Laserfiche WebLink
Section 02310 <br /> HORIZONTAL DIRECTIONAL DRILLING <br /> 1.02 QUALITY ASSURANCE <br /> A. References <br /> The publications referred to hereinafter form a part of this specification to the extent <br /> referenced. The publications are referred to in the text by the basic designation only. The latest <br /> edition of referenced publications in effect at the time of the bid shall govern, except where a <br /> specific date or edition is given below. In case of conflict between the requirements of this <br /> section and the listed standards, the requirements of this section shall prevail. <br /> American Society for Testing and Materials (ASTM) Publications: <br /> ASTM C423 Standard Test Method for Sound Absorption and Sound <br /> Absorption Coefficients by the Reverberation Room Method <br /> ASTM D 117 Standard Guide for Sampling, Test Methods, Specifications, <br /> and Guide for Electrical Insulating Oils of Petroleum Origin <br /> ASTM E90 Standard Test Method for Laboratory Measurement of <br /> Airborne Sound Transmission Loss of Building Partitions and <br /> Elements <br /> ASTM F1962 Standard Guide for Use of Maxi-Horizontal Directional <br /> Drilling for Placement of Polyethylene Pipe or Conduit <br /> Under Obstacles, Including River Crossings <br /> Federal Test Method Standard (FTMS) Publications: <br /> FTMS 191 A-M5102 <br /> 1.03 SUBMITTALS <br /> The Contractor shall submit proposed construction operations and schedules to the <br /> Construction Manager a minimum of 30 days prior to beginning work. Details shall include <br /> types of equipment, construction procedures, material and equipment delivery schedules, <br /> type of drilling fluid, viscosity and weight limits, bit pressures, method of disposal and <br /> destination of drilling fluids, and all other pertinent information. <br /> Complete layout drawings, details, and specifications covering HDD and installation <br /> procedures and materials shall be submitted in accordance with the Special Provisions, <br /> Section SP-08, SUBMITTALS. <br /> Walnut Grove Sewer Project(Conformed) 02310-2 SA0160401 <br /> March 2008 N:\sa0160401\Specs\WG Conform\Div 2\02310.doc <br />