Laserfiche WebLink
BUILD <br />·Overpull Footage 640 ft <br />·Riser Footage (4) 100 ft <br />·Overlash Footage 2,431 ft <br />·Bore Footage 120 ft <br />·Disturbed Soil Footage 16 sqft <br />VICINITY MAP <br />LEGEND <br />·Cover Sheet <br />·Legends & General Notes Pg 2 <br />·Site Plan Pg 3-6 <br />·Traffic Control Plan Pg 7-33 <br />·Typical Detail Page Pg 34 <br />COMCASTScope Of Work , <br />·Tie in at existing vault and overpull 348' <br />·Riser up 25' and overlash 390' along/across <br />Farmington Rd. <br />·Riser down 25' and overpull 292' across Golden <br />Gate Ave. <br />·Riser up 25' and overlash 1,172' along S Olive Ave <br />and E 6th St. <br />·Tie on at existing pole and overlash 869' along <br />Adelbert Ave and S Golden Gate Ave. <br />·Riser down 25' and bore 120' across Golden Gate <br />Ave onto property. <br />2115 S Sinclair Ave <br />Stockton, CA 95215 <br />CONTACTS <br />SEFNCO: <br />David Nicolas 925-315-1419