Laserfiche WebLink
NOTES: 1 . 2. 3. 4. If the distance between cross-cuts are less then 150' the entire area between corss-cuts shall be planed and resurfaced with one (1) inch of ,n.sphalt Conc1-ete. The resurfacing rnquirements shall be in addition to County Standard Drawing No. R-29. Resurfacing for Bell Holes shall meet' th-ese rnql:lirernents. If excavation occurs within the shoulder 01-lane, only that area shall be resufaced as. shown. If crnss-cutting is performed on Local Roads at intervals less then 150' a Seal Coat for that half of the roadway containing the trench can be used in• lieu of resurfacing. Section 2-5.03 (B-2). Paved Shoulde1-l4 0.. w T 0 T T 0 _l T 0 ,-.l T 0 ~ .l I ,_ J "l:l:::1 21 01 ~, ~, I (:::).1 I I +-' CJ) ,-CJ) E2 :.:Jo TRENCH CUTTING POL~CV CROSS CUTTING OF COUNTY ROADWAYS COUNTY OF SAN JOAQUIN DEPARTMENT OF PUBLIC WORKS Approved by: No. Revision Descri tion Date Wo.rltlng for YOU Date: MAY 2015 Std. Dwg. No.