cover he amount necessary for the total and the srun le <br /> laboratory performing the analyses. A samp q <br /> analyses shall then be taken. This aliquot shall bno°n ludo grinding of he samples. Thezed a second time and the land Contractorie(if necessary)shall submit the name <br /> this aliquot. The homogenization process slid <br /> traffic stripe. The analytical laboratory shall be certified by the <br /> and location of the disposal facility and analytical laboratory along with he testing requirements to the Engineer not less an <br /> 5 days prior to the start of removal of yellow thermoplasticAccreditation Program for all analyses to be performed. Test <br /> Department of Health Services Environmental Laboratory the disposal facility,prior <br /> results shall be provided to the Engineer for review�dor to sigremoval of he waste aste from he site.y p <br /> to issuing an EPA identification number,and p Prevent <br /> or minimize worker exposure to lead <br /> The Contractor shall prepare a project specific Lead Compliance Plan to p <br /> Regulations, <br /> while handling removed yellow thermoplastic residue, Attwh�wi directed <br /> g with lead.. 8, California Code of <br /> Section 1532.1,"Lead,"for specific Cal-OSHA requirementsa personnel who have no prior training, including State personnel, <br /> Prior to removing yellow thermoplastic traffic stripe, <br /> shall coin lete a safety training program provided by the Contractor that meets the requirements of Title 8, California Code <br /> P <br /> of Regulations,Section 1532.1,"Lead, and theContractor's <br /> washing rfacilities required by therContractor's Lead Compliance Plan shall <br /> Personal protective equipment,training, g personnel will <br /> be supplied to State personnel by he ContrToved b the Engine ctor. The number ofSareeused to removebyellow thermoplastic traffic stripe, <br /> the <br /> Where grinding or other methods app Y <br /> removed residue, including dust, shall be contained and collected immediately. Collection shall be by a high efficiency <br /> Contract No. 10-OM7104 <br /> 156 <br />