My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1301001 thru PS-1301500_ - PS-1301077
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2013
>
PS-1301001 thru PS-1301500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2013_PS-1301001 thru PS-1301500_ - PS-1301077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:16:05 PM
Creation date
12/30/2015 5:37:50 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1301077
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2013\PS-1301001 thru PS-1301500
Year2
2013
Supplemental fields
Applicant
WESTERN GEO-ENGINEERS
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
TO REMOVE MONITORING WELLS
Owners
Parcel Address
W/S OF MISSION RD. 25' S/O COUNRTY CLUB BLVD.
Primary Parcel
Type (2)
PS-1301077
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3) All destroyed boring that are not resurfaced prior to end of work day will be temporary <br /> backfilled with cold patch asphalt to surface to avoid slip trip hazards. <br /> SURFACE RESTORATION(Paving Contractor) <br /> The surface of the wells destroyed in the San Joaquin County right of way(Country Club Blvd <br /> (MW9A and MW9B) and Mission Street(Soil Gas Wells SG-3, SG-4, SG-5 and monitor wells <br /> MW6A, MW6B, MW7A and MW7B)will be resurface with hot patch asphalt as per San Joaquin <br /> County guidelines, see attached "Typical Trench Backfill". Backfill will be controlled density <br /> backfilled placed to the base of the existing asphalt. <br /> ENCROACHMENT AND PERMITS (Western Geo-Engineers) <br /> Well destruction permits will be obtained from SJCPHS, EHD, has approved the work plan for <br /> destroying the wells. Also encroachment agreements and/or permits will be obtained from the <br /> property owners that the wells are situated on. <br /> NOTIFICATIONS <br /> Western Geo-Engineers will notify the local properties and Underground Service Alert, along with <br /> marking of the wells to be destroyed. <br /> TRAFFIC SAFETY(Drilling and/or Paving Contractor) <br /> Traffic cones/delineators, signage and barricades with flashing lights will be provided by the <br /> contractor. Set-up by the contractor and removed by the contractor, see Figure 2. Barricades with <br /> flashing lights will be necessary for surface seal that need overnight conditions to completely cure. <br /> EXCAVATED WELL MATERIALS AND FLUIDS <br /> All materials excavated during well destruction will be placed on plastic liner and covered for later <br /> disposal inside the fenced back lot of the property. A four point composite sample analyzed for <br /> TPHg, and BTEX will be obtained to document the soil condition prior to removal for disposal at a <br /> Class II landfill. <br /> All fluids generated by the well destruction procedures will be placed into 55-gallon drums. The <br /> drums will be place in the fenced back lot of the property for temporary storage to allow the solids <br /> to settle to the bottom of the drums. In two to three days the drums will be inspected and all clear <br /> fluids will be transferred to InStrat for disposal. All solids will be placed with the excavated <br /> materials generated during well destruction. <br /> SancM�z Well Destruction Public Works Encroachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.