My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 15060 <br /> PIPING SYSTEMS <br /> shall be installed within 2 feet of the concrete. Particular care shall be taken to ensure a full <br /> support of the pipe in the earth between and beyond the joints. <br /> Buried or encased pipe shall pass through wall or floor penetration before making buried or <br /> encased to not buried piping transition. Where required for resistance to pressure, sleeve <br /> type couplings and bell and spigot joints shall be restrained as specified in the individual <br /> piping sections. <br /> G. Process Instrumentation Connections <br /> �Pl1rocess instrument taps shall <br /> be as shown in the detail drawings.CLoc1a/ttion, sizeand <br /> oln ent.a tion of taps shall be coordinated ith the requirements of Venni ons 1.6 10, PROME�`JV <br /> INSTRUMENTATION AND CONTROL SYSTEMS. Direct drill and tap shall not be <br /> acceptable. <br /> H. Takedown Couplings <br /> Takedown couplings shall be screwed unions, flanged or grooved end mechanical coupling <br /> type joints and shall be provided as specified. Flanged or grooved end joints shall be <br /> employed on pipelines 2-1/2 inches in diameter and larger. Where piping passes through <br /> walls, takedown coupling shall be provided within 3 feet of the wall, unless specified <br /> otherwise. A union or flanged connection shall be provided within 2 feet of each threaded <br /> end valve. <br /> 3.02 PIPING IDENTIFICATION <br /> After application of the specified coating and insulation systems, exposed piping, interior <br /> and exterior, and piping in ceiling spaces, pipe trenches, pipe chases and valve boxes shall <br /> be identified with plastic markers as specified in Part 2.02A,Plastic Coding Markers of this <br /> section. Legend markers and directional arrows shall be located at each side of walls, floors <br /> and ceilings, at one side of each piece of equipment, at piping intersections, elbows and at <br /> approximately 50-foot centers. <br /> 3.03 VALVE IDENTIFICATION <br /> For all motor operated valves, stainless steel tags bearing the specified valve number <br /> stamped in 1/4-inch high letters shall be attached to the valve stem by stainless steel jack <br /> chain. In addition, plastic coding markers in accordance with Paragraph 2.02A, Plastic <br /> Coding Markers of this section with the valve number installed on the pipe next to each <br /> valve. <br /> 3.04 CLEANING <br /> A. General <br /> Walnut Grove Sewer Project(Conformed) 15060-6 SA0160401 <br /> March 2008 n:\sa0160401\specs\wgconform\div 15\15060.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.