Laserfiche WebLink
LINETYPES <br />ABBREVIATIONS <br />PROPOSEDTRENCH;'BORE ROUTE <br />EXISTING COMCAST ROUTE <br />EXISTING TELEPHONE `SYSTEM <br />EXISTING ELECTRICAL SYSTEM <br />EXISTING GAS SYSTEM <br />EXISTING TV SYSTEM <br />EXISTING IRRIGATION SYSTEM <br />EXISTING IOINTTRENCH <br />EXISTING SANITARY SEWER <br />EXISTING STORM DRAIN <br />EXISTING WATER LINE <br />EXISTING FENCELtNE <br />ROADWAY CENTER LINE <br />PROPERTY LINE <br />THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL <br />DESIGN: REV DESCRIPTION DATE <br />DRAWN BY: 5EFNCQ 5/28/2019 <br />APPROVED: <br />APPROVED: <br />APPROVED: <br />GENERAL NOTES: <br />1 ALL VAULTS 1 HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS <br />2 GROUND RESTORATION -RIGHT-OF-WAY SHALL BE RESTORED TO ORIG'NAL OR BETTER CONDITION <br />3 ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BEAM NIMUM OF "M RADIUS UNLESS <br />SPECIFIED OTHERWISE <br />4 BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS <br />AT CULVERTS DITCHES AND INA STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET <br />5 DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY <br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION <br />B WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE <br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD <br />SPECIFICATIONS. <br />7 THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON <br />BUILDING CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES <br />WITH BUILDING MANAGEMENT <br />8 THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO <br />CONSTRUCTION SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE <br />NUMBER(S) <br />9 THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANYTIME THE WORK BEING <br />PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT <br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE <br />REWORK AT HIS OWN COST. <br />10 ANY CHANGE IN PROJECT SCOPE INCLUDING BUT NOT LIMITED TO. CONDUIT LENGTH CONDUIT <br />PATH, AERIAL PATH ETC MUST BE APPROVED BY THE PROJECT MANAGER <br />11 ALL CORINGICONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN <br />ALLOWED (RAM-3PM) BUSINESS HOURS. <br />12 ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE <br />CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED <br />13 ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS AS SUCH SOME VARIANCE <br />SHOULD BE ANTICIPATED ADJUSTAS NEEDED. <br />14 ALL BURIED CONDUITICABLE WILL BE PLACED AT 35" MINIMUM COVER. SETE HAS POTENTIAL FOR <br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER IN CASES WHERE <br />THE <br />MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE <br />OR APPROVED EQUIVALENT <br />15 WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, <br />NOT FIELD VERIFII=D <br />16 BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS <br />17 AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED <br />18 DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION. <br />t9 PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING <br />LANE <br />CLOSURES AND DELAYS A WEEK IN ADVANCE LOCATION OF THE MASSAGE BOARD SHALL BE <br />COORDINATED WITH THE CITY INSPECTOR ATTHE PRE -CONSTRUCTION MEETING <br />20 LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT ATA TIME FOR SAFETY PURPOSES THERE <br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG INTERNATIONAL BLVD MORE FLAGGERS WILL BE <br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE <br />CLOSURES <br />IMPORTANT _. NOTICE <br />Section # 42t6/4217 of the Government Code requires o <br />Dig Alert Identificution Number to be issued before a <br />"Permit to Excavate" will be volid For your Dig Alert I.D. <br />CALL TOLL FREE <br />48 HOURS BEFORE YOU DIG <br />UNDERGROUND SERVICE ALERT <br />1-800-227-2500 <br />FIBER PLACEMENT NOTES: <br />1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 <br />HOURS PRIOR TO CONSTRUCTION ACTIVITY <br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF <br />LOCAL CALL BEFORE YOU DIG AGENCY <br />2, CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT <br />EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP <br />AND TAIL LOCATION CONTRACTOR TO PROVIDE PROJECT <br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT <br />COMPLETION. <br />3 SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE <br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, <br />REEL LENGTHS OF FIVE HUNDRED FEET {500) OR LESS ON LARGE <br />COUNT FIBER OR THREE HUNDRED FEET (3DD) OR LESS <br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD 81= <br />PLACED AS FEL'S, NOT CUT AND RETURNED <br />4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY <br />WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE <br />CASES AND WHERE INDICATED BY PROJECT MANAGER TAGS <br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND <br />5, CA13LE LUBRICATION SHALL BE USED TO REDUCE PULLING <br />TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM <br />PRODUCTS <br />6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS <br />OTHERWISE NOTED <br />7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH <br />WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE <br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. <br />B, ALL RISERS WILL BE CAPPED AT ALL TIMES <br />9. ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT <br />RED -NORTH, GREE N-SOUTH,YELLOW-EAST, AND <br />BLUE -"EST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER <br />DISCLAIMER: <br />I IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR <br />TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO <br />BEGIN NO UNDERGROUND INSTALLATION REPRESENTED WITHIN <br />THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF <br />WAY <br />2. THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND <br />V+ALLIMAY VARY ONCE UTILITIES HAVE <br />BEEN FIELD LOCATED <br />A. ANCHORING FOR THE AERIAL CONSTRUCTION IS TYP,CALLY <br />DETERMINED DURING CONSTRUCTION <br />AND IS COLLECTED IN THE AS -BUILT PHASE <br />LEGEND & GENERAL NOTES <br />19 <br />COMCAST COMCAST <br />PL <br />PROPERTY LINE <br />SYSTEM: <br />CL CENTER LINE <br />PUE <br />PU91UC UTILITY EASEMENT <br />(E) EXISTING <br />R/W <br />RIGHT OF WAY <br />FOC FACE OF CURB <br />SD <br />EXISTING STORM DRAIN <br />MIN MINIMUM <br />S5 <br />EXISTING SANITARY SEWER <br />MAX MAXIMUM <br />T <br />EXISTING TELEPHONE <br />CDT CONDUIT <br />W <br />EXISTING WATER <br />SYMBOLS <br />NEW COMCAST POWER SUPPLY <br />® <br />NEW COMCAST LOW PROFILE <br />TRANSFORMER <br />IR <br />POWER SUPPLY W/ METER <br />STREET LIGHT <br />NEW COMCAST VAULT <br />TRAFFIC SIGNAL COMBINATION <br />�D <br />1.�.] <br />NEW COMCAST PEDESTAL <br />FIRE HYDRANT <br />® <br />BORE PIT <br />MONUMENT <br />®' <br />NEW RISER ATTACHED TO POLE <br />® <br />CATCH BASIN <br />® <br />EXISTING POLE <br />STORM DRAIN MANHOLE <br />EXISTING COMCAST VAULT <br />O <br />WATER MANHOLE <br />® <br />EXISTING COMCAST PEDESTAL <br />SANITARY SEWER MANHOLE <br />D <br />EXISTING IRRIGATION VAULT <br />® <br />SEWER CLEAN OUT <br />CO <br />EX15TING UTfLITY VAULT/PEDESTAL <br />O <br />ELECTRICMANHOLE <br />Dom— <br />GAS/WATERVALVE <br />® <br />UNIDENTIFIED MANHOLE <br />10 <br />TREE/BUSHES <br />® <br />WATER METER <br />© <br />GAS METER <br />THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL <br />DESIGN: REV DESCRIPTION DATE <br />DRAWN BY: 5EFNCQ 5/28/2019 <br />APPROVED: <br />APPROVED: <br />APPROVED: <br />GENERAL NOTES: <br />1 ALL VAULTS 1 HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS <br />2 GROUND RESTORATION -RIGHT-OF-WAY SHALL BE RESTORED TO ORIG'NAL OR BETTER CONDITION <br />3 ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BEAM NIMUM OF "M RADIUS UNLESS <br />SPECIFIED OTHERWISE <br />4 BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS <br />AT CULVERTS DITCHES AND INA STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET <br />5 DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY <br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION <br />B WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE <br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD <br />SPECIFICATIONS. <br />7 THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON <br />BUILDING CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES <br />WITH BUILDING MANAGEMENT <br />8 THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO <br />CONSTRUCTION SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE <br />NUMBER(S) <br />9 THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANYTIME THE WORK BEING <br />PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT <br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE <br />REWORK AT HIS OWN COST. <br />10 ANY CHANGE IN PROJECT SCOPE INCLUDING BUT NOT LIMITED TO. CONDUIT LENGTH CONDUIT <br />PATH, AERIAL PATH ETC MUST BE APPROVED BY THE PROJECT MANAGER <br />11 ALL CORINGICONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN <br />ALLOWED (RAM-3PM) BUSINESS HOURS. <br />12 ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE <br />CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED <br />13 ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS AS SUCH SOME VARIANCE <br />SHOULD BE ANTICIPATED ADJUSTAS NEEDED. <br />14 ALL BURIED CONDUITICABLE WILL BE PLACED AT 35" MINIMUM COVER. SETE HAS POTENTIAL FOR <br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER IN CASES WHERE <br />THE <br />MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE <br />OR APPROVED EQUIVALENT <br />15 WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, <br />NOT FIELD VERIFII=D <br />16 BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS <br />17 AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED <br />18 DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION. <br />t9 PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING <br />LANE <br />CLOSURES AND DELAYS A WEEK IN ADVANCE LOCATION OF THE MASSAGE BOARD SHALL BE <br />COORDINATED WITH THE CITY INSPECTOR ATTHE PRE -CONSTRUCTION MEETING <br />20 LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT ATA TIME FOR SAFETY PURPOSES THERE <br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG INTERNATIONAL BLVD MORE FLAGGERS WILL BE <br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE <br />CLOSURES <br />IMPORTANT _. NOTICE <br />Section # 42t6/4217 of the Government Code requires o <br />Dig Alert Identificution Number to be issued before a <br />"Permit to Excavate" will be volid For your Dig Alert I.D. <br />CALL TOLL FREE <br />48 HOURS BEFORE YOU DIG <br />UNDERGROUND SERVICE ALERT <br />1-800-227-2500 <br />FIBER PLACEMENT NOTES: <br />1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 <br />HOURS PRIOR TO CONSTRUCTION ACTIVITY <br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF <br />LOCAL CALL BEFORE YOU DIG AGENCY <br />2, CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT <br />EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP <br />AND TAIL LOCATION CONTRACTOR TO PROVIDE PROJECT <br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT <br />COMPLETION. <br />3 SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE <br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, <br />REEL LENGTHS OF FIVE HUNDRED FEET {500) OR LESS ON LARGE <br />COUNT FIBER OR THREE HUNDRED FEET (3DD) OR LESS <br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD 81= <br />PLACED AS FEL'S, NOT CUT AND RETURNED <br />4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY <br />WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE <br />CASES AND WHERE INDICATED BY PROJECT MANAGER TAGS <br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND <br />5, CA13LE LUBRICATION SHALL BE USED TO REDUCE PULLING <br />TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM <br />PRODUCTS <br />6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS <br />OTHERWISE NOTED <br />7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH <br />WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE <br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. <br />B, ALL RISERS WILL BE CAPPED AT ALL TIMES <br />9. ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT <br />RED -NORTH, GREE N-SOUTH,YELLOW-EAST, AND <br />BLUE -"EST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER <br />DISCLAIMER: <br />I IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR <br />TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO <br />BEGIN NO UNDERGROUND INSTALLATION REPRESENTED WITHIN <br />THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF <br />WAY <br />2. THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND <br />V+ALLIMAY VARY ONCE UTILITIES HAVE <br />BEEN FIELD LOCATED <br />A. ANCHORING FOR THE AERIAL CONSTRUCTION IS TYP,CALLY <br />DETERMINED DURING CONSTRUCTION <br />AND IS COLLECTED IN THE AS -BUILT PHASE <br />LEGEND & GENERAL NOTES <br />19 <br />PROJ#: 261376 <br />CONSTRUCTION TYPE: BORE <br />Cdb" <br />SYSTEM: <br />NODE: <br />SHEET: 2 OF <br />