Laserfiche WebLink
California,and shall include the soil classification,soil properties,soil design calculations that demonstrate adequate stability <br /> of the protective system,and any other design calculations used in the preparation of the plan. <br /> • No plan shall allow the use of a protective system less effective than that required by the Construction Safety <br /> Orders. <br /> • If the detailed plan includes designs of protective systems developed only from the allowable configurations and <br /> slopes, or Appendices, contained in the Construction Safety Orders, the plan shall be submitted at least 5 days before the <br /> Contractor intends to begin excavation. If the detailed plan includes designs of protective systems developed from tabulated <br /> data, or designs for which design by a registered professional engineer is required, the plan shall be submitted at least 3 <br /> weeks before the Contractor intends to begin excavation. <br /> • Attention is directed to Section 7-1.O1E,"Trench Safety." <br /> SECTION 7: LEGAL RELATIONS AND RESPONSIBILITY <br /> Issue Date: December 11,2006 <br /> The eighth paragraph of Section 7-1.09, "Public Safety"of the Standard Specifications is amended to read: <br /> • Signs,lights,flags,and other warning and safety devices and their use shall conform to the requirements set forth in <br /> Part 6 of the California MUTCD. Signs or other protective devices furnished and erected by the Contractor, at the <br /> Contractor's expense, as above provided, shall not obscure the visibility of, nor conflict in intent, meaning and function of <br /> either existing signs, lights and traffic control devices or any construction area signs and traffic control devices for which <br /> furnishing of, or payment for, is provided elsewhere in the specifications. Signs furnished and erected by the Contractor, at <br /> the Contractor's expense,shall be approved by the Engineer as to size,wording and location. <br /> The fourteenth paragraph of Section 7-1.09, "Public Safety,"of the Standard Specifications is amended to read: <br /> • The Contractor shall notify the Engineer not less than 18 days and no more than 90 days prior to the anticipated start <br /> of an operation that will change the vertical or horizontal clearance available to public traffic(including shoulders). <br /> The sixteenth paragraph of Section 7-1.09, "Public Safety,"of the Standard Specifications is amended to read: <br /> • When vertical clearance is temporarily reduced to 4.72 in or less, low clearance warning signs shall be placed in <br /> accordance with Part 2 of the California MUTCD and as directed by the Engineer. Signs shall conform to the dimensions, <br /> color, and legend requirements of the California MUTCD and these specifications except that the signs shall have black <br /> letters and numbers on an orange retroreflective background. W12-2P signs shall be illuminated so that the signs are clearly <br /> visible. <br /> Section 7-1.O1A(6), "Workers'Compensation,"of the Standard Specifications is amended to read: <br /> 7-1.101A(6) (Blank) <br /> Section 7-1.12,"Indemnification and Insurance,"of the Standard Specifications is amended to read: <br /> 7-1.12 INDEMNIFICATION AND INSURANCE <br /> • The Contractor's obligations regarding indemnification of the State of California and the requirements for insurance <br /> shall conform to the provisions in Section 3-1.025, "Insurance Policies," and Sections 7-1.12A, "Indemnification," and <br /> 7-1.12B, "Insurance,"of this Section 7-1.12. <br /> 7-1.12A Indemnification <br /> • The Contractor shall defend, indemnify, and save harmless the State, including its officers, employees, and agents <br /> (excluding agents who are design professionals) from any and all claims, demands, causes of action, damages, costs, <br /> expenses, actual attorneys' fees, losses or liabilities, in law or in equity (Section 7-1.12A Claims) arising out of or in <br /> connection with the Contractor's performance of this contract for: <br /> 1. Bodily injury including, but not limited to, bodily injury, sickness or disease, emotional injury or death to persons, <br /> including, but not limited to, the public, any employees or agents of the Contractor, the State, or any other <br /> contractor;and <br /> Contract No. 10-OM7104 <br /> 9 <br />