Laserfiche WebLink
Our previous agreements for addressing the conflict between levee work and county roads <br /> involved the District providing the sub base and a dustcoat and the County resurfacing with <br /> a triple chip seal, striping etc. In the case of the Jones Tract levee work the District made <br /> a financial contribution to the cost of the chip seal in lieu of installing the dustcoat. In this <br /> case it could be a contribution to the cost of paving. <br /> We would like to reach accord with the County as soon as possible as we must give <br /> direction to the contractor the first part of next week. The ability of the District to address <br /> the problems in this area of the levee will be lost if this change cannot be made at this <br /> time. <br /> If you have any questions please contact me via email at <br /> greenmountaindom@hotmail.com of phone 209 649 4555. <br /> Thank you. <br /> s , <br /> Dominick Gulli PE, PLS <br /> Rd 684 District Engineer. <br /> Attach: Design Drawings GIME Dated 3/15/13 P1,X1-5,V1 <br /> Draft Pavement Design KSN Dated 3/26/13 1-5 <br /> CC: Jim Stone SJC Public works jstone@sjgov.org <br /> Dante Nomellini RD684 Secretary <br /> Chris Neudeck KSN Engineers cne_udeck a�ksninc.com <br /> Steve Sinnock RD 2030 Engineer ssinnock(c),ksninc.com <br /> George Hartman RD 2030 Secretary gvlaw@gmail.com <br />