My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-1000 thru EP-08-1999
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-1000 thru EP-08-1999_ - EP-08-1584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:53:01 AM
Creation date
12/30/2015 8:43:38 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-1584
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-1000 thru EP-08-1999
Year2
2008
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-08-1584
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 15060 <br /> PIPING SYSTEMS <br /> Temporary screens shall be sized in accordance with the following table. <br /> Pump suction or Maximum screen <br /> piping size, inches opening, inches <br /> 0 - 1 1/16 <br /> 1 1/4 - 3 1/4 <br /> 3 1/2 - 6 1/2 <br /> Over 6 1 <br /> Temporary screens having a maximum screening opening of 1/16 inch shall be inserted in <br /> pipelines at the suction of compressors and blowers. <br /> All temporary screens shall be provided with locator tabs which remain visible from the <br /> outside when the screens are in place. <br /> Following flushing, as a precaution, the Contractor shall maintain the screens in place <br /> during testing, initial start-up, and initial operating phases of the reliability testing process. <br /> In special cases, screens may be removed as required for performance tests. The Contractor <br /> may remove the temporary screens and make the final piping connections after the screens <br /> have remained clean for at least 24 consecutive hours of operation. Systems handling solids <br /> are exempted. Screen installation and removal shall be included in the master test log <br /> required by Section 01660, INSTALLATION, TESTING, AND COMMISSIONING. <br /> D. Flushing Plan <br /> The Contractor shall submit a detailed flushing plan. The Contractor's flushing plan shall be <br /> incorporated into the piping test plans and log specified under Section 01660, <br /> INSTALLATION, TESTING, AND COMMISSIONING. <br /> Flushing means and methods for pipes shall be proposed by the Contractor and submitted in <br /> the flushing plan. <br /> 3.07 CLEANING, TESTING, AND FLUSHING OF POTABLE WATER LINES <br /> All potable water lines shall be cleaned, tested, disinfected, and flushed in accordance with <br /> Paragraphs 3.04 through 3.06 of this section and AWWA C651. <br /> 3.08 PIPING SYSTEM SPECIFICATION SHEETS (PIPESPEC) <br /> Piping and valves are specified on individual Piping System Specification sheets <br /> (PIPESPEC). Piping services specified in the PIPESPECS and shown on the plans are <br /> alphabetically arranged by designated service abbreviations. Existing pipe systems may vary <br /> from the PIPESPEC. The Contractor shall field verify the pipe type, location and <br /> arrangement required for each connection to existing pipe systems. <br /> Wafnut Grove Sewer Project(Conformed) 15060-10 SA0160401 <br /> March 2008 nAsa0160401\specs\wg conform\div 15\15060.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.