Laserfiche WebLink
36. Limited storage of construction material and equipment within the County right-of-way will be <br /> allowed as authorized by the County engineer. <br /> 37. County roads shall be kept clean from mud and debris at all times along the access points and <br /> work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> 38. In addition to standard dust control measures,streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily,or <br /> as needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 39. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> Notes: <br /> 1. Dewatering operations are not a part of this permit. <br /> 2. Transportation permitting is not a part of this permit. <br /> 4of4 <br />