Laserfiche WebLink
A <br />C <br />0 <br />E <br />F <br />0 <br />0 <br />0 <br />n <br />0 <br />0 <br />to <br />C <br />0 <br />0 <br />0 <br />o <br />0 <br />II _ <br />0 <br />N <br />0 <br />0 <br />C <br />0 <br />II <br />o <br />0 <br />0 <br />0 <br />C <br />0 <br />II <br />0 <br />r <br />0 <br />0 <br />n <br />r_ <br />Cr Cr <br />0 <br />co <br />to <br />0 <br />0 <br />C <br />0 00 <br />n <br />a� <br />Q <br />0 <br />1 2 5 6 7 8 9 <br />0I SOLICITATION SET 15 OCT 2021 <br />NO REVISIONS DATE <br />CONSTRUCTION NOTES <br />1. ALL OFF-SITE CONSTRUCTION MATERIAL AND METHODS SHALL COMPLY WITH <br />THE WITH THE LATEST EDITION OF THE CITY OF STOCKTON AND SAN JOAQUIN <br />COUNTY STANDARD PLANS & SPECIFICATIONS AND THE LATEST CALTRANS <br />STANDARD SPECIFICATIONS. ON-SITE WORK SHALL COMPLY WITH VA USACE <br />REQUIREMENTS AND PROJECT SPECIFICATIONS. <br />2. CONTRACTOR SHALL LEAVE AN EMERGENCY PHONE NUMBER WITH THE POLICE <br />AND FIRE DEPARTMENTS. <br />3. CONTRACTOR SHALL POST ON THE SITE, EMERGENCY TELEPHONE NUMBERS FOR <br />PUBLIC WORKS, AMBULANCE, POLICE, AND FIRE DEPARTMENTS. <br />4. CONTRACTOR SHALL NOTIFY ALL PUBLIC OR PRIVATE UTILITY OWNERS 48 <br />HOURS PRIOR TO COMMENCEMENT OF WORK ADJACENT TO THE UTILITY UNLESS <br />AN EXCAVATION PERMIT SPECIFIES OTHERWISE. <br />5. NOT USED. <br />6. CONTRACTOR TO CONTACT UNDERGROUND SERVICE ALERT U.S.A. 811 <br />FORTY-EIGHT (48) HOURS PRIOR TO BEGINNING WORK TO HAVE THE LOCATION <br />OF EXISTING UNDERGROUND UTILITIES MARKED. IT SHALL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY, LOCATE, AND PROTECT ALL <br />UNDERGROUND FACILITIES. <br />7. THE CONTRACTOR SHALL HIRE A STREET CLEANING CONTRACTOR TO CLEAN UP <br />DIRT AND DEBRIS FROM CITY STREETS THAT ARE ATTRIBUTABLE TO THE <br />DEVELOPMENT'S CONSTRUCTION ACTIVITIES. <br />8. ALL GRADING SHALL BE PERFORMED IN SUCH A MANNER AS TO COMPLY WITH <br />THE STANDARDS ESTABLISHED BY THE AIR QUALITY MAINTENANCE DISTRICT FOR <br />AIRBORNE PARTICULATES (DUST). <br />9. ALL GRADING SHALL CONFORM TO APPROVED SPECIFICATIONS PRESENTED <br />HEREON OR ATTACHED HERETO. ALL GRADING WORK SHALL BE OBSERVED AND <br />APPROVED BY THE SOILS ENGINEER. THE SOILS ENGINEER SHALL BE NOTIFIED <br />AT LEAST 48 HOURS BEFORE BEGINNING ANY GRADING. UNOBSERVED AND <br />UNAPPROVED GRADING WORK SHALL BE REMOVED AND REDONE AT THE <br />CONTRACTORS EXPENSE. <br />10. ALL MATERIALS, REQUIRED FOR THE COMPLETE EXECUTION OF THE PROJECT, <br />SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS OTHERWISE <br />NOTED. <br />11. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN <br />OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY DURING THE <br />CONSTRUCTION PERIOD. <br />12. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR OR REPLACE ANY <br />EXISTING IMPROVEMENTS OF UNDERGROUND FACILITIES DAMAGED DURING THE <br />CONSTRUCTION PERIOD. <br />13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL ENCROACHMENT, <br />EXCAVATION, CONCRETE, ELECTRICAL, PLUMBING, ETC. PERMITS NECESSARY <br />PRIOR TO BEGINNING CONSTRUCTION FOR ANY WORK. <br />14. THE CONTRACTOR SHALL HAVE A SUPERINTENDENT OR REPRESENTATIVE ON <br />SITE AT ALL TIMES DURING CONSTRUCTION. <br />15. STORAGE OF CONSTRUCTION MATERIAL AND EQUIPMENT ON CITY STREETS WILL <br />NOT BE PERMITTED. <br />16. CONSTRUCTION EQUIPMENT SHALL BE PROPERLY MUFFLED. UNNECESSARY <br />IDLING OF GRADING CONSTRUCTION EQUIPMENT IS PROHIBITED. <br />17. CONSTRUCTION EQUIPMENT, TOOLS, ETC. SHALL NOT BE CLEANED OR RINSED <br />INTO A STREET, GUTTER OR STORM DRAIN. <br />18. A CONTAINED AND COVERED AREA ON-SITE SHALL BE USED FOR STORAGE OF <br />CEMENT BAGS, PAINTS, FLAMMABLE, OILS, FERTILIZERS, PESTICIDES, OR ANY <br />OTHER MATERIALS THAT HAVE POTENTIAL FOR BEING DISCHARGED TO THE <br />STORM DRAIN SYSTEM BY WIND OR IN THE EVENT OF A MATERIAL SPILL. <br />19. ALL CONSTRUCTION DEBRIS SHALL BE GATHERED ON A REGULAR BASIS AND <br />PLACED IN A DUMPSTER WHICH IS EMPTIED OR REMOVED WEEKLY. WHEN <br />FEASIBLE, TARPS SHALL BE USED ON THE GROUND TO COLLECT FALLEN <br />DEBRIS OR SPLATTERS THAT COULD CONTRIBUTE TO STORMWATER POLLUTION. <br />20. ANY TEMPORARY ON-SITE CONSTRUCTION PILES SHALL BE SECURELY COVERED <br />WITH A TARP OR OTHER DEVICE TO CONTAIN DEBRIS. <br />21. CONCRETE TRUCKS AND CONCRETE FINISHING OPERATIONS SHALL NOT <br />DISCHARGE WASH WATER INTO THE STREET GUTTERS OR DRAINS. <br />BASIS OF BEARINGS <br />THE GRID BEARING OF NORTH 27"18'18" EAST FOR THE LINE BETWEEN <br />POINT "COS 1047" & POINT "KSN BASE", BASED ON THE NORTH <br />AMERICAN DATUM OF 1983 (NAD83), (EPOCH DATE 1991.35), AS <br />SHOWN ON THAT MAP FILE FOR RECORD AT BOOK 37 OF SURVEYS AT <br />PAGE 11 1, SAN JOAQUIN COUNTY RECORDS, WAS USED AS THE BASIS <br />OF BEARINGS SHOWN HEREON THIS SURVEY. <br />CONTRACTOR RESPONSIBILITY <br />CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY <br />FOR JOB SITE CONDITIONS, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY, <br />DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, AND THAT THIS <br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING <br />HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE <br />ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION <br />WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING <br />FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. <br />DISCREPANCIES <br />IF THERE ARE ANY <br />DISCREPANCIES <br />BETWEEN DIMENSIONS IN DRAWINGS AND EXISTING <br />CONDITIONS WHICH <br />WILL <br />AFFECT THE <br />WORK, THE CONTRACTOR SHALL BRING SUCH <br />DISCREPANCIES TO <br />THE <br />ATTENTION <br />OF THE ENGINEER FOR ADJUSTMENT BEFORE <br />PROCEEDING WITH <br />THIS <br />WORK. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR THE <br />PROPER FITTING OF ALL <br />WORK AND <br />FOR THE COORDINATION OF ALL TRADES, <br />SUBCONTRACTORS, <br />AND <br />PERSONS <br />ENGAGED UPON THIS CONTRACT. <br />GENERAL SITE NOTES <br />1. CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING ON THIS WORK AND <br />CONSIDER THE EXISTING CONDITIONS AND SITE CONSTRAINTS IN THE BID. <br />CONTRACTOR SHALL BE IN THE POSSESSION OF AND FAMILIAR WITH ALL <br />APPLICABLE GOVERNING AGENCIES STANDARD DETAILS AND SPECIFICATIONS PRIOR <br />TO SUBMITTING OF A BID. <br />2. ALL WORK ON-SITE AND IN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO ALL <br />APPLICABLE GOVERNING AGENCIES STANDARD DETAILS & SPECIFICATIONS. <br />3. PRIOR TO BEGINNING WORK, AND AFTER INITIAL HORIZONTAL CONTROL STAKING, <br />CONTRACTOR SHALL FIELD CHECK ALL ELEVATIONS MARKED WITH (E) AND REPORT <br />ANY DISCREPANCIES GREATER THAN 0.05' TO THE ENGINEER. <br />4. DAMAGE TO ANY EXISTING SITE IMPROVEMENTS, UTILITIES AND/OR SERVICES TO <br />REMAIN SHALL BE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL <br />REPAIR AND/OR REPLACE IN KIND. <br />5. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY <br />FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS <br />PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY THAT THIS <br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL <br />WORKING HOURS AND THAT THE CONTRACTOR SHALL DEFEND INDEMNIFY AND HOLD <br />THE CLIENT, THE CONSULTING ENGINEER AND THE CITY HARMLESS FROM ANY AND <br />ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF <br />WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE <br />NEGLIGENCE OF THE CLIENT OR THE CONSULTING ENGINEER. <br />PROJECT SITE MAINTENANCE <br />1. REMOVE ALL DIRT, GRAVEL, RUBBISH, REFUSE, AND GREEN WASTE FROM STREET <br />PAVEMENT AND STORM DRAINS ADJOINING THE SITE. LIMIT CONSTRUCTION ACCESS <br />ROUTES ONTO THE SITE AND PLACE GRAVEL PADS AT THESE LOCATIONS. DO NOT <br />DRIVE VEHICLES AND EQUIPMENT OFF THE PAVED OR GRAVELED AREAS DURING WET <br />WEATHER. <br />2. SWEEP OR VACUUM THE STREET PAVEMENT AND SIDEWALKS ADJOINING THE <br />PROJECT SITE AND THE ON-SITE PAVED AREAS ON A DAILY BASIS. SCRAPE <br />CAKED -ON MUD AND DIRT FROM THESE AREAS BEFORE SWEEPING. CORNERS AND <br />HARD TO REACH AREAS SHALL BE SWEPT MANUALLY. <br />3. CREATE A CONTAINED AND COVERED AREA ON THE SITE FOR THE STORAGE OF <br />BAGS, CEMENT, PAINTS, OILS, FERTILIZERS, PESTICIDES, OR OTHER MATERIALS USED <br />ON THE SITE THAT HAVE THE POTENTIAL OF BEING DISCHARGED INTO THE STORM <br />DRAIN SYSTEM THROUGH EITHER BEING WIND-BLOWN OR IN THE EVENT OF A <br />MATERIAL SPILL. <br />4. NEVER CLEAN MACHINERY, EQUIPMENT OR TOOLS INTO A STREET, GUTTER OR <br />STORM DRAIN. <br />5. ENSURE THAT CEMENT TRUCKS, PAINTERS, OR STUCCO/PLASTER FINISHING <br />CONTRACTORS DO NOT DISCHARGE WASH WATER FROM EQUIPMENT, TOOLS OR <br />RINSE CONTAINERS INTO GUTTERS OR DRAINS. <br />M : WOM901101;T_lyzfl M7MI1= <br />THE CONTRACTOR SHALL KEEP UP-TO-DATE AND ACCURATE A COMPLETE RECORD <br />SET OF PRINTS OF THE CONTRACT DRAWINGS SHOWING EVERY CHANGE FROM THE <br />ORIGINAL DRAWINGS MADE DURING THE COURSE OF CONSTRUCTION INCLUDING EXACT <br />FINAL LOCATION, ELEVATION, SIZES, MATERIALS, AND DESCRIPTION OF ALL WORK. <br />RECORDS SHALL BE "REDLINED" ON A SET OF CONSTRUCTION PLAN DRAWINGS. A <br />COMPLETE SET OF CORRECTED AND COMPLETED RECORD DRAWING PRINTS SHALL BE <br />SUBMITTED TO THE CITY ENGINEER AND DEVELOPER'S CIVIL ENGINEER PRIOR TO FINAL <br />ACCEPTANCE FOR REVIEW AND APPROVAL BY THE CITY ENGINEER. <br />EARTHWORK NOTE <br />IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INCLUDE ALL MATERIAL AND LABOR <br />REQUIRED WITHIN THE BID PRICE, FOR EARTHWORK CONSTRUCTION, TO CARRY OUT THE <br />CUT/FILL AND/OR IMPORT/EXPORT AS NECESSARY TO MEET THE DESIGN GRADES SHOWN <br />ON THE PLANS. CONTRACTOR IS TO DELIVER TO OWNER THE PROJECT IN A COMPLETE <br />AND OPERATIONAL MANNER. EARTHWORK QUANTITIES SHOWN ON THE PLANS OR <br />REPRESENTED BY THE ENGINEER ARE APPROXIMATE AND ARE FOR GRADING PERMIT <br />APPROVAL ONLY. THE CONTRACTOR IS RESPONSIBLE FOR ANY INVESTIGATION OR STUDIES <br />THAT ARE REQUIRED BY THE CONTRACTOR TO SATISFY THIS REQUIREMENT. NO ADDITIONAL <br />COMPENSATION SHALL BE PAID FOR SAID CUT/FILL AND/OR IMPORT/EXPORT. <br />CONSULTANTS: CONSULTANT: ARCHITECTS/ENGINEERS: <br />ARCHITECTURE/ MECHANICALIELECTRICAL/ CIVIL t SURVEYOR: FIRE PROTECTION: • DATE 10/14 2021 <br />INTERIOR DESIGN/ PLUMBING: <br />SECURITY/SIGNAGE/ Sands Jenson Hughes Inc. Q�pF ESSlpN� <br />COMMUNICATIONS/ Gayner Engineers 636 9th Street 2950 Buskirk Avenue, Ste. 225 ��� �p . KU <br />MEDICAL EQUIPMENTIMASTER PLAN 1133 Post Street Oakland, CA 94607 Walnut Creek, CA 94597• BUILD ON. <br />LANDSCAPE/ San Francisco,CA 94109 C-, v <br />ENVIRONMENTAL SANDISMEi No. 70870 <br />r <br />ASSESSMENT: STRUCTURAL: GEOTECHNICAL COST ESTIMATING: F)l <br />• Exp. 6!34123 <br />Degenkolb Engineers Allegiance GroupAECOM ��q Cl �Q <br />HDR Architecture, Inc. 375 Beale Street, Suite 500 4321 SW Corbett #200 300 California Street, Suite 400 A N D I I <br />CAL <br />201 California Street, Suite 1500 San Francisco,CA 94105 Portland, OR 97239 San Francisco, CA 94104 R.C.E. NO. 70870, EXPIRES - 0-23 <br />San Francisco, CA 94111 <br />2 <br />3 <br />4 <br />5 <br />Ix, <br />ABAAS NOTES <br />I. ALL SITE WORK SHALL BE IN CONFORMANCE WITH THE UNIFORM FEDERAL <br />ACCESSIBILITY STANDARDS EXCEPT AS MODIFIED BY THE DEPARTMENT OF <br />VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE (PG -18-13). <br />2. CURB RAMPS SHALL BE A MINIMUM OF 4 FEET WIDE AND NOT EXCEED <br />A SLOPE OF 1:20 (5%). <br />J. ENTRANCE RAMPS TO BUILDINGS SHALL NOT EXCEED A SLOPE OF <br />1:33.3 (3%) UNLESS RAILINGS ARE SHOWN ON ARCHITECTURAL PLANS, <br />IN WHICH CASE THE SLOPE SHALL NOT EXCEED 1:20 (5%). <br />4. A 2% MAXIMUM SLOPE LANDING SHALL BE PROVIDED AT PRIMARY <br />ENTRANCES TO BUILDINGS, THE LANDINGS SHALL HAVE A MINIMUM <br />WIDTH OF 72" WHEN THE DOOR OPENS INTO THE BUILDING. WHEN <br />THE DOOR OPENS ONTO THE LANDING THE DEPTH SHALL BE 42" <br />PLUS THE WIDTH OF THE DOOR MINIMUM. <br />5. RAMPS ARE DEFINED AS ANY WALKWAY BETWEEN SLOPES OF 1:33.3 <br />(3%) AND 1:20 (5%), AND SHALL HAVE A MAXIMUM CROSS SLOPE OF <br />2%. RAMPS SHALL HAVE INTERMEDIATE (2% MAXIMUM SLOPE) LANDINGS <br />A MINIMUM OF 60" BY 48" IN SIZE. LANDINGS SHALL BE EVERY 35 <br />FEET FOR RAMPS BETWEEN 1:33.3 AND 1:20. ALL RAMPS SHALL <br />HAVE HANDRAILS. <br />6. MAXIMUM CROSS SLOPE ON ANY SIDEWALK OR RAMP SHALL BE 2% <br />MAXIMUM. SLOPE WITHIN PARKING STALLS DESIGNATED AS ACCESSIBLE <br />PARKING SHALL BE 2% IN ANY DIRECTION. <br />7 SIDEWALKS WILL BE 5.0' MINIMUM. <br />UNDERGROUND WORK CAUTION <br />CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT FOR <br />LOCATION OF UNDERGROUND UTILITIES AT LEAST 48 HOURS PRIOR <br />TO COMMENCEMENT OF CONSTRUCTION. FOR NORTHERN CALIFORNIA <br />DIAL 811 OR (800) 227-2600. FOR OTHER AREAS CALL (800) <br />642-2444. CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES <br />PRIOR TO BEGINNING ANY WORK ON THIS SITE. <br />In 000ME1MI_1M5 <br />ELEVATIONS FOR THIS SURVEY ARE BASED ON THE NAVD88 <br />VERTICAL DATUM (GEOID 12B) AND WERE DETERMINED BY GLOBAL <br />NAVIGATION SATELITE SYSTEM SURVEY METHODS UTILIZING STATIC <br />GPS OBSERVATIONS AND PROCESSED THROUGH THE ONLINE <br />POSITIONING USER SERVICE (OPUS) PROVIDED BY THE NATIONAL <br />GEODETIC SURVEY (NGS) IN ACCORDANCE WITH THE REQUIREMENTS <br />OF THE UNITED STATES ARMY CORPS OF ENGINEERS (USACE) <br />ENGINEERING AND DESIGN MANUAL (EM) 1110-2-6056. SITE <br />BENCHMARK IS A MAG NAIL WITH ALUMINUM DISK SET IN THE <br />PAVEMENT ON THE EAST SIDE OF MANTHEY ROAD. <br />ELEVATION = 16.600 <br />DUST CONTROL NOTES <br />1. WATER TRUCKS SHALL BE PRESENT AND IN USE AT THE <br />CONSTRUCTION SITE. ALL PORTIONS OF THE SITE SUBJECT TO <br />BLOWING DUST SHALL BE WATERED AS OFTEN AS DEEMED <br />NECESSARY BY THE CLIENT/INSPECTOR IN ORDER TO INSURE <br />PROPER CONTROL OF BLOWING DUST FOR THE DURATION OF <br />THE PROJECT. <br />2. ALL PUBLIC STREETS AND MEDIANS SOILED OR LITTERED DUE <br />TO THIS CONSTRUCTION ACTIVITY SHALL BE CLEANED AND <br />SWEPT ON A DAILY BASIS DURING THE WORK WEEK, OR AS <br />OFTEN AS DEEMED NECESSARY BY THE CONTRACTING <br />OFFICER'S REPRESENTATIVE. <br />3. ALL TRUCKS HAULING SOIL, SAND, AND OTHER LOOSE <br />MATERIALS SHALL BE COVERED WITH TARPAULINS OR OTHER <br />EFFECTIVE COVERS. <br />4. WHEEL WASHERS SHALL BE INSTALLED AND USED TO CLEAN <br />ALL TRUCKS AND EQUIPMENT LEAVING THE CONSTRUCTION <br />SITE. IF WHEEL WASHERS CANNOT BE INSTALLED, TIRES OR <br />TRACKS OF ALL TRUCKS AND EQUIPMENT SHALL BE WASHED <br />OFF BEFORE LEAVING THE CONSTRUCTION SITE. <br />5. THE CONTRACTOR SHALL DEMONSTRATE DUST SUPPRESSION <br />MEASURES, SUCH AS REGULAR WATERING, WHICH SHALL BE <br />IMPLEMENTED TO REDUCE EMISSIONS DURING CONSTRUCTION <br />AND GRADING IN A MANNER MEETING THE APPROVAL OF THE <br />CONSTRUCTION MANAGER. THIS SHALL ASSIST IN REDUCING <br />SHORT-TERM IMPACTS FROM PARTICLES WHICH COULD <br />RESULT IN NUISANCES THAT ARE PROHIBITED BY RULE 403 <br />(FUGITIVE DUST). <br />6. GRADING OR ANY OTHER OPERATIONS THAT CREATES DUST <br />SHALL BE STOPPED IMMEDIATELY IF DUST AFFECTS ADJACENT <br />PROPERTIES. THE CONTRACTOR SHALL PROVIDE SUFFICIENT <br />DUST CONTROL FOR THE ENTIRE PROJECT SITE IN <br />ACCORDANCE WITH THE PROJECT SWPPP (IF ONE EXISTS) OR <br />AS APPLICABLE PER LOCAL REGULATIONS AT ALL TIMES. THE <br />SITE SHALL BE SPRINKLERED AS NECESSARY TO PREVENT <br />DUST NUISANCE. IN THE EVENT THAT THE CONTRACTOR <br />NEGLECTS TO USE ADEQUATE MEASURES TO CONTROL DUST, <br />THE CLIENT RESERVES THE RIGHT TO TAKE WHATEVER <br />MEASURES ARE NECESSARY TO CONTROL DUST AND CHARGE <br />THE COST TO THE CONTRACTOR. <br />7. THE CONTRACTOR IS RESPONSIBLE FOR DUST CONTROL <br />MEASURES AND FOR OBTAINING ALL REQUIRED PERMITS AND <br />APPROVALS. ALL GRADING OPERATIONS SHALL BE SUSPENDED <br />DURING SECOND (OR WORSE) STAGE SMOG ALERTS. <br />STORM DRAIN NOTES <br />1. PRIVATE STORM DRAIN LINE 4 -INCH THROUGH 12 -INCH WITH A <br />MINIMUM OF TWO (2) FEET OF COVER IN NON -TRAFFIC AREAS <br />SHALL BE POLYVINYL CHLORIDE (PVC) SDR 35 GREEN PIPE AND <br />SHALL CONFORM TO THE REQUIREMENTS OF ASTM DESIGNATION D <br />3034-73 WITH BELLS AND SPIGOT CONNECTIONS. ALL DIRECTION <br />CHANGES SHALL BE MADE WITH WYE CONNECTIONS, 22.5' ELBOWS, <br />45° ELBOWS OR LONG SWEEP ELBOWS, 90` ELBOWS AND TEE'S <br />ARE PROHIBITED. <br />2. PRIVATE STORM DRAIN LINE 6 -INCH THROUGH 12 -INCH WITH A <br />MINIMUM OF THREE (3) FEET OF COVER IN VEHICULAR TRAFFIC <br />AREAS SHALL BE POLYVINYL CHLORIDE (PVC) C900, RATED FOR <br />200 PSI CLASS PIPE. PROVIDE AND INSTALL "STORM DRAIN" <br />MARKER TAPE FOR THE ENTIRE LENGTH OF PIPE TRENCH, ALL <br />DIRECTION CHANGES SHALL BE MADE WITH WYE CONNECTIONS, <br />OBTUSE ELBOWS OR LONG SWEEP ELBOWS, 90° ELBOWS AND <br />TEE'S ARE PROHIBITED. <br />3. ALL AREA DRAINS AND CATCH BASINS GRATES WITHIN PEDESTRIAN <br />ACCESSIBLE AREAS SHALL MEET ADA REQUIREMENTS. <br />4. ALL TRENCHES SHALL BE BACK FILLED PER THE SPECIFICATIONS <br />WITH APPROPRIATE TESTS BY THE GEOTECHNICAL ENGINEER TO <br />VERIFY COMPACTION VALUES, <br />5. FOR GRAVITY FLOW SYSTEMS CONTRACTOR SHALL VERIFY (POTHOLE <br />IF NECESSARY) SIZE, MATERIAL, LOCATION AND DEPTH OF ALL <br />SYSTEMS THAT ARE TO BE CONNECTED TO OR CROSSED PRIOR TO <br />THE TRENCHING OR INSTALLATION OF ANY GRAVITY FLOW SYSTEM. <br />6. PRIVATE STORM DRAIN PIPES LARGER THAN 12 INCHES SHALL BE <br />CLASS III RCP. STORM DRAIN PIPES IN VEHICULAR AREAS BETWEEN <br />2 AND 3 FEET SHALL BE CLASS III RCP. IN VEHICULAR AREAS <br />WITH LESS THAN 2 FEET OF COVER THE PIPE SHALL BE CLASS V <br />RCP. PROVIDE AND INSTALL "STORM DRAIN" MARKER TAPE FOR <br />THE ENTIRE LENGTH OF PIPE TRENCH. ALL DIRECTION CHANGES <br />SHALL BE MADE AT A MANHOLE. <br />Drawing Title Prujsci Title <br />CIVIL NOTES VA Livermore Realignment and <br />Closure - Manthey Rd. Offsite and <br />Onsite Revisions <br />7 <br />cation Stockton (French Camp) <br />San Joaquin County, CA <br />Dale Checked by Drawn <br />15 OCT 2021 MAK SEC <br />8 <br />StationNumber Project Number <br />640 640.423 <br />Butlding Number <br />Drawing number <br />CS101 <br />9 <br />Office of <br />Construction <br />and Facilities <br />Management <br />F <br />