Laserfiche WebLink
F. Cleanup <br /> Remove and transport debris, rubbish, and excess material from the site in a manner that <br /> will prevent spillage on streets or adjacent areas. Clean up spillage from streets and <br /> adjacent areas. Comply with Federal, State, and local hauling disposal regulations. Cleanup <br /> shall be an ongoing activity throughout the contract period. <br /> G. Disposal of Materials <br /> All materials removed from clearing and grubbing shall become the property of the <br /> Contractor unless designated by the Construction Manager and shall be removed from the <br /> project site. Contractor shall make his own arrangements for disposing of materials outside <br /> the project site and he shall pay all costs involved. Arrangements shall include, but not be <br /> limited to, entering into agreements with property owners and obtaining necessary permits, <br /> licenses and environmental clearances. <br /> **END OF SECTION** <br /> Walnut Grove Sewer Project (Conformed) 02100-3 SA0160401 <br /> March 2008 n:Asa0160401\specs\wg conform div A0 1 OO.doc <br />