FIBER PLACEMENT NOTES:GENERAL NOTES: <br /> DISCLAIMER: <br />1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO <br />BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT <br />OF WAY. <br />2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE <br />BEEN FIELD LOCATED. <br />3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION <br />AND IS COLLECTED IN THE AS-BUILT PHASE. <br />1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY <br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY. <br />2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP <br />AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT <br />COMPLETION. <br />3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, <br />REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS <br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED. <br />4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE <br />CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND. <br />5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM <br />PRODUCTS. <br />6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED. <br />7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE <br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. <br />8.ALL RISERS WILL BE CAPPED AT ALL TIMES. <br />9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND <br />BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER. <br />1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS. <br />2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION. <br />3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS <br />SPECIFIED OTHERWISE. <br />4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS, <br />AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET. <br />5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY <br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION. <br />6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE <br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD <br />SPECIFICATIONS. <br />7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON <br />BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES <br />WITH BUILDING MANAGEMENT. <br />8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO <br />CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s). <br />9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING <br />PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT <br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE <br />REWORK AT HIS OWN COST. <br />10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT <br />PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER. <br />11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN <br />ALLOWED (9AM-3PM) BUSINESS HOURS. <br />12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE <br />CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED. <br />13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE <br />SHOULD BE ANTICIPATED. ADJUST AS NEEDED. <br />14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR <br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE <br />MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE <br />OR APPROVED EQUIVALENT. <br />15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, <br />NOT FIELD VERIFIED. <br />16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS. <br />17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED. <br />18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION. <br />19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE <br />CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE <br />COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING. <br />20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE <br />SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE <br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE <br />CLOSURES. <br />ROADWAY CENTER LINE <br />EXISTING COMCAST ROUTE <br />EXISTING FENCELINE <br />PROPOSED TRENCH/BORE ROUTE <br />EXISTING WATER LINE <br />EXISTING STORM DRAIN <br />EXISTING SANITARY SEWER <br />EXISTING JOINT TRENCH <br />EXISTING IRRIGATION SYSTEM <br />EXISTING TV SYSTEM <br />EXISTING GAS SYSTEM <br />EXISTING ELECTRICAL SYSTEM <br />EXISTING TELEPHONE SYSTEM <br />PROPERTY LINE <br />LINETYPES <br />BORE PIT <br />WATER MANHOLE <br />UNIDENTIFIED MANHOLE <br />GAS METER <br />WATER METER <br />ELECTRIC MANHOLE <br />SEWER CLEAN OUT <br />SANITARY SEWER MANHOLE <br />STORM DRAIN MANHOLE <br />CATCH BASIN <br />GAS/WATER VALVE <br />TREE/BUSHES <br />EXISTING POLE <br />EXISTING COMCAST PEDESTAL <br />NEW RISER ATTACHED TO POLE <br />EXISTING IRRIGATION VAULT <br />EXISTING COMCAST VAULT <br />EXISTING UTILITY VAULT/PEDESTAL <br />MONUMENT <br />FIRE HYDRANT <br />TRAFFIC SIGNAL COMBINATION <br />STREET LIGHT <br />TRANSFORMER <br />NEW COMCAST LOW PROFILE <br />NEW COMCAST PEDESTAL <br />NEW COMCAST VAULT <br />POWER SUPPLY W/ METER <br />NEW COMCAST POWER SUPPLY <br />SYMBOLS <br />EXISTING WATER <br />EXISTING TELEPHONE <br />CONDUIT <br />MAXIMUM <br />CDT <br />MAX <br />W <br />T <br />RIGHT OF WAY <br />EXISTING SANITARY SEWER <br />EXISTING STORM DRAIN <br />PUBLIC UTILITY EASEMENT <br />PROPERTY LINE <br />MINIMUM <br />FACE OF CURB <br />EXISTING <br />CENTER LINE <br />COMCAST <br />L <br />MIN <br />FOC <br />(E) <br />COMCAST <br />C <br />ABBREVIATIONS <br />PUE <br />R/W <br />SS <br />SD <br />PL <br />MONUMENT PRESERVATION NOTES: <br />1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF ALL SURVEY MONUMENTATION AND REFERENCE POINTS WHICH MAY BE LOST OR DISTURBED AS RESULT OF THE WORK. <br />2.PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL VERIFY THE LOCATION OF MONUMENTATION WHICH MAY BE DISTURBED. HE SHALL BE RESPONSIBLE FOR THE PRESERVATION OR REPLACEMENT OF ALL SUCH MONUMENTATION IN <br />COMPLIANCE WITH 8771 OF THE BUSINESS AND PROFESSIONS CODE AND SECTIONS 732.5, 1492.5 AND 1810.5 OF THE CALIFORNIA STREETS AND HIGHWAY CODE. <br />3.THE CONTRACTOR SHALL EMPLOY A LICENSED SURVEYOR TO SET TIES TO ANY MONUMENT THAT MAY BE DISTURBED OR LOST DURING THE COURSE OF THE WORK. SUCH TIES SHALL BE SET IN LOCATIONS THAT WILL NOT OTHERWISE BE DISTURBED. <br />4.THE CONTRACTOR SHALL BEAR ALL COST OF SURVEY, RE-SURVEY, REFERENCE TIES, REPLACEMENT CORNERS, CORNER RECORDS, MAPPING, CHECKING AND RECORDING FEES WHICH MAY BE REQUIRED AS RESULT OF LOSS OR DISTURBANCE OF <br />MONUMENTATION WHICH MAY OCCUR DURING THE COURSE OF THE WORK. <br />1.CONTRACTOR SHALL PROVIDE STORM DRAIN INLET PROTECTION (GRAVEL BAGS AND FILTER FABRIC, OR PROPRIETARY TEMPORARY <br />GEOTEXTILE INSERTS) FOR ALL CATCH BASINS IN THE PUBLIC RIGHT-OF-WAY, AS WELL AS ANY ON-SITE CATCH BASINS ON PRIVATE PROPERTY. <br />2.CONTRACTOR SHALL INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT FROM PROJECT SITE TO PREVENT TRACK-OUT OF <br />SEDIMENT ONTO THE PUBLIC RIGHT-OF-WAY FROM CONSTRUCTION VEHICLES. A STABILIZED CONSTRUCTION ENTRANCE/EXIT IS NOT <br />APPLICABLE TO THIS PROJECT. <br />3.CONTRACTOR SHALL ENSURE THAT CONSTRUCTION ACTIVITIES DO NOT DEPOSIT SEDIMENT ONTO THE PUBLIC ROADWAY, SIDEWALKS <br />AND GUTTERS. ALL SEDIMENT AND CONSTRUCTION DEBRIS MUST BE REMOVED BY THE END OF EACH WORKING DAY. <br />4.CONTRACTOR SHALL USE STREET SWEEPING OR OTHER DRY SWEEPING METHOD, AS NECESSARY, TO REMOVE CONSTRUCTION OR <br />DEMOLITION-RELATED SEDIMENT FROM PUBLIC SIDEWALKS, GUTTERS AND ROADWAY. <br />5.CONTRACTOR SHALL SCHEDULE WORK FOR DRY-WEATHER DAYS WHEN NO RAIN IS IN THE IMMEDIATE FORECAST <br />6.CONTRACTOR SHALL INSTALL A CITY-APPROVED WASTE MANAGEMENT WASH-OUT STRUCTURE AT THE PROJECT SITE. ALL CONCRETE, <br />PAINT, STUCCO AND OTHER LIQUIDS WILL BE WASHED OUT IN THIS STRUCTURE. <br />7.CONTRACTOR SHALL PROVIDE DUST CONTROL TO PREVENT THE NUISANCE OF BLOWING DUST WITHOUT CAUSING SEDIMENT, DEBRIS, <br />OR LITTER TO ENTER THE CITY STORM DRAIN SYSTEM. <br />8.CONTRACTOR SHALL INSTALL ANY OTHER BMPS AS NECESSARY TO CONTROL THE DISCHARGE OF POLLUTANTS FROM THE PROJECT <br />SITE. <br /> STORMWATER QUALITY NOTES: