Laserfiche WebLink
N0TES: <br />1. lf the distance between cross-cuts are less then 150' the entire area between <br />corss-cuts shall be planed and resurfaced with one ( 1) inch of Asphalt Concrete. <br />2. The resurfacing requirernents shall be in addition to County Standard Drawing Νο. <br />R-29. <br />3. Resurfacing for Bell Holes shall rneet these requirernents . lf excavation occurs within <br />the shoulder or lan e, only that area shall be resufaced as shown. <br />4. lf cross-cutti ng is perforrned on Local Roads at intervals less then 150' α Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03 (Β-2). <br />Θ1 <br />Ό <br />C ο ω +-' <br />,..--,, Q) <br />ω ..--\.... <br />υ'-' υ Ο C <br />'t: ω ο <br />:::i cυ (/) ο <br />+-' <br />σ,..C ο <br />C ;':: ..C <br />:;:; 3: Ω. <br />(/) (/) <br />Paved Shoulder ι • •ι 1 ·χ ω <( <br />ω ~ 4- <br />ω 't:: ο <br />C ::J ..C <br />ο ω υ <br />0:::: ω C <br />•-~.~ <br />ο... w 1 <br />l,,,d,,,,;,,,,b,,,;,,,,b,,,I J_ <br />\....,_ <br />1 1 <br />..--1 <br />1 <br />1 1 1 Ι l <br />:::jj:::I <br />~Ι <br />z' ωl <br />ω ι <br />(/) 1 <br />τ · ' 1 <br />ο <br />Ι <br />Τ <br />ο ..-- <br />1_ ιι:::,,,ι,,,, (trccycrr <<<<<r<<r1 +-' (/) <br />•-(/) <br />Ε ο •-\.... _Jυ <br />TRENCH CUTTING POLICY <br />CROSS CUTTING OF <br />COUNTY ROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Approved by: <br />j(JJ JJLr <br />Νο .Ι Revision Description I Date <br />Working for YOU Date: DEC 20 14 ι Std. Dwg. Νο. R-36