My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-3001 thru EP-08-4000_ - EP-08-3102
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2008
>
EP-08-3001 thru EP-08-4000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2008_EP-08-3001 thru EP-08-4000_ - EP-08-3102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:57:26 AM
Creation date
12/30/2015 11:06:36 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-08-3102
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2008\EP-08-3001 thru EP-08-4000
Year2
2008
Supplemental fields
Applicant
REEVES SAND & GRAVEL, INC
Contracts
CrossReference
Date Entered
11/4/2008
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S OF MCDONALD R.D. 1/2 MILES W/O HOLT RD
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TC-3 - Entrance/'Outlet Tire Wash <br /> ■ Provide a drainage ditch that will convey the runoff from the wash area to a sediment <br /> trapping device. The drainage ditch should be of sufficient grade;width, and depth to carry <br /> the wash runoff. <br /> ■ Use hoses with automatic shutoff nozzles to prevent hoses from being left on. <br /> ■ Require that all employees, subcontractors, and others that leave the site with mud caked <br /> tires and undercarriages to use the wash facility. <br /> ■ Implement SC-7,Street Sweeping and Vacuuming, as needed. <br /> Costs <br /> Costs are low for installation of wash rack. <br /> Inspection and Maintenance <br /> ■ Inspect and verify that activity—based BMPs are in place prior to the commencement of <br /> associated activities. While activities associated with the BMP are underway, inspect weekly <br /> during the rainy season and of two-week intervals in the non-rainy season to verify <br /> continued BMP implementation. <br /> ■ Inspect BMPs subject to non-stormwater discharge daily while non-stormwater discharges <br /> occur. <br /> ■ Remove accumulated sediment in.wash rack and/or sediment trap to maintain system <br /> performance. <br /> ■ Inspect routinely for damage and repair as needed. <br /> References <br /> Blueprint for a Clean Bay: Best Management Practices to Prevent Stormwater Pollution from <br /> Construction Related Activities; Santa Clara Valley Nonpoint Source Pollution Control Program, <br /> 1995. <br /> Coastal Nonpoint Pollution Control Program; Program Development and Approval.Guidance, <br /> Working Group,Working Paper; USEPA,April 1992. <br /> Manual of Standards of Erosion and Sediment Control Measures,Association of Bay Area <br /> Governments,May 1995• <br /> Stormwater Quality Handbooks Construction Site Best Management Practices (BMPs)Manual, <br /> State of California Department of Transportation(Caltrans),November 2000. <br /> Stormwater Management for Construction Activities,Developing Pollution Prevention Plans <br /> and Best Management Practices, EPA 832-R-92005; USEPA,April 1992. <br /> 2 of 3 California Stormwater BMP Handbook January 2003 <br /> Construction. <br /> www.cabmphandbooks.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.