Laserfiche WebLink
JOB#: JB347734 <br />CONSTRUCTION TYPE: Aerial <br />VICINITY MAP <br />SYSTEM: County of San Joaquin <br />NODE: <br />LEGEND <br />•Legend, General Notes & Abbreviaons <br />•Typical Standards & Details <br />•Traffic Control Plan <br />•Construcon Plans <br /> TITLE PAGE <br />CD-1 to CD-5 <br />SD-1 <br />CD-0 <br />TC-1 to TC-5 <br />BUILD <br />•Aerial footage: <br />•New Vaults: <br />•New Pedestals: <br />•Overpull Exisng Conduit: <br />•Total Project Footage: <br />•Concrete R&R (sq. .): <br />•Bore Pits: <br />•Exisng Vaults: <br />•Traffic Control: <br />•Trench footage: <br />•Exisng Poles: <br />0’ <br />0’ <br />3 Days <br />18 <br />3,554’ <br />0 <br />0 <br />0 <br />3,554’ <br />0’ <br />0 <br />JOB# JB347734 <br />23265 CA-99, ACAMPO <br />SCOPE OF WORK <br />•Tie in at exisng pole at the c/o Peler Rd and N 99 Frontage Rd. Place 916 <br />of new cable to west on Peler Rd and across CA-99 between 5 poles. Place <br />2,638 of new cable to north on N 99 Frontage Rd between 13. Riser dwon <br />25’ at the pole. <br />JOB# JB347734 <br />23265 CA-99 <br />TITLE PAGETHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL <br />DESIGN: CITYRISE <br />DRAWN BY: <br />APPROVED: <br />APPROVED: <br />APPROVED: <br />REV DESCRIPTION DATE