Laserfiche WebLink
California MUT CD 2014 Edition Page 1137 <br />(FHWA's MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) <br />Table TaperLeroMOreiaforTemporaryTr*cCardrdZones <br />(fa^12fed Offset WkJ1h) <br />Sp N <br />SmugiV <br />( ) <br />Its *MM Taper Length" <br />fixINIA of Offset 12 fest (M <br />L <br />ONO <br />Sh—Wder <br />L13 <br />zi(two <br />. Down <br />Stream <br />(fes <br />20 <br />80 <br />40 27 <br />50 <br />25 <br />125 <br />63 42 <br />50 <br />30 <br />180 <br />90 60 <br />50 <br />35 <br />243 <br />123 82 <br />50 <br />40 <br />320 <br />160 107 <br />50 <br />45 <br />540 <br />270 180 <br />50 <br />50 <br />600 <br />300 200 <br />50 <br />55 <br />660 <br />330 220 <br />50 <br />60 <br />720 <br />360 240 <br />50 <br />65 <br />780 <br />390 260 <br />50 <br />70 <br />840 - <br />420 28F_ <br />50 <br />75 <br />960 <br />450 300 <br />50 <br />-Posted speed link o" 851 -percentile speed prior to work starling, or the anticipated operating <br />speed in mph. <br />" - For other offsets use the fol owing merging taper length formula for L: <br />For speeds of 40 mph or less, L=WS2/60 <br />For speeds of 45 mph or more, L=WS r' <br />Where: L = taper length In feet <br />W = width of offset In feet <br />S = posh speed limit, off-peak 851" -percentile speed prior to work <br />starting, or the anticipated operating speed in mph <br />*" - Maximum downstream taper length is 100 feet. See Section 6C.08. <br />Chapter 61I -Typical Applications <br />Part 6-Temporary7Yaffic Control <br />O <br />November 7, 2014 <br />