My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MATERIAL <br /> The Contractor shall furnish batteries compatible with the State-furnished BBS and suitable for outdoor applications. <br /> Batteries shall: <br /> A. have voltage rating 12 V, <br /> B. be group size 24, <br /> C. be 75 to 80 ampere-hour at 20 hour rate, <br /> D. be commercially available and stocked locally, <br /> E. have a carrying handle, <br /> F. be marked with date code and maximum recharge data and recharge cycles, <br /> G. have 2 top mounted terminal posts with recessed thread lugs for 6.35 mm diameter, 20 thread count per 25.4 mm <br /> bolts, <br /> H. be fully charged when furnished,and <br /> I. be free from damage or deformities. <br /> The Contractor shall provide 4 batteries per BBS installation. <br /> The batteries shall be deep cycle, sealed prismatic lead-calcium based absorbed glass mat/valve regulated lead acid <br /> (AGM/VRLA). <br /> The batteries shall be certified by the manufacturer to operate over a temperature range of-25°C to 74°C. <br /> The Contractor shall submit the battery data sheet to the Engineer when the batteries are delivered to the jobsite. The <br /> data sheet shall include the following features: <br /> A. model number, <br /> B. serial number, <br /> C. dimensions, <br /> D. charts, <br /> E. table of discharge rating, <br /> F. product information, <br /> G. battery specifications,and <br /> H. conductivity reading per battery(in Siemens). <br /> The batteries shall have a written warranty against defects in materials and workmanship from the manufacturer prorated <br /> for a period of 60 months after installation. The Contractor shall provide the Engineer with all warranty documentation prior <br /> to installation. Replacement batteries shall be provided within 5 days after receipt of failed batteries at no cost to the State <br /> except the cost of shipping the failed batteries. Replacement batteries shall be delivered to Caltrans Maintenance Electrical <br /> Shop at 1604 South B St, Stockton,CA 95206. <br /> MOUNTING AND CONFIGURATION <br /> Details for attaching the external cabinet to the controller cabinet and for wiring the State-furnished BBS will be <br /> provided in an information handout described in"Project Information"of these special provisions. <br /> The Contractor shall mount the external cabinet to the controller cabinet on the side opposite the police panel as shown <br /> in the information handout. <br /> The Contractor shall apply a pliable seal composed of caulking compound or mastic around the gap between the external <br /> cabinet and the controller cabinet. <br /> erter/charger, power transfer relay, and the manual bypass switch inside the <br /> The Contractor shall mount the BBS inv <br /> external cabinet. The inverter/charger, the power transfer relay and the manual bypass switch shall be mounted on the <br /> external cabinet shelf. <br /> The Contractor shall assemble the State-furnished BBS equipment in accordance with the manufacturer's <br /> recommendations. <br /> Functional Testing <br /> The BBS functional test shall include at least 30 minutes of continuous, satisfactory operation with utility power turned <br /> off. Testing will be performed in the presence of the Engineer. <br /> Contract No. 10-OM7104 <br /> 180 <br />
The URL can be used to link to this page
Your browser does not support the video tag.