My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1201501 thru PS-1202000_ - PS-12-01950
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2012
>
PS-1201501 thru PS-1202000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2012_PS-1201501 thru PS-1202000_ - PS-12-01950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:08:07 PM
Creation date
12/30/2015 4:08:45 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-12-01950
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2012\PS-1201501 thru PS-1202000
Year2
2012
Supplemental fields
Applicant
AT & T- STOCKTON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FRENCH CAMP RD. @ PRESCOTT RD. INTERSECTION
Primary Parcel
Type (2)
PS-12-01950
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 1 <br /> 191111Utility Crossing Installation Application <br /> http://www.uprr.com/reus/pipeline/app/acknowI edge ment.cfm <br /> Page Received From Server On: June 21, 2012 02:04 PM CT <br /> SVILDIHO AMERICA <br /> Utility Grossing Installation - New Application (Step 7 of 7) <br /> ..t „ 3 a 6 7 <br /> User'rype Licensee - Contact Loc,Jtion Lutall+ tion - Submit Application Acknowledgement <br /> Utility Crossing Application <br /> Thank you for submitting your application. Your information has been accepted for review. <br /> Your Project Reference Number is: 0274377 <br /> If you would like to print your application (PDF), please click hgrcOur normal processing time is 30 <br /> to 45 days. No fees are required to be submitted at this time unless your crossing is in Wisconsin, in <br /> which case you must immediately submit the statutory fees via US mail to M�qagfr. To ensure <br /> proper application of the fees, be sure to write this Project Reference Number on your check. <br /> If you require Rush handling, overnight your check in the amount of$3055.00, with your Project <br /> Reference Numbe written on your check, together with the .BushImo.Iirati Forin to Mwar�ac�r. <br /> Before construction begins, agreements must be executed by the Licensee and Contractor, if <br /> applicable, and returned to this office. Verbal authorizations will not be permitted or granted. <br /> Generally, a minimum of 48 hours advance notice after execution of an agreement will be required <br /> prior to entry. <br /> If you have engineering plans you would like to submit, forward them via US mail to the Mgnpg r <br /> with reference to this PIN. <br /> If you would like to send a drawing or print with your on-line application click here and attach your <br /> drawing to the email. <br /> Finished <br /> Top of Page <br /> Home I What's New I Search I Copyright I Privacy I Site Info I Feedback <br /> tD://wwvv.uprr.com/reus/pipeline/app/acILnowledvement.cfm?CFID=65735&CFTOKEN=3 8594014ea5 7a... 6/2 1/20 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.