Laserfiche WebLink
BERKELEY RD <br />25 MPH <br />boo <br />THIS IS A COMCAST DOCUMENT, PROPRIETARY do CONFIDENTIAL <br />DESIGN: REV DESCRIPTION DATE <br />DRAWN BY: SEFNCO 5/28/2019 <br />APPROVED: <br />APPROVED: <br />APPROVED: <br />Cr,4 1--ALt VI�� <br />51 <br />s <br />I I I W11 1011 r <br />.IMPORTANT- NOTICE <br />Section # 4216/4217 of the Government Cade requires a <br />Dig Alert Identification Number to be issued beiare a <br />"Permit to Excavate" will be valid For your Dig Alert 1,0. <br />CALL. TOLL FREE <br />48 HOURS 8CFORE YOU DIG <br />UNDERGROUND SERVICE ALERT <br />1-800-227-2600 <br />4'X4' <br />BORE PIT <br />CTYP.7 <br />1 <br />2 <br />SCOPL. Of WORK <br />+ 1 }• Tic in at existing vault and overpull 275' <br />along Mountain House Pkwy. <br />(1 )• Dig up existing conduit and place new <br />vault. <br />( 3 7• Bare 135' across Mountain House Pkwy and <br />riser up pole 25'. <br />O• Place new strand 1,225' along Mountain <br />house Pkwy and riser down 25'. <br />(5 }• Overpull 520' along and across Mountain <br />�--✓ House Pkwy. <br />SITT. PLAN 1-1 <br />is <br />PROJff: 261378 <br />CONSTRUCTION TYPE: BORE <br />INODE� <br />SYSTEM: <br />RM <br />SHEET: 3 OF <br />