My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7579 - SP7585
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP7508 -
>
SP7579 - SP7585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 10:07:13 AM
Creation date
1/30/2023 1:10:04 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Arbour Dr., Bond Wy., Moreland St. and Treasure Ave.
Limits
Arbour Dr.: Shippee Lane to Bond Way
Bond Wy: Treasure Avenue to Arbour Drive
Moreland St.: South End to Stockton City Limits
Treasure Ave.: Shippee Lane to Bond Way
Year
2022
Project Engineer
Enrique Silva
Roads Worked
Arbour Dr., Bond Wy., Moreland St., Treasure Ave.
Red Lines
Yes
Project #
222121
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7579 - SP7585
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LU- 1 <br />L <br />ll <br />Existing SDI to <br />remain in place <br />33 <br />32 <br />31 <br />30 <br />29 <br />28 <br />27 <br />LEGEND: <br />Remove Subbase, Base and Surfacing and Place 0.25' HMA <br />— Existing Curb and Gutter. <br />o Existing Survey Monument Box to remain in place. <br />Existing PGE <br />Vault <br />to remain in <br />place. <br />0 <br />Remove Subbase, Base and Surfaci <br />Place 0.25' HMA <br />Consf� <br />m <br />N <br />� 0 <br />T W <br />J <br />L� <br />�CD <br />Co <br />+ N <br />N <br />W <br />MORELAND STREE' <br />m <br />LOIq <br />+ N <br />N <br />W <br />--j <br />DATUM MONUMENT <br />Monument Box Lid <br />Sta 18+88 <br />Elev. 30.989 <br />– Remove and Replace <br />existing Curb, Gutter and <br />Saw Cut Driveway (Typ <br />I 1 L- U <br />Al I — CrArq- N RD DRA NJ <br />Existing Curb and Gutter to �n - r °' <br />CD Ow0 <br />remain in place, unless otherwise + � o N J o j <br />noted in the plans. + R&D Drainage <br />Pipe and Asphalt <br />Concrete Ramp. <br />COUNTY OF SAN JOAQUIN NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED <br />Enrique Suva 5/22%�/�� 5%As <br />PLAN <br />DATE <br />5{� <br />PROFILE <br />Existing Ground ------------ <br />Finish Grade Horizontal Scale 1:1 <br />FL Right ------...--- Vertical Scale 1:20 <br />FL Left _.._.._.._.._.._.._.._ <br />33 <br />32 <br />31 <br />30 <br />29 <br />28 <br />27 <br />ARBOUR DRIVE, BOND WAY, MORELAND STREET I Sheet No. <br />AND TREASURE AVENUE RESURFACING 3 of 7 <br />N <br />Ncli <br />DO <br />O <br />O <br />O <br />O <br />N <br />C3 <br />O <br />O <br />N <br />O <br />M <br />O <br />00 <br />00 <br />O <br />O <br />O <br />M <br />N <br />O 4- <br />1c00 <br />0 <br />o <br />°' <br />+ <br />+ <br />0.14% <br />+ <br />0.1 <br />% _ <br />_ <br />_- <br />-p- <br />— <br />- <br />0. <br />8 <br />.07 <br />10+00 <br />1 1 <br />+00 12+00 <br />13+00 <br />14+00 <br />1 5+nn <br />COUNTY OF SAN JOAQUIN NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED <br />Enrique Suva 5/22%�/�� 5%As <br />PLAN <br />DATE <br />5{� <br />PROFILE <br />Existing Ground ------------ <br />Finish Grade Horizontal Scale 1:1 <br />FL Right ------...--- Vertical Scale 1:20 <br />FL Left _.._.._.._.._.._.._.._ <br />33 <br />32 <br />31 <br />30 <br />29 <br />28 <br />27 <br />ARBOUR DRIVE, BOND WAY, MORELAND STREET I Sheet No. <br />AND TREASURE AVENUE RESURFACING 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.