Laserfiche WebLink
10-3.14 DETECTORS <br /> Loop detector sensor units will be State-furnished in conformance with the provisions in "Materials" of these special <br /> provisions. <br /> Loop wire shall be Type 2. <br /> Loop detector lead-in cable shall be Type B. <br /> Slots shall be filled with hot-melt rubberized asphalt sealant. <br /> 10-3.15 LUMINAIRES <br /> Ballasts shall be 120/240 V multi-tap and shall be the lag or lead regulator type. <br /> 10-3.16 PHOTOELECTRIC CONTROLS <br /> Contactors shall be the mechanical armature type. <br /> 10-3.17 REMOVING,REINSTALLING OR SALVAGING ELECTRICAL EQUIPMENT <br /> Salvaged electrical materials shall be hauled to 1604 South B Street,Stockton,CA and stockpiled. <br /> The Contractor shall provide the equipment,as necessary,to safely unload and stockpile the material. A minimum of 2 <br /> working days'notice shall be given prior to delivery. <br /> 10-3.18 PAYMENT <br /> d lighting shall include highway lighting at intersections in <br /> The contract lump sum price or prices paid for signal an <br /> connection with signals only. <br /> Other roadway lighting on the project shall be considered as included in the contract lump sum price paid for highway <br /> lighting. <br /> Full compensation for hauling and stockpiling electrical materials shall be considered as included in the contract price <br /> paid for the item requiring the material to be salvaged and no additional compensation will be allowed therefor. <br /> Full compensation for the battery backup system shall be considered as included in the contract lump sum price paid for <br /> signal and lighting at the locations involved and no separate payment will be made therefor. <br /> If any of the fabrication sites for the materials listed are located more than 480 air line kilometers from both Sacramento <br /> and Los Angeles, additional shop inspection expenses will be sustained by the State. Whereas it is and will be impractical <br /> and difficult to determine the actual increase in these expenses, it is agreed that payment to the Contractor for furnishing <br /> these listed materials from each fabrication site located more than 480 air line kilometers from both Sacramento and Los <br /> Angeles will be reduced$1500: <br /> 1. Service equipment enclosures <br /> Contract No. 10-OM7104 <br /> 181 <br />