My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 02310 <br /> HORIZONTAL DIRECTIONAL DRILLING <br /> Submittals shall include complete working descriptions and drawings describing the details <br /> of the proposed method of construction and the sequence of operations. The procedures <br /> shall detail the method of pilot hole drilling, reaming, pipe welding, pipe stringing and <br /> bundling, pull back methods, excavations, shoring and bracing, and dewatering techniques if <br /> necessary, that are proposed to be used. Submittals shall include the following: <br /> A. Plan Drawings <br /> Plan drawings of proposed drill side and pipe side construction area requirements. Drawing <br /> shall show entrance and exit hole pits, equipment layout, material storage areas, security <br /> fencing layout and gates, and proposed storage, fabrication and pullback staging areas for <br /> the conduit pipe. <br /> B. Plan of Execution <br /> Written plan of execution, including proposed procedures and sequencing for excavation, <br /> pilot hole drilling and tracking, reaming, pipe fabrication and staging, pipe pullback, and <br /> noise mitigation. <br /> C. Construction Milestone Schedule <br /> A construction milestone schedule showing the following activities related to each of the <br /> bores as a minimum: <br /> 1. Site preparation <br /> 2. Drill side equipment mobilization and setup <br /> 3. Pipe delivery <br /> 4. Fusing or welding pipe <br /> 5. Staging pipe strings <br /> 6. Drilling of pilot holes <br /> 7. Reaming <br /> 8. Pipe pull back <br /> 9. Equipment demobilization <br /> Walnut Grove Sewer Project(Conformed) 02310-3 SA0160401 <br /> March 2008 N:Asa0I60401\Specs\WG Conform\Div 2\02310.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.