Laserfiche WebLink
r <br />0 <br />m <br />00 <br />,_ <br />F <br />0 <br />A <br />n <br />s <br />d <br />s <br />Q <br />s <br />to <br />L <br />s <br />r <br />0 <br />0 o <br />c <br />0 <br />s io <br />0 <br />c <br />0 <br />s0 <br />E <br />C* <br />0 <br />m <br />c <br />0 <br />F <br />o <br />n <br />s <br />U <br />c <br />•L <br />s <br />to <br />0 <br />`6 <br />B <br />0 <br />0 <br />0 o <br />c <br />0 <br />s io <br />0 <br />c <br />0 <br />s0 <br />E <br />C* <br />0 <br />1 2 5 I 6 7 8 9 <br />6" <br />NEW CURB 6" EXISTING CURB 1/2" R _6 3/4" <br />3„ 112" R - - <br />A.C. PAVEMENT LIGHT POLE PER LIGHT _ r 76x127rnm {3"x5") <br />G 6„ <br />SLOPED PER P LAN FIXTURE SCHEDULE — REINFORCED <br />RESDISTANT SHAND � REWS LE WITH <br />/ PROVIDE IN-LINE SCREW-TYPE <br />° FUSE HOLDER(S) WITH FUSE(S). <br />ad a' <br />d'. . ° <br />° <br />° <br />a a °o ANCHOR BOLTS PER POLE <br />a sr• ° Q°° o ° ° - POLE GROUNDING STUD <br />AS REQUIRED °° ° °°° ° MANUFACTURER'S <br />o o R CL. II A.B. REQUIREMENTS WITH LEVELING <br />" °�, o ° °0 oa NUTS ABOVE & BELOW BASE 2 -PIECE BOLT COVER PLATE. <br />12" LONG #4 DOWELS (TYP.) o ° a PLATE PER MANUFACTURER <br />A 3" a�• , 6" SCARIFY AND ` I FINISHED GRADE <br />(DRILL HOLES AND SET IN EPDXY) ° COMPACT TO 95% REL. <br />2 MIN. COVER ALL AROUND - <br />a COMPACTION. <br />CONTRACTOR SHALL <br />PREPARE SOILS AS N "' PVC CONDUIT ADAPTER <br />3 MIN. NECESSARY TO i COUPLING <br />EMBEDMENT INTO PROVIDE A STABLE <br />UNDISTURBED SUBGRADE SUBGRADE <br />25 4mm III "} EMPTY PVC CONDUIT <br />CONDUIT WITH CAP <br />6� VERTICAL CURB (WHERE SHOWN ON RIGID STEEL CONDUIT <br />PLANS) BOND TO REBAR <br />SECTION A—AJCONCRETE BASE <br />' <br />UNDISTURBED SOIL <br />(CURB & GUTTER) NTS & REINFORCING STEEL, OR SELECT BACKFILL <br />SEE NOTE BELOW COMPACTED, SEE <br />SECTION A— A 545 VERT BARS & NOTE BELOW. <br />(VERTICAL CURB #3 SPIRAL WITH 8" PITCH <br />#4 BARE COPPER <br />GROUND 6069mm (20'-0") 1800 <br />NOTES: SEE PLANS FOR EDGE NEW AC PAVEMENT COILED BELOW BASE <br />CONDITION AT AC I SLOPED PER PLAN GENERAL NOTES: <br />1. CLEAN ALL DUST AND DEBRIS FROM HOLES PRIOR TO PAVEMENT EDGE SEE PLANS FOR <br />SETTING DOWELS IN EPDXY. ,+ I SAWCUT EXISTING I BACKFILL, CONCRETE. REINFORCING STEEL, AND ANCHOR BOLTS ARE <br />WIDTH (24 SHOWN FOR REFERENCE ONLY. STRUCTURAL DESIGN IS SHOWN ON <br />MINIMUM) PAVEMENT EDGE STRUCTURAL DRAWINGS. <br />DOWELNEW CU�RTO EXISTING RB EXISTING 2 REFER TO SPECIFICATIONS SECTION 26 56 00 FOR MOUNTING AND <br />1 CUPAVEMENT LEVELING REQUIREMENTS. <br />NTS <br />3- WHERE POLE FOUNDATION OVERLAPS WITH ADJACENT FOUNDATIONS <br />INTEGRATE REINFORCING OF BOTH FOUNDATIONS. <br />3" Ac % POLE BASE DETAIL - PLANTING AREAS <br />PAVEMENT A \�i\�/��/��/�`//� NTS <br />°o °° 0 J0 o° °o ° FULL DEPTH OF UNDISTURBED <br />°[ 8 Cd o °off°° °cam o`b°° °o`b`° °off°°(�°off°°(�°ob°°(�° NATIVE MATERIAL <br />$o °o go o �� °a Bo a �o � ���E°4 �o�o 6o ADJACENT PAVEMENT <br />00 00 00 00 00 00 00 00 00 (8" MINIMUM) <br />oho off°oho off°o 00�°oho off°oPoooff°ohooff°oPoooff°ohooc°oho <br />0 0 0 0 0 o o <br />ASPHALT DEEP LIFT <br />NTS <br />6" CL. II A.B. 95% <br />REL. COMPACTION <br />REFER TO CALTRANS <br />STANDARD SPECS <br />SECTION 26-1.0213- <br />6" SCARIFY AND COMPACT <br />TO 95% REL. COMPACTION. <br />CONTRACTOR SHALL <br />PREPARE SOILS AS <br />NECESSARY TO PROVIDE A <br />STABLE SUBGRADE <br />ASPHALT PAVEMENT SECTION -DRIVE AISLES/ROADWAY (TI -6) <br />NTS <br />LANDSCAPE AREA PAVEMENT AREA <br />STANDARD 2" GALVANIZED <br />STEEL POST PER <br />CALTRANS SPECIFICATIONS <br />SECTION 56 <br />SLOPE CONCRETE <br />AWAY FROM POST <br />FINISHED GRADE <br />CALTRANS CIA <br />CD <br />MINOR CD <br />CONCRETE <br />SIGN FOOTING DETAIL <br />NTS <br />18" <br />R=1/2"— <br />A.C. <br />=1/2"— <br />A.C. PAVEMENT 2:12 BATTER <br />SLOPED PER PLAN ++ <br />6 <br />CL. II A.B. 12" <br />0 o c 0 o QO 08 <br />3 4„ <br />6" SCARIFY AND <br />o°.?0-0 OO°po,°, <br />o°O°°O�°�°°/ <br />\o ��°°flj0O%°COMPACT TO 95% REL. o° <br />°° °°°°°COMPACTION. o� 14 °o °o° O O 0 <br />° <br />o /°° <br />7� °°°CONTRACTOR SHALL ! 77/ fj <br />PREPARE SOILS AS <br />NECESSARY TO PROVIDE <br />A STABLE SUBGRADE Z I ����0 CL. 11 A.B. <br />NOTE: <br />PER CBC CHAPTER 1 1 B THE SLOPE OF UNDISTURBED NATIVE <br />THE GUTTER PAN SHALL NOT EXCEED 5% SOIL <br />AT ACCESSIBLE RAMPS. <br />A <br />�� 6" CURB WITH 18F GUTTER <br />N.T.S. <br />0SOLICITATION SET 15 OCT 2021 <br />O <br />NI REVISIONS DATE <br />CONSULTANTS: CONSULTANT: ARCHITECTS/ENGINEERS: <br />ARCHITECTURE/ MECHANICAUELECTRICAL/ CIVIL i SURVEYOR: FIRE PROTECTION: DATE 10/14 2021 <br />INTERIOR DESIGN/ PLUMBING: <br />SECURITYISIGNAGEI Sands Jenson Hughes Inc. ,e, of E SS l pv <br />COMMUNICATIONS/ Gayner Engineers 636 9th Street 2950 Buskirk Avenue, Ste. 225 ��� gyp,. KUY/� F <br />MEDICAL EQUIPMENTIMASTER PLAN 1133 Post Street Oakland, CA 94607 Walnut Creek, CA 94597 • BUILD ON. ��'p <br />LANDSCAPE/ San Francisco,CA 94109 C-, v <br />ENVIRONMENTAL SANDIS.NEi <br />LJ No. 70870 r <br />ASSESSMENT: STRUCTURAL: GEOTECHNICAL COST ESTIMATING: <br />• Exp. 6!30123 <br />Degenkolb Engineers Allegiance Group AECOM ��q CML �Q <br />HDR Architecture, Inc. 375 Beale Street, Suite 500 4321 SW Corbett #200 SAN DIS I <br />300 California Street, Suite 400 CAL <br />201 California Street, Suite 1500 San Francisco,CA 94105 Portland, OR 91239 San Francisco, CA 94104 R.C.E. NO. 70870, EXPIRES__6_-_:5_0 -23 <br />San Francisco, CA 94111 <br />2 <br />3 <br />4 <br />5 <br />6 <br />5'-0" <br />Drawing Title Prajsci Title <br />CIVIL CONSTRUCTION DETAILS - SITE VA Livermore Realignment and <br />Closure - Manthey Rd. Offsite and <br />Onsite Revisions <br />7 <br />tion Stockton (French Camp) <br />San Joaquin County, CA <br />Dwe Checked by Dra-,Nn <br />15 OCT 2021 MAK GL <br />8 <br />StationNumber Project Number <br />640 640.423 Office of <br />Butlding Number Construction <br />and Facilities <br />Drawing number <br />CK100 <br />8 <br />9 <br />Management <br />A <br />B <br />0 <br />D <br />E <br />F <br />0 <br />W <br />,_ <br />0 <br />F <br />n <br />s <br />c <br />•L <br />Cr <br />0 <br />0 <br />1 2 5 I 6 7 8 9 <br />6" <br />NEW CURB 6" EXISTING CURB 1/2" R _6 3/4" <br />3„ 112" R - - <br />A.C. PAVEMENT LIGHT POLE PER LIGHT _ r 76x127rnm {3"x5") <br />G 6„ <br />SLOPED PER P LAN FIXTURE SCHEDULE — REINFORCED <br />RESDISTANT SHAND � REWS LE WITH <br />/ PROVIDE IN-LINE SCREW-TYPE <br />° FUSE HOLDER(S) WITH FUSE(S). <br />ad a' <br />d'. . ° <br />° <br />° <br />a a °o ANCHOR BOLTS PER POLE <br />a sr• ° Q°° o ° ° - POLE GROUNDING STUD <br />AS REQUIRED °° ° °°° ° MANUFACTURER'S <br />o o R CL. II A.B. REQUIREMENTS WITH LEVELING <br />" °�, o ° °0 oa NUTS ABOVE & BELOW BASE 2 -PIECE BOLT COVER PLATE. <br />12" LONG #4 DOWELS (TYP.) o ° a PLATE PER MANUFACTURER <br />A 3" a�• , 6" SCARIFY AND ` I FINISHED GRADE <br />(DRILL HOLES AND SET IN EPDXY) ° COMPACT TO 95% REL. <br />2 MIN. COVER ALL AROUND - <br />a COMPACTION. <br />CONTRACTOR SHALL <br />PREPARE SOILS AS N "' PVC CONDUIT ADAPTER <br />3 MIN. NECESSARY TO i COUPLING <br />EMBEDMENT INTO PROVIDE A STABLE <br />UNDISTURBED SUBGRADE SUBGRADE <br />25 4mm III "} EMPTY PVC CONDUIT <br />CONDUIT WITH CAP <br />6� VERTICAL CURB (WHERE SHOWN ON RIGID STEEL CONDUIT <br />PLANS) BOND TO REBAR <br />SECTION A—AJCONCRETE BASE <br />' <br />UNDISTURBED SOIL <br />(CURB & GUTTER) NTS & REINFORCING STEEL, OR SELECT BACKFILL <br />SEE NOTE BELOW COMPACTED, SEE <br />SECTION A— A 545 VERT BARS & NOTE BELOW. <br />(VERTICAL CURB #3 SPIRAL WITH 8" PITCH <br />#4 BARE COPPER <br />GROUND 6069mm (20'-0") 1800 <br />NOTES: SEE PLANS FOR EDGE NEW AC PAVEMENT COILED BELOW BASE <br />CONDITION AT AC I SLOPED PER PLAN GENERAL NOTES: <br />1. CLEAN ALL DUST AND DEBRIS FROM HOLES PRIOR TO PAVEMENT EDGE SEE PLANS FOR <br />SETTING DOWELS IN EPDXY. ,+ I SAWCUT EXISTING I BACKFILL, CONCRETE. REINFORCING STEEL, AND ANCHOR BOLTS ARE <br />WIDTH (24 SHOWN FOR REFERENCE ONLY. STRUCTURAL DESIGN IS SHOWN ON <br />MINIMUM) PAVEMENT EDGE STRUCTURAL DRAWINGS. <br />DOWELNEW CU�RTO EXISTING RB EXISTING 2 REFER TO SPECIFICATIONS SECTION 26 56 00 FOR MOUNTING AND <br />1 CUPAVEMENT LEVELING REQUIREMENTS. <br />NTS <br />3- WHERE POLE FOUNDATION OVERLAPS WITH ADJACENT FOUNDATIONS <br />INTEGRATE REINFORCING OF BOTH FOUNDATIONS. <br />3" Ac % POLE BASE DETAIL - PLANTING AREAS <br />PAVEMENT A \�i\�/��/��/�`//� NTS <br />°o °° 0 J0 o° °o ° FULL DEPTH OF UNDISTURBED <br />°[ 8 Cd o °off°° °cam o`b°° °o`b`° °off°°(�°off°°(�°ob°°(�° NATIVE MATERIAL <br />$o °o go o �� °a Bo a �o � ���E°4 �o�o 6o ADJACENT PAVEMENT <br />00 00 00 00 00 00 00 00 00 (8" MINIMUM) <br />oho off°oho off°o 00�°oho off°oPoooff°ohooff°oPoooff°ohooc°oho <br />0 0 0 0 0 o o <br />ASPHALT DEEP LIFT <br />NTS <br />6" CL. II A.B. 95% <br />REL. COMPACTION <br />REFER TO CALTRANS <br />STANDARD SPECS <br />SECTION 26-1.0213- <br />6" SCARIFY AND COMPACT <br />TO 95% REL. COMPACTION. <br />CONTRACTOR SHALL <br />PREPARE SOILS AS <br />NECESSARY TO PROVIDE A <br />STABLE SUBGRADE <br />ASPHALT PAVEMENT SECTION -DRIVE AISLES/ROADWAY (TI -6) <br />NTS <br />LANDSCAPE AREA PAVEMENT AREA <br />STANDARD 2" GALVANIZED <br />STEEL POST PER <br />CALTRANS SPECIFICATIONS <br />SECTION 56 <br />SLOPE CONCRETE <br />AWAY FROM POST <br />FINISHED GRADE <br />CALTRANS CIA <br />CD <br />MINOR CD <br />CONCRETE <br />SIGN FOOTING DETAIL <br />NTS <br />18" <br />R=1/2"— <br />A.C. <br />=1/2"— <br />A.C. PAVEMENT 2:12 BATTER <br />SLOPED PER PLAN ++ <br />6 <br />CL. II A.B. 12" <br />0 o c 0 o QO 08 <br />3 4„ <br />6" SCARIFY AND <br />o°.?0-0 OO°po,°, <br />o°O°°O�°�°°/ <br />\o ��°°flj0O%°COMPACT TO 95% REL. o° <br />°° °°°°°COMPACTION. o� 14 °o °o° O O 0 <br />° <br />o /°° <br />7� °°°CONTRACTOR SHALL ! 77/ fj <br />PREPARE SOILS AS <br />NECESSARY TO PROVIDE <br />A STABLE SUBGRADE Z I ����0 CL. 11 A.B. <br />NOTE: <br />PER CBC CHAPTER 1 1 B THE SLOPE OF UNDISTURBED NATIVE <br />THE GUTTER PAN SHALL NOT EXCEED 5% SOIL <br />AT ACCESSIBLE RAMPS. <br />A <br />�� 6" CURB WITH 18F GUTTER <br />N.T.S. <br />0SOLICITATION SET 15 OCT 2021 <br />O <br />NI REVISIONS DATE <br />CONSULTANTS: CONSULTANT: ARCHITECTS/ENGINEERS: <br />ARCHITECTURE/ MECHANICAUELECTRICAL/ CIVIL i SURVEYOR: FIRE PROTECTION: DATE 10/14 2021 <br />INTERIOR DESIGN/ PLUMBING: <br />SECURITYISIGNAGEI Sands Jenson Hughes Inc. ,e, of E SS l pv <br />COMMUNICATIONS/ Gayner Engineers 636 9th Street 2950 Buskirk Avenue, Ste. 225 ��� gyp,. KUY/� F <br />MEDICAL EQUIPMENTIMASTER PLAN 1133 Post Street Oakland, CA 94607 Walnut Creek, CA 94597 • BUILD ON. ��'p <br />LANDSCAPE/ San Francisco,CA 94109 C-, v <br />ENVIRONMENTAL SANDIS.NEi <br />LJ No. 70870 r <br />ASSESSMENT: STRUCTURAL: GEOTECHNICAL COST ESTIMATING: <br />• Exp. 6!30123 <br />Degenkolb Engineers Allegiance Group AECOM ��q CML �Q <br />HDR Architecture, Inc. 375 Beale Street, Suite 500 4321 SW Corbett #200 SAN DIS I <br />300 California Street, Suite 400 CAL <br />201 California Street, Suite 1500 San Francisco,CA 94105 Portland, OR 91239 San Francisco, CA 94104 R.C.E. NO. 70870, EXPIRES__6_-_:5_0 -23 <br />San Francisco, CA 94111 <br />2 <br />3 <br />4 <br />5 <br />6 <br />5'-0" <br />Drawing Title Prajsci Title <br />CIVIL CONSTRUCTION DETAILS - SITE VA Livermore Realignment and <br />Closure - Manthey Rd. Offsite and <br />Onsite Revisions <br />7 <br />tion Stockton (French Camp) <br />San Joaquin County, CA <br />Dwe Checked by Dra-,Nn <br />15 OCT 2021 MAK GL <br />8 <br />StationNumber Project Number <br />640 640.423 Office of <br />Butlding Number Construction <br />and Facilities <br />Drawing number <br />CK100 <br />8 <br />9 <br />Management <br />A <br />B <br />0 <br />D <br />E <br />F <br />