Laserfiche WebLink
2. Cross-cutting is allowed under the same conditions as Section 2- <br />5 .02(8)(3). lf cross-cuts occur within the 150 feet minimum interval , <br />resurfacing may be substituted with a slurry seal for that half of <br />the roadway. (See County Standard Drawing Νο. R-36). <br />2 -5 .04 ExceQtions <br />Excavation is prohibited in newly renovated County roadways for three (3) <br />years after a notice of completion has been filed for a roadway improvement <br />project , or a new roadway has been accepted. The Director of Public Works <br />may approve exceptions that are in the best interest of the public, including <br />but not limited to: <br />Α. An emergency that endangers life or property. <br />Β . For repair or modification to prevent interruption of essential utility <br />service. <br />C. For relocation work that is mandated by County , State or Federal <br />law. <br />Ο . For service for buildings where no other reasonable means of <br />providing service exists . <br />Ε. For potholing to verify utility depth or location . <br />F. For trenchless excavat ions greater than three feet in depth of cover <br />over the utility facility , and not requiring a significant surface <br />lncision greater than industry bore pit standards . <br />Exceptions must be requested and submitted in writing to the Departmen t. <br />Payment of a nonre f undable processing fee is also required . Exceptions <br />will be reviewed using the Departments Action Approval p rocess , which <br />requires the recommenda t ion of a Deputy Director. <br />43