| LINETYPES 
<br />ABBREVIATIONS 
<br />PROPOSEDTRENCH;'BORE ROUTE 
<br />EXISTING COMCAST ROUTE 
<br />EXISTING TELEPHONE `SYSTEM 
<br />EXISTING ELECTRICAL SYSTEM 
<br />EXISTING GAS SYSTEM 
<br />EXISTING TV SYSTEM 
<br />EXISTING IRRIGATION SYSTEM 
<br />EXISTING IOINTTRENCH 
<br />EXISTING SANITARY SEWER 
<br />EXISTING STORM DRAIN 
<br />EXISTING WATER LINE 
<br />EXISTING FENCELtNE 
<br />ROADWAY CENTER LINE 
<br />PROPERTY LINE 
<br />THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL 
<br />DESIGN: REV DESCRIPTION DATE 
<br />DRAWN BY: 5EFNCQ 5/28/2019 
<br />APPROVED: 
<br />APPROVED: 
<br />APPROVED: 
<br />GENERAL NOTES: 
<br />1 ALL VAULTS 1 HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS 
<br />2 GROUND RESTORATION -RIGHT-OF-WAY SHALL BE RESTORED TO ORIG'NAL OR BETTER CONDITION 
<br />3 ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BEAM NIMUM OF "M RADIUS UNLESS 
<br />SPECIFIED OTHERWISE 
<br />4 BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS 
<br />AT CULVERTS DITCHES AND INA STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET 
<br />5 DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY 
<br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION 
<br />B WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE 
<br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD 
<br />SPECIFICATIONS. 
<br />7 THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON 
<br />BUILDING CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES 
<br />WITH BUILDING MANAGEMENT 
<br />8 THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO 
<br />CONSTRUCTION SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE 
<br />NUMBER(S) 
<br />9 THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANYTIME THE WORK BEING 
<br />PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT 
<br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE 
<br />REWORK AT HIS OWN COST. 
<br />10 ANY CHANGE IN PROJECT SCOPE INCLUDING BUT NOT LIMITED TO. CONDUIT LENGTH CONDUIT 
<br />PATH, AERIAL PATH ETC MUST BE APPROVED BY THE PROJECT MANAGER 
<br />11 ALL CORINGICONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN 
<br />ALLOWED (RAM-3PM) BUSINESS HOURS. 
<br />12 ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE 
<br />CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED 
<br />13 ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS AS SUCH SOME VARIANCE 
<br />SHOULD BE ANTICIPATED ADJUSTAS NEEDED. 
<br />14 ALL BURIED CONDUITICABLE WILL BE PLACED AT 35" MINIMUM COVER. SETE HAS POTENTIAL FOR 
<br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER IN CASES WHERE 
<br />THE 
<br />MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE 
<br />OR APPROVED EQUIVALENT 
<br />15 WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, 
<br />NOT FIELD VERIFII=D 
<br />16 BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS 
<br />17 AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED 
<br />18 DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION. 
<br />t9 PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING 
<br />LANE 
<br />CLOSURES AND DELAYS A WEEK IN ADVANCE LOCATION OF THE MASSAGE BOARD SHALL BE 
<br />COORDINATED WITH THE CITY INSPECTOR ATTHE PRE -CONSTRUCTION MEETING 
<br />20 LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT ATA TIME FOR SAFETY PURPOSES THERE 
<br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG INTERNATIONAL BLVD MORE FLAGGERS WILL BE 
<br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE 
<br />CLOSURES 
<br />IMPORTANT _. NOTICE 
<br />Section # 42t6/4217 of the Government Code requires o 
<br />Dig Alert Identificution Number to be issued before a 
<br />"Permit to Excavate" will be volid For your Dig Alert I.D. 
<br />CALL TOLL FREE 
<br />48 HOURS BEFORE YOU DIG 
<br />UNDERGROUND SERVICE ALERT 
<br />1-800-227-2500 
<br />FIBER PLACEMENT NOTES: 
<br />1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 
<br />HOURS PRIOR TO CONSTRUCTION ACTIVITY 
<br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF 
<br />LOCAL CALL BEFORE YOU DIG AGENCY 
<br />2, CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT 
<br />EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP 
<br />AND TAIL LOCATION CONTRACTOR TO PROVIDE PROJECT 
<br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT 
<br />COMPLETION. 
<br />3 SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE 
<br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, 
<br />REEL LENGTHS OF FIVE HUNDRED FEET {500) OR LESS ON LARGE 
<br />COUNT FIBER OR THREE HUNDRED FEET (3DD) OR LESS 
<br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD 81= 
<br />PLACED AS FEL'S, NOT CUT AND RETURNED 
<br />4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY 
<br />WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE 
<br />CASES AND WHERE INDICATED BY PROJECT MANAGER TAGS 
<br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND 
<br />5, CA13LE LUBRICATION SHALL BE USED TO REDUCE PULLING 
<br />TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM 
<br />PRODUCTS 
<br />6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS 
<br />OTHERWISE NOTED 
<br />7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH 
<br />WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE 
<br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. 
<br />B, ALL RISERS WILL BE CAPPED AT ALL TIMES 
<br />9. ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT 
<br />RED -NORTH, GREE N-SOUTH,YELLOW-EAST, AND 
<br />BLUE -"EST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER 
<br />DISCLAIMER: 
<br />I IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR 
<br />TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO 
<br />BEGIN NO UNDERGROUND INSTALLATION REPRESENTED WITHIN 
<br />THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF 
<br />WAY 
<br />2. THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND 
<br />V+ALLIMAY VARY ONCE UTILITIES HAVE 
<br />BEEN FIELD LOCATED 
<br />A. ANCHORING FOR THE AERIAL CONSTRUCTION IS TYP,CALLY 
<br />DETERMINED DURING CONSTRUCTION 
<br />AND IS COLLECTED IN THE AS -BUILT PHASE 
<br />LEGEND & GENERAL NOTES 
<br />19 
<br />COMCAST COMCAST 
<br />PL 
<br />PROPERTY LINE 
<br />SYSTEM: 
<br />CL CENTER LINE 
<br />PUE 
<br />PU91UC UTILITY EASEMENT 
<br />(E) EXISTING 
<br />R/W 
<br />RIGHT OF WAY 
<br />FOC FACE OF CURB 
<br />SD 
<br />EXISTING STORM DRAIN 
<br />MIN MINIMUM 
<br />S5 
<br />EXISTING SANITARY SEWER 
<br />MAX MAXIMUM 
<br />T 
<br />EXISTING TELEPHONE 
<br />CDT CONDUIT 
<br />W 
<br />EXISTING WATER 
<br />SYMBOLS 
<br />NEW COMCAST POWER SUPPLY 
<br />® 
<br />NEW COMCAST LOW PROFILE 
<br />TRANSFORMER 
<br />IR 
<br />POWER SUPPLY W/ METER 
<br />STREET LIGHT 
<br />NEW COMCAST VAULT 
<br />TRAFFIC SIGNAL COMBINATION 
<br />�D 
<br />1.�.] 
<br />NEW COMCAST PEDESTAL 
<br />FIRE HYDRANT 
<br />® 
<br />BORE PIT 
<br />MONUMENT 
<br />®' 
<br />NEW RISER ATTACHED TO POLE 
<br />® 
<br />CATCH BASIN 
<br />® 
<br />EXISTING POLE 
<br />STORM DRAIN MANHOLE 
<br />EXISTING COMCAST VAULT 
<br />O 
<br />WATER MANHOLE 
<br />® 
<br />EXISTING COMCAST PEDESTAL 
<br />SANITARY SEWER MANHOLE 
<br />D 
<br />EXISTING IRRIGATION VAULT 
<br />® 
<br />SEWER CLEAN OUT 
<br />CO 
<br />EX15TING UTfLITY VAULT/PEDESTAL 
<br />O 
<br />ELECTRICMANHOLE 
<br />Dom— 
<br />GAS/WATERVALVE 
<br />® 
<br />UNIDENTIFIED MANHOLE 
<br />10 
<br />TREE/BUSHES 
<br />® 
<br />WATER METER 
<br />© 
<br />GAS METER 
<br />THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL 
<br />DESIGN: REV DESCRIPTION DATE 
<br />DRAWN BY: 5EFNCQ 5/28/2019 
<br />APPROVED: 
<br />APPROVED: 
<br />APPROVED: 
<br />GENERAL NOTES: 
<br />1 ALL VAULTS 1 HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS 
<br />2 GROUND RESTORATION -RIGHT-OF-WAY SHALL BE RESTORED TO ORIG'NAL OR BETTER CONDITION 
<br />3 ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BEAM NIMUM OF "M RADIUS UNLESS 
<br />SPECIFIED OTHERWISE 
<br />4 BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS 
<br />AT CULVERTS DITCHES AND INA STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET 
<br />5 DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY 
<br />OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION 
<br />B WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE 
<br />REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD 
<br />SPECIFICATIONS. 
<br />7 THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON 
<br />BUILDING CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES 
<br />WITH BUILDING MANAGEMENT 
<br />8 THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO 
<br />CONSTRUCTION SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE 
<br />NUMBER(S) 
<br />9 THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANYTIME THE WORK BEING 
<br />PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT 
<br />BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE 
<br />REWORK AT HIS OWN COST. 
<br />10 ANY CHANGE IN PROJECT SCOPE INCLUDING BUT NOT LIMITED TO. CONDUIT LENGTH CONDUIT 
<br />PATH, AERIAL PATH ETC MUST BE APPROVED BY THE PROJECT MANAGER 
<br />11 ALL CORINGICONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN 
<br />ALLOWED (RAM-3PM) BUSINESS HOURS. 
<br />12 ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE 
<br />CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED 
<br />13 ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS AS SUCH SOME VARIANCE 
<br />SHOULD BE ANTICIPATED ADJUSTAS NEEDED. 
<br />14 ALL BURIED CONDUITICABLE WILL BE PLACED AT 35" MINIMUM COVER. SETE HAS POTENTIAL FOR 
<br />ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER IN CASES WHERE 
<br />THE 
<br />MINIMUM COVER CANNOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED INA SCH 40 EMT SLEEVE 
<br />OR APPROVED EQUIVALENT 
<br />15 WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS, 
<br />NOT FIELD VERIFII=D 
<br />16 BORING OF AC PAVING IS REQUIRED ATALL LOCATIONS AS INDICATED ON PLANS 
<br />17 AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED 
<br />18 DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION. 
<br />t9 PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING 
<br />LANE 
<br />CLOSURES AND DELAYS A WEEK IN ADVANCE LOCATION OF THE MASSAGE BOARD SHALL BE 
<br />COORDINATED WITH THE CITY INSPECTOR ATTHE PRE -CONSTRUCTION MEETING 
<br />20 LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT ATA TIME FOR SAFETY PURPOSES THERE 
<br />SHALL BE ONLY ONE CLOSURE ATA TIME ALONG INTERNATIONAL BLVD MORE FLAGGERS WILL BE 
<br />NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE 
<br />CLOSURES 
<br />IMPORTANT _. NOTICE 
<br />Section # 42t6/4217 of the Government Code requires o 
<br />Dig Alert Identificution Number to be issued before a 
<br />"Permit to Excavate" will be volid For your Dig Alert I.D. 
<br />CALL TOLL FREE 
<br />48 HOURS BEFORE YOU DIG 
<br />UNDERGROUND SERVICE ALERT 
<br />1-800-227-2500 
<br />FIBER PLACEMENT NOTES: 
<br />1. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 
<br />HOURS PRIOR TO CONSTRUCTION ACTIVITY 
<br />SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF 
<br />LOCAL CALL BEFORE YOU DIG AGENCY 
<br />2, CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT 
<br />EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP 
<br />AND TAIL LOCATION CONTRACTOR TO PROVIDE PROJECT 
<br />MANAGER WITH SEQUENCE NUMBERS AT PROJECT 
<br />COMPLETION. 
<br />3 SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE 
<br />DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER, 
<br />REEL LENGTHS OF FIVE HUNDRED FEET {500) OR LESS ON LARGE 
<br />COUNT FIBER OR THREE HUNDRED FEET (3DD) OR LESS 
<br />ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD 81= 
<br />PLACED AS FEL'S, NOT CUT AND RETURNED 
<br />4. FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY 
<br />WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE 
<br />CASES AND WHERE INDICATED BY PROJECT MANAGER TAGS 
<br />NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND 
<br />5, CA13LE LUBRICATION SHALL BE USED TO REDUCE PULLING 
<br />TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM 
<br />PRODUCTS 
<br />6. A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS 
<br />OTHERWISE NOTED 
<br />7. ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH 
<br />WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE 
<br />LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER. 
<br />B, ALL RISERS WILL BE CAPPED AT ALL TIMES 
<br />9. ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT 
<br />RED -NORTH, GREE N-SOUTH,YELLOW-EAST, AND 
<br />BLUE -"EST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER 
<br />DISCLAIMER: 
<br />I IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR 
<br />TO VERIFY ALL RIGHT OF WAY BEFORE CONSTRUCTION IS TO 
<br />BEGIN NO UNDERGROUND INSTALLATION REPRESENTED WITHIN 
<br />THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF 
<br />WAY 
<br />2. THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND 
<br />V+ALLIMAY VARY ONCE UTILITIES HAVE 
<br />BEEN FIELD LOCATED 
<br />A. ANCHORING FOR THE AERIAL CONSTRUCTION IS TYP,CALLY 
<br />DETERMINED DURING CONSTRUCTION 
<br />AND IS COLLECTED IN THE AS -BUILT PHASE 
<br />LEGEND & GENERAL NOTES 
<br />19 
<br />PROJ#: 261376 
<br />CONSTRUCTION TYPE: BORE 
<br />Cdb" 
<br />SYSTEM: 
<br />NODE: 
<br />SHEET: 2 OF 
<br /> |