My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 02160 <br /> EXCAVATION SUPPORT SYSTEMS <br /> substantiate compliance with this specification. Specific information to be submitted <br /> includes the following: <br /> A. Soil parameters used in proposed shoring system design. <br /> B. Anticipated deflections associated with proposed shoring system. <br /> C. Monitoring system for measuring horizontal and vertical movements of the shoring <br /> system. <br /> PART 2 - PR01DUCTL S <br /> Not used <br /> PART 3 - EXECUTION <br /> 3.01 GENERAL <br /> The construction of sheeting, shoring, and bracing shall not disturb the state of soil <br /> adjacent to the trench and below the excavation bottom. Horizontal and vertical <br /> movements of the shoring system should be monitored by establishing survey points along <br /> the excavation. The Contractor shall obtain measurements on a daily basis for a period of <br /> one week during excavation and following construction of the shoring system. <br /> Measurements shall be obtained on a weekly basis thereafter as directed by the <br /> Construction Manager. Measurements shall be submitted to the Construction Manager for <br /> subsequent review. <br /> 3.02 SEQUENCE <br /> Trench excavation shall not be started until the design for trench support has been accepted <br /> by the Construction Manager. <br /> **END OF SECTION** <br /> Walnut Grove Sewer Project(Conformed) 02160-2 SA0160401 <br /> March 2008 nAsa0160401\specs\wg conform\div 2\02160.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.