My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102000 thru PS-1102500_ - PS-1102202
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2011
>
PS-1102000 thru PS-1102500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2011_PS-1102000 thru PS-1102500_ - PS-1102202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:57:27 PM
Creation date
12/30/2015 12:10:26 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1102202
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2011\PS-1102000 thru PS-1102500
Year2
2011
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - FRESNO
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
BOTH SIDES OF TURNER RD. 300' W/O & 4200' E/O DAVI
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -3- <br /> ENCROACHMENT PERMIT <br /> 21. Access to all properties shall be maintained at all times except when work is occurring at <br /> the access point. Minimal delays will be allowed to provide access within the work zone <br /> area. Driveway access shall be fully restored at the end of each workday. Driveways <br /> disturbed by the contractor shall be replaced with in-kind or better materials. <br /> 22. Residents and businesses shall be notified in writing, as approved by the County, <br /> 48-hours in advance of any impacts to their access. <br /> 23. A report describing a public information campaign to inform affected residents and <br /> businesses shall be submitted to the County for approval prior to beginning work. <br /> 24. Existing fences shall not be removed without written consent signed by the property <br /> owner and submitted to the County prior to the removal. Fences removed shall be <br /> restored with in-kind or better materials. <br /> 25. County roads shall be kept clean from mud and debris at all times along the access <br /> points and work zone areas during entire project. All standard roadway striping and <br /> signage shall be clearly visible, maintained and restored throughout the construction <br /> zone during and after the project. <br /> 26. In addition to standard dust control measures, streets shall be maintained in a clean <br /> condition, free of dirt, mud and debris during construction activities. The contractor shall <br /> provide daily, or as needed, street sweeping using a modern mechanical or vacuum- <br /> assisted street sweeper. <br /> 27. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> 28. Roadway areas subject to pavement cuts shall receive a 0.12-foot asphalt concrete <br /> overlay from the centerline to the edge of the traveled way. If the pavement is disturbed <br /> on both sides of the centerline (or adjacent lane), then the entire roadway (or affected <br /> lanes) shall be resurfaced. All pavement conforms shall be ground to provide a flush <br /> surface. Contractor shall grind and overlay within 10 working days of permanent trench <br /> paving. Shoulder areas shall be replaced with Class II Aggregate Base and brought up <br /> to the finish grade as directed by the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.