My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1201001 thru PS-1201500_ - PS-12-01123
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1201001 thru PS-1201500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1201001 thru PS-1201500_ - PS-12-01123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:04:41 PM
Creation date
12/30/2015 3:17:59 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-12-01123
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1201001 thru PS-1201500
Year2
2012
Supplemental fields
Applicant
SYBLON REID
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
W/S OF SANGUINETTI LN. ACROSS FROM MISTLETOE AVE.
Primary Parcel
Type (2)
PWP110005
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I/20 1 1(_TT I I [:I Rj f S rpr.E I- SII L, C",v 3 1 1 .5913 <br /> (40b) :;G/.8200 <br /> Apri 124, 2012 <br /> County of San Joaquin <br /> Public Works Department <br /> P.O. Box 1810 <br /> Stockton, Ca. 95205 <br /> Attention: Alex Chetley <br /> Subject: Storm Water Discharge—3121 Sanguinetti Way <br /> Dear Mi. Chetley; <br /> The site improvements we have planned for our well pumping station at this location will <br /> now include onsite storm water catch basins that connect to the street catch basin on South end <br /> of our street frontage. As shown in the latest version of our Site and Grading Plan STK-8665R3 <br /> attached, we have added an- on-site in-ground storm drainage collection system consisting of five <br /> (5) catch basins and piping necessary to collect the Storm runoff and direct it to the existing street <br /> drainage system. Please feel free to contact me if you have any questions regarding our planned <br /> permanent storm water collection system. <br /> Regards, <br /> Theodore.D. Coughlin, P.E. <br /> Senior Civil Engine-01 r <br /> (408) 367-8391 <br /> Mj� CA,'I 1(.i -T:G CJT1 <br /> It'L I •%If I:U <br />
The URL can be used to link to this page
Your browser does not support the video tag.