My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 02310 <br /> HORIZONTAL DIRECTIONAL DRILLING <br /> 3.12 PIPE TESTING <br /> The pipelines shall be tested hydrostatically prior to the HDD pullback operation and after <br /> pulling the mandrel through the HDPE pipes in accordance with the pipeline pressure and <br /> leakage requirements specified in Section 15072, HIGH DENSITY POLYETHYLENE <br /> PIPE. <br /> 3.13 TRANSITION BETWEEN PIPELINE SECTIONS <br /> Following the pressure testing and acceptance of the HDPE pipelines, the Contractor shall <br /> secure blind flanges to both ends of each pipeline installed. The Contractor shall provide all <br /> necessary fittings and appurtenances for the transition joints. <br /> 3.13 ADJACENT UNDERGROUND UTILITIES <br /> Drilling operations will be conducted in a location which contains other underground <br /> utilities. Therefore, the Contractor must undertake the following steps: <br /> 1. Contact the local "one call" system, if available, to determine the presence of any <br /> adjacent underground utilities. <br /> 2. Verify the location of all adjacent underground utilities,including exposing any utilities <br /> which are located within 10 feet of the designed drilled path. <br /> 3. Modify drilling practices or downhole assemblies to prevent damage to adjacent <br /> underground utilities. <br /> 3.15 INSPECTION <br /> The work will be inspected and released by the Construction Manager who will carry out <br /> general inspection of the work with specific concern for proper performance of the work as <br /> specified and/or called for in the Contract Documents. It is the Contractor's responsibility <br /> to request timely inspections prior to proceeding with further work that would make parts of <br /> the work inaccessible or difficult to inspect. <br /> **END OF SECTION** <br /> Walnut Grove Sewer Project(Conformed) 02310-18 SA0160401 <br /> March 2008 NAsa0160401\Specs\WG Conform\Div 2\02310.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.