Laserfiche WebLink
2-5.04-2. Cross-cutting is allowed under the same conditions as Section Z:-.5 .. 02(6)(3). If cross-cuts o_c.cu.r within the 150 feet minimum interval, resu1facing may be substituted with a slurry· seal for that half of the roadway. (See County Standard Drawing No. R-36). Exceptions Excavation is prohibited in newly renovated County roadways for three (3) years after a notice of completion has been filed for a roadway improvement project, or a new roadway has been accepted. The Director of Public Works may approve exceptions that are in the best interest of the public, including but not limited to: A An emergency that endang.ers life or property. B. For repair or modification to prevent interruption of essential utility service. C. For relocation work that is mandated by County, State or Federal law. D. For service for buildings where no other reasonable means of providing service e)cists. E. For potholing to verify utility depth or location. F. For trench less excavations greater than three feet in depth of cover over the utility facility, and not requiring a significant surface Incision greater than industry bore pit standards. -Exceptions must be requested and submitted in writing to the Department. Payment of a nonrefundable processing-fee is also required. Exceptions will be reviewed using the Departments Action Approval process, which requires the recommendation of a IJeputy Director. 43