My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 15060 <br /> PIPING SYSTEMS <br /> 2.03 DIELECTRIC ISOLATION <br /> A. General <br /> All buried metallic piping shall be dielectrically isolated from all other metal piping, <br /> hangers,brackets, steel reinforcing and all other metal structures. All piping shall be <br /> dielectrically isolated from piping or other materials constructed from dissimilar metals. <br /> B. Flange Insulators <br /> Flange dielectric insulation sets shall contain full faced gaskets, full length sleeves, and <br /> double insulating washers or as specifically indicated on the plans. Insulation material for <br /> the flange insulation sets shall be phenolic resin and flange faced gaskets shall be neoprene <br /> faced phenolic resin. All insulating materials shall be of a type designated by the <br /> manufacturer as suitable for use at the operating and test pressures specified in piping <br /> system specification sheets at the end of this section. <br /> C. Wall Penetrations <br /> All penetrations through reinforced concrete walls shall be constructed to prevent metal to <br /> metal contact between the pipe and reinforcing steel in the wall. Details shall be as shown <br /> on the plans. <br /> D. Insulating Unions <br /> Insulating unions shall meet Fed. Spec. WW-U-532, Class 1 requirements for dimensional, <br /> strength, and pressure requirements. insulation barrier shall limit galvanic current to i% of <br /> the short circuit current in a corresponding metallic joint. The insulating material shall be <br /> impervious to water. Each connector shall match the type of material to which it connects. <br /> E. Pipe Supports <br /> Any pipe hangers, supports, brackets and saddles installed on the buried side of dielectric <br /> insulators on the protected pipe shall be dielectrically isolated from the pipe by insertion of <br /> dielectric insulating material between the hanger and the pipe. <br /> PART 3 -EXECUTION <br /> 3.01 INSTALLATION <br /> A. Location <br /> Walnut Grove Sewer Project(Conformed) 15060-4 SA0160401 <br /> March 2008 nAsa0160401\specs\w9 conform\div 15\15060.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.