My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits-2020_PS-2003501 thru PS-2004000_-PS-2003575
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2020
>
PS-2003501 thru PS-2004000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits-2020_PS-2003501 thru PS-2004000_-PS-2003575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2023 9:23:23 AM
Creation date
3/20/2023 9:21:10 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2003575
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2020
Notes2
7707 S. Ash St.; Both Sides of Fourth St. 10' N/O Ash St.
Address
4907 Griffin Rd., Hughson,CA 95326
Application
Leam Backhoe & Underground
Type
Trench
Supplemental fields
Cross Ref
PWP110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IM <br />Pacific Gas and <br />Gas Service Record (GSR) <br />Form ro—ebanP—w-Em,Rev. 2h <br />Publication Date oa/td72a2a <br />Electric Company <br />H completing thison�msahle ls foan by hood, use nblue or block Ink <br />Effective Dade. 0l <br />Lot #: <br />Nctlf. #: 119187335 <br />PM Order #: 35185015 <br />Address: 7707 S ASH ST City; FRENCH CAMP <br />Applicant/Tract Name: ANTONIO NOCETI / 209-482-6969 <br />Est. LAN ID: JGH5 Date Issued: <br />7/16/2C <br />Leak #: <br />Install Pipe: ❑No El Yes <br />Install Pipe: ❑No El Yes <br />El New Phased Service <br />Type: ❑ PE2406/2708 ❑ Other: <br />w <br />Type: ❑ PE2406/2708 ❑ Other: <br />❑ Stub <br />Mfg' ❑Deis omance/ ❑ Other : <br />mfg. ❑plex Prise mance/ ❑Other: <br />Stub <br />s <br />s <br />eCompletion <br />Ne❑ <br />Mfg Date: <br />Mfg Date: <br />®Full Service <br />❑Branch Service —Ref. # <br />Type: ❑Stub ®Other: COMPLETE SERVICE <br />Type: ❑Com Ietion El <br />Replacement: <br />Excavation Agent: El PG&E ®Applicant <br />Installation Agent: El ®Applicant <br />r <br />Excavation Agent: El PG&E El Applicant <br />Installation Agent: El El Applicant <br />w <br />El Full Service <br />El Partial Service <br />PG&E <br />PG&E <br />mo <br />❑Branch Service — Ref. # <br />A R <br />A R <br />Person in charge A ID and signature or printed name° <br />Person in charge A ID and signature orprinted name° <br />❑ Riser <br />Date: <br />Date: <br />❑ Transfer <br />El Alteration <br />❑Soap Test <br />❑Soap Test <br />E] Repair <br />Tested by: <br />" <br />Tested by: <br />Abandonment <br />Qualified field rep IAN ID and signature or printed name') <br />Date: <br />-----------------El <br />Qualified field rep IAN ID and signature or printed <br />Date: <br />name° <br />N <br />ElDprate <br />Convert to: ❑Main ❑Service <br />Pressure: psig Duration: <br />min. <br />Pressure: psig Duration: <br />min. <br />I <br />I El Other: <br />Main: in. <br />Status: <br />El ❑Existing ❑Installed <br />w, <br />Status: ®None El Existing El Installed <br />Installed Stub/Service: In. <br />e <br />�i <br />Reason <br />Nine: Flow Series: 800 <br />Mat'I: ❑Plastic ❑Metallic Mfg: <br />Matt: <br />®Plastic ❑Metallic Size: ❑Y In. [Al in. ❑Other in. <br />Size: ❑Y in. El in. ❑Other in. <br />Existing Stu S/ In. <br />Mfg: <br />❑Elster—Perfection El Other: <br />v <br />Critical Isolation Valve: El No El Yes El Unknown <br />Status: El None El Existing El Installed <br />Status: <br />E] Existing El Installed Size: 1 X 3/4 In. <br />Type: ❑Cathodic Protection Size: <br />®Locating Size: 10 <br />Location: <br />®Outside El Inside Bypass: ®No El Yes <br />Start: ®Main El Branch ❑Other. <br />Connection Method: ®Band ❑Strap/Wrap <br />Type: <br />®Prefabricated E] Service Head Adapter El Steel <br />End: ®Riser El Branch ❑Other. <br />Connection Method: El Bond ®Strap/Wrap <br />Riser Velve Mfg.: ❑Jomar El Other: <br />Isolated Steel Service (ISS): ®No El Yes El <br />Existing <br />CP Read Required: ®No El Yes <br />Weld Inspection Required: El No ®Yes <br />Anode: ®No ❑Existing El Installed Size: <br />_Ibbs. <br />By: <br />= <br />By: <br />(Qualified field rep. NN ID and signature or printed namea) <br />(Qualified field rep. IAN IN and signature or primed name*) <br />— <br />Type: El Zinc El Magnesium # Installed: <br />Pipe—ti—Soil: mV Date: <br />Date: <br />Location: El Riser El Valve El Service <br />Reading Location: El Riser El Valve El Service <br />Type: El Radiographic El Visual ❑Mag. Particle <br />As—Built By: Contractor: <br />Date: <br />(IAN ID) <br />(Nome and company name) <br />$ <br />As—Built By: Contractor: <br />Date: <br />(IAN ID) <br />(Name and company name) <br />APPLICANT TO TRENCH AND INSTALL (88') OF 1" PL <br />HP SERVICE, 800 EFV AND 3/4" RISER. ENCROACHMENT PERMIT REQUIRED BY APPLICANT. <br />PG&E TO INSPECT AND TIE—IN <br />°If <br />LAN ID is not available, write name and company name; Include employee Identifier it available. <br />Draw sketch in space below. <br />J <br />J <br />O_ <br />d <br />H <br />_ <br />o <br />I <br />00 <br />I— <br />w <br />x I <br />W <br />d <br />cn <br />J <br />� I <br />N <br />7707 S. <br />x <br />w <br />ASH ST. <br />IN ST. 1" PL 63 <br />P5' <br />N <br />I <br />ASH ST.80'L_ <br />I <br />d <br />x <br />P/L -- <br />-- <br />I <br />I <br />w <br />0 <br />J <br />d <br />PG&E Internal <br />02020 Pacific Gas and Electric Company. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.