Laserfiche WebLink
NOTES: 1 . The 1-esunacing 1-equirements shall be in addition to County Standrn-d Drawing No. R-29. If longitudinal cuts rn-e required on a Local Road a Seal Coat can be used for that half of the roadway containing the trench. Section 2-5.03 (B-1 ). 2. Area to be resurfaced with one (1) inch Asphalt Concrete ovei-\ay existing su1iace to be planed, to accommodate overlay. Section 2-5,02 (B-2).---n 0... w Area to be resu1iaced with one (1) inch Asphalt Concrete overlay existing surface to be planed to accommodate overlay. Section 2-5.02 (B-2) ---+--=v,.J''/~"""/1 -3' 1111n1mum. If <3', the 1-emaining pavement shall be removed and replaced before resurfacing. Section 2-5.02 (B-1 ). Area to be resurfaced with one ( 1) inch Asphalt Concrete overlay existing surface to b.e planed to accommodate overlay. Section 2-5.02 (B-1 ). .. TRENCH CUTTING POLICY lONGITUDINAL CUTTING Of COUNTY ROADWAYS Approved by: µLl)fir No. Revision Descri tion Date -··!.• ..... ; COUNTY OF SAN JOAQUIN DEPARTMENT OF PUBLIC WORKS Working for YOU Date: MAY 2015 std. Dwg. No.