My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2002001 thru PS-2002500_ - PS-2002480
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2002001 thru PS-2002500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2020_PS-2002001 thru PS-2002500_ - PS-2002480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 9:54:08 AM
Creation date
1/26/2023 9:50:18 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2002480
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
Lower Sacramento Rd. @ Bear Creek Slough and Ranier Ave@ Stockton City Limits
Address
10096 Ahart Rd., Oroville,CA 95966
Application
Frank Medina
Type
Guardrail Replacements
Supplemental fields
Cross Ref
PWP110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> <br /> Table of Contents <br /> <br /> Page <br /> <br />1. General Information ................................................................................. 2-3 <br /> <br /> <br />2. MSKT Design and Rail Options .............................................................. 4 <br /> <br /> <br />3. Begin Assembly – Drawing & Photo Details .................................... 5 <br />3.1 Bill of Materials for MSKT .......................................................................... 5 <br />3.2 Plan and Elevation View of MSKT System / Figure 1 ................................ 6 <br />3.3 Optional Flared Installation for MSKT / Figure 2 ....................................... 7 <br />3.4 View of MSKT End Post #1 / Figure 3 ....................................................... 8 <br />3.5 Post #1 Connection Detail for MSKT / Figure 4 .......................................... 9 <br />3.6 Post #2 Connection Detail for MSKT / Figure 5 ........................................ 10 <br />3.7 Ground Strut Detail for MSKT / Figure 6 .................................................. 11 <br />3.8 Installation of Cable Anchor (Box) Bracket & Shoulder Bolts / Figure 7 .. 12 <br />3.9 Impact Head Connection for MSKT / Figure 8 .......................................... 13 <br />3.10 Grading Recommendations for MSKT / Figure 9 .................................... 14 <br /> <br /> <br />4. Installing the MSKT .................................................................................... 15 <br />4.1 Materials ...................................................................................................... 15 <br />4.2 Site Preparation ........................................................................................... 15 <br />4.3 Tools Required ............................................................................................ 15 <br />4.4 Installation Procedures ................................................................................. 15 <br />4.4.1 Installing Standard Steel Guardrail Posts #3 and Beyond ................. 16 <br />4.4.2 Installing Breakaway Steel End Posts #1 and #2 ............................... 16 <br />4.4.3 Installing Ground Strut ...................................................................... 17 <br />4.4.4 Installing Guardrail ............................................................................ 17 <br />4.4.5 Installing Cable Anchor Bracket ........................................................ 18 <br />4.4.6 Installing MSKT Impact Head ........................................................... 18 <br />4.4.7 Installing Cable Assembly ................................................................. 19 <br /> <br /> <br />5. Inspection Checklist for MSKT ....................................................... 20-21 <br /> <br /> <br />6. Repairing the MSKT ................................................................................... 22 <br /> <br /> <br />7. Allowable Options for the MSKT ......................................................... 23 <br /> <br /> <br />PUBLICATION ~ 062717
The URL can be used to link to this page
Your browser does not support the video tag.