My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_Driveway Permits_PS-2201501 thru PS-2202000_ - PS-2201649
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
DRIVEWAY PERMITS
>
PS-2201501 thru PS-2202000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_Driveway Permits_PS-2201501 thru PS-2202000_ - PS-2201649
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 9:51:12 AM
Creation date
4/26/2023 9:48:20 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2201649
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Notes2
4946 E. Eight Mile Rd.; S/S of Eight Mile Rd.; 1386' E/O HWY 99
Address
PO Box 1007, Woodbridge,CA 95258
Application
Blaine Vernon
Type
Driveway Encroachment
Supplemental fields
APN
08607009
Cross Ref
PWP110005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br />Winter Weather Utility Work <br />SUPERVISION: The utility company (permittee) shall furnish full-time supervision of all work to insure <br />compliance with the permit provision. <br />2. START OF WORK: No work within the County right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br />4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br />5. WEATHER -TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather -tight condition prior to <br />any rain. <br />X.TNCROACHNIEN MGeneml Revisions (Encroachment Permils)NSnler Weather Pmvisians.dacs <br />
The URL can be used to link to this page
Your browser does not support the video tag.