My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• The specifications are written to the Bidder before award and the Contractor after. Before award,interpret sentences <br /> written in the imperative mood as starting with The Bidder must and interpret you as the Bidder and your as e <br /> Bidder's." After award, interpret sentences written in the imperative mood as starting with "The Contractor must" and <br /> interpret"you"as"the Contractor"and"your"as"the Contractor's." <br /> • Unless an object or activity is specified to be less than the total,the quantity or amount is all of the object or activity. <br /> • A list in the specifications is inclusive unless the items listed are specified as choices. - <br /> • Interpret terms as defined in the Contract documents. A term not defined in the Contract documents has the <br /> meaning defined in Means Illustrated Construction Dictionary,Condensed Version,Second Edition. <br /> Section 1,"Definitions and Terms,"of the Standard Specifications is amended by adding the following sections: <br /> 1-1.082 BUSINESS DAY <br /> • Day on the calendar except Saturday or holiday. <br /> 1-1.084 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES <br /> • The California Manual on Uniform Traffic Control Devices for Streets and Highways(California MUTCD)is issued <br /> by the Department of Transportation and is the Federal Highway Administration's MUTCD 2003 Edition,as amended for use <br /> in California. Part 6 of the California MUTCD,"Temporary Traffic Control,"supersedes the Department's Manual of Traffic <br /> Controls. <br /> 1-1.245 HOLIDAY <br /> • Day designated as a State holiday under Govt Code § 6700 et seq. except September 9th, "Admission Day." The <br /> day after Thanksgiving Day is a non-working day. Interpret"legal holiday"as"holiday." <br /> Section 1-1.25,"Laboratory,"of the Standard Specifications is amended to read: <br /> 1-1.25 LABORATORY <br /> • The Division of Engineering Services - Materials Engineering and Testing Services and Division of Engineering <br /> Services - Geotechnical Services of the Department of Transportation, or established laboratories of the various Districts of <br /> the Department,or other laboratories authorized by the Department to test materials and work involved in the contract. When <br /> a reference is made in the specifications to the"Transportation Laboratory,"the reference shall mean Division of Engineering <br /> Services-Materials Engineering and Testing Services and Division of Engineering Services-Geotechnical Services,located <br /> at 5900 Folsom Boulevard,Sacramento,CA 95819,Telephone(916)227-7000. <br /> Section 1-1.255,"Legal Holidays,"of the Standard Specifications is deleted. <br /> Section 1-1.265,"Manual of Traffic Controls,"of the Standard Specifications is deleted. <br /> Section 1-1.275,"Office of Structure Design,"of the Standard Specifications is amended to read: <br /> 1-1.275 OFFICES OF STRUCTURE DESIGN <br /> • The Offices of Structure Design of the Department of Transportation. When the specifications require working <br /> drawings to be submitted to the Offices of Structure Design,the drawings shall be submitted to: Offices of Structure Design, <br /> Documents Unit,Mail Station 9-4/41, 1801 30th Street,Sacramento,CA 95816,Telephone(916)227-8252. <br /> Section 1-1.39,"State,"of the Standard Specifications is amended to read: <br /> 1-1.39 STATE <br /> • The State of California, including its agencies, departments, or divisions,whose conduct or action is related to the <br /> work. <br /> Contract No. 10-OM7104 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.