Laserfiche WebLink
Stabilizes! Construction Roadway TC-2 <br /> Objectives <br /> EC Erosion Control � � <br /> SE Sediment Control ✓ <br /> TC Tracking Control ✓ <br /> WE Wind Erosion Control <br /> NS Non-Stormwater <br /> Management Control <br /> WM Waste Management and <br /> Materials Pollution Control <br /> Legend: <br /> ✓ Primary Objective <br /> ✓ Secondary Objective <br /> { <br /> Targeted Constituents <br /> Description and Purpose <br /> Sediment <br /> Access roads, subdivision roads ✓ <br /> parking areas, and other onsite Nutrients <br /> vehicle transportation routes should be stabilized immediately <br /> after grading, and frequently maintained to prevent erosion and Trash <br /> control dust. Metals <br /> Bacteria <br /> Suitable Applications Oil and Grease <br /> This BMP should be applied for the following conditions: Organics <br /> ■ Temporary Construction Traffic: <br /> Potential Alternatives <br /> - Phased construction projects and offsite road access None <br /> - Construction during wet weather <br /> ■ Construction roadways and detour roads: <br /> - Where mud tracking is a problem during wet weather <br /> - Where dust is a problem during dry weather <br /> - Adjacent to water bodies <br /> - Where poor soils are encountered <br /> Limitations <br /> ■ The roadway must be removed or paved when construction is <br /> complete. - C S 0 <br /> California <br /> Stormwater <br /> Quality <br /> Association <br /> January 2003 California Stormwater BMP Handbook 1 of 4 <br /> Construction <br /> www.cabmphandbooks.com <br />