Project
Road District 4 Streets Resurfacing 2021-2022
Limits
Patton Ave.: Copperopolis Rd. to Ada Ave.
Sibley Ave.: Copperopolis Rd. to Ada Ave.
Year
2021
Project Engineer
Aimee Cambra
Roads Worked
Patton Ave., Sibley Ave.
Red Lines
Yes
Project #
222125
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7486 - SP7490
Type
Resurfacing
Document Relationships
Ada Avenue (Stockton)
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1' Imo— 0'-4' <br />Conform <br />Remove Subbase, Base and Surfacing (0.25') <br />Place HMA 0.25' <br />EP <br />Limits of Clearing and <br />Var <br />----------j-- <br />Const <br />Grubbing and Mailbox Relocation <br />20'-22' <br />i <br />Var <br />EP <br />I <br />----——--—— — — —--� <br />Existing Roadway <br />Patton <br />TYPICAL <br />Avenue: <br />SECTION <br />Sta <br />38+60 <br />Sta <br />10+16 <br />to <br />Sibley <br />Avenue: <br />Sta <br />50+20 <br />to <br />Sta <br />76+42 <br />-r_ <br />1. 0.25' HMA Overlay must be placed in two-{� #dyers of approximately equal thickness. <br />2. Pavement core data is unavailable; however, anticipate varying layers of base and roadway surfacing <br />materials within the sectional planing depth of the existing roadway. <br />3. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has been in place for <br />a minimum of 18 hours. <br />4. Placement of HMA driveways must not begin until the HMA used for Mainline Paving has been completed. <br />5. Existing highway and utility facilities must remain in place unless otherwise noted. <br />6. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless <br />otherwise noted. <br />7. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct <br />earthwork operations so as not to modify or obstruct the existing drainage. <br />8. Hand grinding of roadway surfacing will be required at locations where existing highway and utility <br />facilities are within the Remove Subbase, Base and Surfacing and Pavement Repair limits. Payment for <br />hand grinding will be considered as included in the contract unit price paid for Remove Subbase, Base <br />and Surfacing. <br />9. Shoulder Backing material at all intersection radii must receive Penetration Treatment at 0.25 <br />gallon/square yard. Limits of the Penetration Treatment work must be confined to intersection radii plus <br />fifty feet (50') in each direction or to the intersection conform. <br />10. All Earthwork, except for final shoulder grading, must be completed prior to placing the final layer of <br />HMA pavement. No Shoulder Backing material will be deposited or drifted onto the final layer of HMA <br />surfacing. Where the shoulder placement exceeds 0.50' in thickness, the Shoulder Backing must be <br />placed in two (2) or more fully compacted layers. <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />NO SCALE <br />DATE <br />i�17'i V L <br />• 0'-4' 1' <br />_Vr <br />Conform <br />Variable depth Shoulder Backing (Typ) <br />See Shoulder Detail (Sheet No 4.) <br />11. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities <br />constructed under this contract with a minimum 24 hour prior notice to the County. All testing must <br />conform to the Standard Specifications. All re—testing will be paid by the Contractor. <br />12. The Contractor must exercise due caution and carefully preserve survey bench marks, control points, <br />reference points and all survey stakes, and must bear all expenses for replacement and/or errors <br />caused by their unnecessary loss or disturbance. <br />13. Prior to commencing any work, it will be the Contractors responsibility to have each utility company <br />locate in the field their main service lines and laterals. The Contractor must notify members of the <br />Underground Service Alert (U.S.A.) 48 hours in advance of performing excavation work by calling the toll <br />free number (1-800-542-2444) or 811. <br />14. Roadways, or segments thereof, that are to have the surface removed may be temporarily closed during <br />construction activities, but remain open for local traffic. Schedule of closure(s) must be approved by <br />the Engineer. The Contractor must provide two weeks advance notice to all affected residents, services, <br />schools, etc. of the scheduled closure. Content of public notification must be approved by the Engineer. <br />15. The Contractor must place temporary ramps to affected residents' driveways at the end of each working <br />day if a drop off greater than 0.15' exists. Ramp materials must be consistent with that of the <br />roadbed (or roadway) surface that is to be placed upon. Payment for this work will be considered as <br />included in the various items of work. <br />OftWHU DRAW <br />•/ �w.A Using n Drt <br />GENERAL NOTES ANDI ROAD DISTRICT 4 STREETS RESURFACING 2021-20221 Sheet No. <br />TYPICAL SECTION (Patton Avenue and Sibley Avenue: Copperopolis Road to Ada Avenue) 2 of 5 <br />CHECKED <br />DATE <br />�ttAt <br />
The URL can be used to link to this page
Your browser does not support the video tag.