Laserfiche WebLink
oayc <br />kttCOR D DRAWING <br />M"Non mesa ey <br />LEGEND: <br />Remove Subbase, Base and Surfacing 0.25' <br />and Place HMA 0.25' <br />Conform Location <br />Pip, P`�END PROJECT <br />REMOVE SUBBASE, BASE AND SURFACING (CONFORM) <br />Street <br />Location <br />Begin <br />Station <br />Planing <br />Depth <br />Width <br />(Measured from (L) <br />Location <br />End <br />Station <br />Planing <br />Depth <br />M <br />Lt <br />Rt <br />Patton Avenue <br />1 <br />10+16 <br />0.25' <br />47' <br />58' <br />2 <br />38+60 <br />0.25' <br />Sibley Avenue <br />3 <br />50+20 <br />0.25' <br />44' <br />71' <br />4 <br />76+42 <br />0.25' <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />NO SCALE I PLAN <br />DATE CHECKED DATE <br />COPD <br />ADA AVENUE END PROJECT <br />T"\-Sta 6+42 4 <br />Cn <br />Z <br />C <br />In <br />U) <br />m <br />Z <br />C <br />M <br />NORMAN AVENUE <br />Ln 5ta SU+2u <br />BEGIN PROJECT <br />COPPEROPOLIS ROAD <br />ROAD DISTRICT 4 STREETS RESURFACING 2021-20221 Sheet No. <br />(Patton Avenue and Sibley Avenue: Copperopolis Road to Ada Avenue) 1 3 of 5 <br />