Laserfiche WebLink
1 <br /> <br /> Table of Contents <br /> <br /> Page <br /> <br />1. General Information ................................................................................. 2-3 <br /> <br /> <br />2. MSKT Design and Rail Options .............................................................. 4 <br /> <br /> <br />3. Begin Assembly – Drawing & Photo Details .................................... 5 <br />3.1 Bill of Materials for MSKT .......................................................................... 5 <br />3.2 Plan and Elevation View of MSKT System / Figure 1 ................................ 6 <br />3.3 Optional Flared Installation for MSKT / Figure 2 ....................................... 7 <br />3.4 View of MSKT End Post #1 / Figure 3 ....................................................... 8 <br />3.5 Post #1 Connection Detail for MSKT / Figure 4 .......................................... 9 <br />3.6 Post #2 Connection Detail for MSKT / Figure 5 ........................................ 10 <br />3.7 Ground Strut Detail for MSKT / Figure 6 .................................................. 11 <br />3.8 Installation of Cable Anchor (Box) Bracket & Shoulder Bolts / Figure 7 .. 12 <br />3.9 Impact Head Connection for MSKT / Figure 8 .......................................... 13 <br />3.10 Grading Recommendations for MSKT / Figure 9 .................................... 14 <br /> <br /> <br />4. Installing the MSKT .................................................................................... 15 <br />4.1 Materials ...................................................................................................... 15 <br />4.2 Site Preparation ........................................................................................... 15 <br />4.3 Tools Required ............................................................................................ 15 <br />4.4 Installation Procedures ................................................................................. 15 <br />4.4.1 Installing Standard Steel Guardrail Posts #3 and Beyond ................. 16 <br />4.4.2 Installing Breakaway Steel End Posts #1 and #2 ............................... 16 <br />4.4.3 Installing Ground Strut ...................................................................... 17 <br />4.4.4 Installing Guardrail ............................................................................ 17 <br />4.4.5 Installing Cable Anchor Bracket ........................................................ 18 <br />4.4.6 Installing MSKT Impact Head ........................................................... 18 <br />4.4.7 Installing Cable Assembly ................................................................. 19 <br /> <br /> <br />5. Inspection Checklist for MSKT ....................................................... 20-21 <br /> <br /> <br />6. Repairing the MSKT ................................................................................... 22 <br /> <br /> <br />7. Allowable Options for the MSKT ......................................................... 23 <br /> <br /> <br />PUBLICATION ~ 062717