My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7556 - SP7561
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP7508 -
>
SP7556 - SP7561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 10:06:04 AM
Creation date
1/30/2023 2:12:24 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Dodds Road Resurfacing
Limits
Carrolton Road to Mariposa Road
Year
2022
Project Engineer
Hung Ho
Roads Worked
Dodds Road
Red Lines
Yes
Project #
222123
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7556 - SP7561
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J In <br />IM <br />M <br />M <br />0 <br />r <br />M <br />z <br />0 <br />1' <br />NOTE: Reduce Shoulder Backing <br />placement to existing hinge point, if <br />the existing shoulder width is less <br />than 4 feet. Const <br />I <br />I <br />--- -- - - - Limits of Clearing and Grubbing <br />- - - --- 18 21 ' <br />I <br />----------- - 17'-20' Geosynthetic Pavement Interlayer (Paving Fabric) <br />-- 0.25' HMA Overlay Match Match <br />Exist Slope Exist Slope <br />2' 2, EP <br />0.5'- <br />I <br />Vor I 8% <br />- Conform <br />Grade Existing Shoulder <br />to place Tapered Edge, <br />1' minimum width (Typ) <br />4' <br />I Vor <br />- Conform <br />Grade Existing Shoulder <br />to place Tapered Edge, <br />1' minimum width (Typ) <br />2, EP <br />0.5' i <br />8% <br />TE <br />TE <br />30' <br />TYPICAL SECTION <br />Sta 10+10 to Sta 63+04 <br />Existing <br />Roadway <br />RECORD DRAWING <br />0wrectlone br_ _ <br />No Changes By_.` w►- �,� <br />Ck ta-.. <br />Any Pe. r, . <br />AllInlOr+ - r r: Itiqn t Al <br />EP 2, 2, <br />--{ �— 0.5' <br />TE �— <br />V9r <br />i <br />Coi st <br />I <br />Limits of Clearing and Grubbing ........... -- - <br />-- -- --- .. 20 122' - - - <br />I <br />------- - 19'-21' Geosynthetic Pavement Interlayer (Paving Fabric) - - ---- -�.-� <br />0.25' HMA Overlay Match Match TE <br />Exist Slope Exist Slope <br />30' <br />TYPICAL SECTION <br />Sta 63+25 to Sta 95+56 <br />COUNTY OF SAN JOAQUIN <br />I NO SCALE <br />I TYPICAL SECTIONS <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER <br />DATE <br />CHECKED <br />DATE <br />Hv,o Ho <br />2/2022 <br />U'1� ' �f <br />f <br />/1M, � <br />1 <br />ift <br />_... Conform- <br />Variable Depth <br />4Shoulder Backing (Typ) <br />EP 2, 4, <br />-0.5 <br />8% I <br />Var <br />Existing Conform - <br />Roadway <br />Variable Depth <br />Shoulder Backing (Typ) <br />DODDS ROAD RESURFACING <br />(Carrolton Road to Mariposa Road) <br />Sheet No. <br />2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.