My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 02310 <br /> HORIZONTAL DIRECTIONAL DRILLING <br /> PART 1 - GENERAL <br /> 1.01 DESCRIPTION <br /> A. Scope <br /> This section covers the installation and testing of dual 10-inch diameter sewer force mains <br /> in a 24-inch steel casing for the crossing under Snodgrass Slough (McCormack-Williamson <br /> Tract), in a single bore for the crossings under Mokelumne River and Middle Slough at the <br /> lines and grades indicated on the plans. The installation of the dual HDPE pipelines in a <br /> casing or a single bore under each waterway shall be by horizontal directional drilling <br /> (HDD) methods in accordance with the plans and specifications. The drilling shall be <br /> performed only with equipment adequate for the length and diameter of the bore, the <br /> required pipe pulling forces and the existing geologic conditions. Directional control <br /> methods shall be employed which will ensure the location of the bore with the required <br /> accuracy. <br /> The directionally controlled horizontal drilling operation shall consist of drilling a small <br /> diameter pilot hole; reaming the pilot hole to a diameter suitable for installation of a pull <br /> section and steel casing where indicated; or installing a pull section and dual pipes; all in <br /> accordance with the specifications. HDD installation under the Snodgrass Slough <br /> (McCormack-Williamson Tract) shall require a steel casing, minimum of 24-inch diameter <br /> with a 0.5-inch minimum wall thickness. <br /> The Contractor shall furnish and install all necessary pipe, fittings, connections, valves, <br /> appurtenances, and accessories to install the pipelines as shown on the plans. The <br /> Contractor's equipment and directional control methods shall be approved by the <br /> Construction Manager prior to the beginning of work. The Contractor shall maintain all <br /> equipment in good condition at all times and shall use all reasonable and appropriate means <br /> to prevent and control loss of circulation and to protect the borehole. <br /> Walnut Grove Sewer Project(Conformed) 02310-1 SAO 160401 <br /> March 2009 N:sa0160401vSpecs\WG Conform\Div 2v02310.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.