My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 15060 <br /> PIPING SYSTEMS <br /> A. Shop Drawings <br /> Detailed, dimensioned piping layout and support shop drawings to scale for all piping <br /> systems, including specific locations of all anchors, supports, braces and instrument taps. <br /> Piping layout and support drawings shall be submitted for information only in accordance <br /> with Special Provisions Section SP-08, SUBMITTALS a minimum of 6 weeks prior to <br /> construction. <br /> B. Manufacturer's Data <br /> i. lvianufactUrer'S data and catalog infGriiiatiGri for all. piping SySteiiL components <br /> including: <br /> a. Pipe material identified with ASTM or other conformance standard. <br /> b. Flanges, fittings, connections, gaskets. <br /> C. Valves and appurtenances. <br /> 2. Manufacturer's catalog information, pressure rating and materials of construction for <br /> mechanical joint restraints. <br /> C. Flushing and Disinfection Plan <br /> Contractor's plan describing step by step procedures for flushing and disinfecting pipelines. <br /> 1.04 OPERATION AND MAINTENANCE INFORMATION <br /> Submit operation and maintenance instructions in accordance with Section 01730, <br /> OPERATING.AND MAINTENANCE INFORMATION. A copy of Section 01730 with <br /> each paragraph check marked to show compliance shall be submitted. O&M instructions <br /> shall be submitted after the submittals specified in Paragraph 1.03 of this section have been <br /> returned "NO EXCEPTIONS TAKEN" or"MAKE CORRECTIONS NOTED". O&M <br /> instructions shall reflect the approved materials and equipment. <br /> 1.05 DEFINITIONS <br /> Terms used in Section 15060, PIPING SYSTEMS and elsewhere in Division 15 are defined <br /> as follows: <br /> 1. Pressure Terms: <br /> a. Maximum: The greatest continuous pressure at which the piping system <br /> operates. <br /> Walnut Grove Sewer Project(Conformed) 15060-2 SA0160401 <br /> March 2008 nAsa0160401\specs\wg conform\div 15\15060.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.