Laserfiche WebLink
xWed <br />U) <br />x <br />Ln <br />O <br />O <br />�o <br />0)� <br />O C)N <br />�)> <br />U +, U) <br />m <br />C) x <br />Q Q)Ln <br />C),;4- <br />0 �O <br />I <br />-0 MU <br />0 <br />c) EN <br />n <br />n <br />o � <br />L� <br />C: �4� <br />0 C) x <br />U Ln <br />\o <br />I <br />O NO <br />w Q0o <br />O N <br />20'R <br />TYP. <br />GEOTEX11LE FILTER <br />FABRIC 12" <br />CRUSHED AGGREGRATE GREATER <br />THAN 3" AND SMALLER THAN 6" <br />STABILIZED CONSTRUCTION ENTRANCE <br />SCALE: NTS <br />-� WOOD STAKE <br />(0.75" X 0.75", 24" IN LENGTH MIN..) <br />SECTION 'A' <br />NOTES: <br />1. FIBER ROLLS TO BE PLACED ALONG SITE CONTOURS. <br />A <br />J <br />FIBER ROLL (8"-10" DIA.) <br />IMBED ROLL J TO J THE THICKNESS <br />OF THE ROLL INTO EXISTING GROUND <br />SURFACE TO PROVIDE CUTOFF <br />EXISTING SLOPE (2:1 OR FLATTER) <br />2. HORIZONTAL SPACING VARIES DEPENDING ON SOIL TYPE AND STEEPNESS, SEE PLAN (10' MIN - 20' MAX.) <br />3. RUNOFF MUST NOT BE ALLOWED TO RUN UNDER OR AROUND ROLL. <br />FIBER ROLL ON SLOPE <br />SCALE: NTS <br />BMP INSTALLATION SCHEDULE <br />BEST MANAGEMENT <br />LOCATION <br />IMPLEMENTATION <br />MAINTENANCE SCHEDULE <br />PRACTICE <br />S�EPHE �, y <br />q � <br />SCHEDULE <br />.6/30 <br />ENG�N�.���Q' <br />A. PRESERVING <br />AROUND PERIMETER <br />CONTINUOUS, UNTIL <br />EDUCATE EMPLOYEES AND SUBCONTRACTORS REGARDING <br />EXISTING <br />OF PROJECT SITE <br />CONSTRUCTION IS <br />IMPORTANCE OF MAINTAINING EXISTING VEGETATION TO <br />VEGETATION <br />W Q <br />> Z U <br />COMPLETED <br />PREVENT EROSION AND FILTER AND SEDIMENT IN RUNOFF <br />a % �' <br />C <br />Q <br />FROM DISTURBED AREAS ON THE CONSTRUCTION SITE. <br />W <br />Z <br />LL,U <br />Q <br />L - <br />W Cly <br />O <br />INSPECT SITE PERIMETER MONTHLY TO VERIFY THE OUTSIDE <br />Sheet Title <br />EROSION & <br />SEDIMENT <br />VEGETATION IS NOT DISTURBED. <br />B. PROTECT <br />THROUGHOUT <br />CONTINUOUS <br />INSPECT GRADED AREAS AND SLOPES ON AT <br />GRADED AREAS <br />PROJECT SITE <br />LEAST A MONTHLY BASIS TO CHECK FOR EROSION. <br />AND SLOPES FROM <br />0 <br />Q <br />REGRADE TRIBUTARY AREAS OR INSTALL FILTER <br />WASHOUT AND <br />BARRIER OR SAND BAG DIKES AS NECESSARY TO <br />EROSION <br />a <br />PREVENT EROSION. <br />C. GRAVEL FILTER <br />ALONG FLOW <br />CONTINUOUS <br />INSPECT DAILY AND AFTER EACH STORM. REMOVE <br />LINES OF <br />ONSITE SEDIMENT DEPOSITED BEHIND BERM OR <br />UNPAVED <br />BARRIER TO MAINTAIN EFFECTIVENESS. <br />C/) <br />Z <br />ROADWAYS <br />WITHIN SITE <br />D. INLET FILTER <br />INLETS TO THE <br />CONTINUOUS UNTIL <br />INSPECT WEEKLY AND AFTER EACH STORM. <br />BAG <br />STORM DRAINAGE <br />LANDSCAPING IS IN <br />REMOVE SEDIMENT AND DEBRIS BEFORE <br />V)' <br />i <br />ILL]() <br />SYSTEM <br />PLACE <br />ACCUMULATIONS HAVE REACHED ONE THIRD THE <br />DEPTH OF THE BAG. REPAIR OR REPLACE INLET <br />C) <br />FILTER BAG AS SOON AS DAMAGE OCCURS. <br />E. FIBER ROLL <br />ANY SLOPES <br />CONTINUOUS <br />INSPECT WEEKLY AND AFTER EACH STORM. <br />GREATER THAN <br />REMOVE SEDIMENT DEPOSITED BEHIND FIBER ROLL <br />4:1 THROUGHOUT <br />WHENEVER NECESSARY TO MAINTAIN <br />PROJECT SITE <br />EFFECTIVENESS. <br />F. HYDROSEEDING <br />SLOPES GREATER <br />IN PLACE NO LATER <br />INSPECT SLOPES ON AT LEAST A MONTHLY BASIS <br />THAN 3:1 <br />THAN SEPTEMBER <br />TO CHECK FOR EROSION. IF EROSION IS NOTED, <br />15TH OF EACH YEAR <br />SPREAD STRAW MULCH OVER AFFECTED AREAS. <br />G. STABILIZED <br />ENTRANCES TO <br />CONTINUOUS, UNTIL <br />INSPECT ON A MONTHLY BASIS AND AFTER EACH <br />CONSTRUCTION <br />SITE FROM <br />ENTRANCES AND <br />RAINFALL. ADD AGGREGATE BASE MATERIAL <br />ENTRANCE <br />PUBLIC <br />ONSITE ROADWAYS <br />WHENEVER NECESSARY TO PREVENT SEDIMENT <br />ROADWAYS <br />ARE PAVED <br />FROM BEING TRACKED INTO PUBLIC STREET. <br />H. WIND EROSION <br />WHEREVER <br />CONTINUOUS UNTIL <br />INSPECT SITE DURING WINDY CONDITIONS TO <br />CONTROL <br />NECESSARY <br />GRADING IS <br />IDENTIFY AREAS WHERE WIND EROSION IS <br />PRACTICES <br />THROUGHOUT <br />COMPLETED AND SOILS <br />OCCURRING AND ABATE EROSION AS NECESSARY. <br />PROJECT SITE <br />HAVE STABILIZED <br />I. GOOD <br />THROUGHOUT <br />CONTINUOUS, UNTIL <br />INSPECT SITE ON AT LEAST A MONTHLY BASIS TO <br />HOUSEKEEPING <br />PROJECT SITE <br />CONSTRUCTION IS <br />VERIFY THAT GOOD HOUSEKEEPING PRACTICES ARE <br />MEASURES <br />COMPLETED <br />BEING IMPLEMENTED. <br />J. PROPER <br />DESIGNATED <br />CONTINUOUS, UNTIL <br />INSPECT SITE ON AT LEAST A WEEKLY BASIS TO <br />CONSTRUCTION <br />AREA PER <br />CONSTRUCTION IS <br />VERIFY THAT CONSTRUCTION MATERIALS ARE <br />MATERIAL STORAGE <br />PLANS <br />COMPLETED <br />STORED IN A MANNER, WHICH COULD NOT CAUSE <br />STORM WATER POLLUTION. <br />K. STREET AND <br />STREETS AND <br />CONTINUOUS, UNTIL <br />MAINTAIN STORM DRAINAGE FACILITIES AND PAVED <br />STORM DRAINAGE <br />STORM DRAINAGE <br />CONSTRUCTION IS <br />STREETS CLEAR OF SEDIMENT AND DEBRIS. <br />FACILITY <br />FACILITIES <br />COMPLETED <br />MAINTENANCE <br />DEFINITIONS <br />L. PROPER CONSTRUCTION WASTE STORAGE AND DISPOSAL INCLUDING: <br />1) CONCRETE SPILL <br />1) DESIGNATED <br />1) CONTINUOUS UN11L <br />1) INSPECT SITE ON AT LEAST A WEEKLY BASIS <br />CLEANUP <br />COLLECTION <br />CONSTRUCTION IS <br />TO ASSURE WASTE IS STORED PROPERLY AND <br />2) PAINT & <br />AREA <br />COMPLETED <br />DISPOSED OF AT LEGAL DISPOSAL SITE, DAILY. <br />PAINTING SUPPLIES <br />2) MATERIAL <br />2) IMMEDIATELY AT <br />2) INSPECT MATERIAL HANDING AREAS ON AT <br />3) VEHICLE FUELING <br />HANDLING AREA <br />TIME OF SPILL <br />LEAST A MONTHLY BASIS TO VERIFY PROPER SPILL <br />MAINTENANCE & <br />3) DESIGNATED <br />3)CONTIN000S <br />CLEANUP. <br />CLEANING <br />AREA WITH <br />3) KEEP AMPLE SUPPLIES OF SPILL CLEANUP <br />SECONDARY <br />MATERIALS ON SITE & INSPECT ON REGULAR <br />CONTAINMENT <br />SCHEDULE. <br />1. PHASES OF GRADING: <br />INITIAL: WHEN CLEARING AND GRUBBING ACTIVITIES OCCUR. <br />ROUGH: WHEN CUT AND FILL ACTIVITIES OCCUR AND THE SITE IMPROVEMENTS ARE CONSTRUCTED, INCLUDING <br />UNDERGROUND PIPING, STREETS, SIDEWALKS AND OTHER IMPROVEMENTS. <br />FINAL: WHEN FINAL ELEVATIONS ARE SET, AND SITE IMPROVEMENTS ARE COMPLETED AND READY FOR <br />CITY/COUNTY ACCEPTANCE. <br />BMP NOTES <br />THE FOLLOWING BMPS AS OUTLINED IN, BUT NOT LIMITED TO, THE BEST MANAGEMENT <br />PRACTICE HANDBOOK, CALIFORNIA STORMWATER QUALITY TASK FORCE, SACRAMENTO, <br />CALIFORNIA, JANUARY 2015, MAY APPLY DURING THE CONSTRUCTION OF THIS PROJECT <br />(ADDITIONAL MEASURES MAY BE REQUIRED IF DEEMED APPROPRIATE BY CITY INSPECTORS): <br />EROSION CONTROL <br />EC1-SCHEDULING <br />EC2-PRESERVATION OF EXISTING VEGETATION <br />EC3-HYDRAULIC MULCH <br />EC4-HYDROSEEDING <br />EC5-SOIL BINDERS <br />EC6-STRAW MULCH <br />EC7-GEOTEXTILES AND MATS <br />EC8-WOOD MULCHING <br />EC9-EARTH DIKES AND DRAINAGE SWALES <br />EC10-VELOCITY DISSIPA11ON DEVICES <br />EC11-SLOPE DRAINS <br />EC12-STREAMBANK STABILIZATION <br />EC13-RESERVED <br />EC14-COMPOST BLANKET <br />EC15-SOIL PREPARATION /ROUGHENING <br />EC16-NON-VEGETATIVE STABILIZATION <br />TEMPORARY SEDIMENT CONTROL <br />SE1-SILT FENCE <br />SE2-SEDIMENT BASIN <br />SE3-SEDIMENT TRAP <br />SE4-CHECK DAM <br />SE5-FIBER ROLLS <br />SE6-GRAVEL BAG BERM <br />SE7-STREET SWEEPING AND VACUUMING <br />SEB -SANDBAG BARRIER <br />SE9-STRAW BALE BARRIER <br />SE10-STORM DRAIN INLET PROTEC11ON <br />SE11-ACTIVE TREATMENT SYSTEMS <br />SE12-MANUFACTURED LINEAR SEDIMENT CONTROLS <br />SE13-COMPOST SOCKS AND BERMS <br />SE14-BIOFILTER BAGS <br />EQUIPMENT TRACKING CONTROL <br />TC1-STABILIZED CONSTRUCTION ENTRANCE/EXIT <br />TC2-STABILIZED CONSTRUCTION ROADWAY <br />TC3-ENTRANCE/OUTLET TIRE WASH <br />WIND EROSION CONTROL <br />WE1-WIND EROSION CONTROL <br />NON-STORMWATER MANAGEMENT <br />NS1-WATER CONSERVATION PRACTICES <br />NS2-DEWATERING OPERATIONS <br />NS3-PAVING AND GRINDING OPERATIONS <br />NS4-TEMPORARY STREAM CROSSING <br />NS5-CLEAR WATER DIVERSION <br />NS6-ILLICIT CONNECTION/DISCHARGE <br />NS7-POTABLE WATER/IRRIGATION <br />NS8-VEHICLE AND EQUIPMENT CLEANING <br />NS9-VEHICLE AND EQUIPMENT FUELING <br />NS10-VEHICLE AND EQUIPMENT MAINTENANCE <br />NS11-PILE DRIVING OPERATIONS <br />NS12-CONCRETE CURING <br />NS13-CONCRETE FINISHING <br />NS14-MATERIAL OVER WATER <br />NS15-DEMOLITION ADJACENT TO WATER <br />NS16-TEMPORARY BATCH PLANTS <br />WASTE MANAGEMENT & MATERIALS <br />POLLUTION CONTROL <br />WM1-MATERIAL DELIVERY AND STORAGE <br />WM2-MATERIAL USE <br />WM3-STOCKPILE MANAGEMENT <br />WM4-SPILL PREVENTION AND CONTROL <br />WM5-SOLID WASTE MANAGEMENT <br />WM6-HAZARDOUS WASTE MANAGEMENT <br />WM7-CONTAMINATED SOIL MANAGEMENT <br />WM8-CONCRETE WASTE MANAGEMENT <br />WM9-SANITARY/SEPTIC WASTE MANAGEMENT <br />WM10-LIQUID WASTE MANAGEMENT <br />EROSION CONTROL NOTES: <br />1. TEMPORARY EROSION CONTROL DEVICES SHOWN ON THE GRADING PLAN <br />WHICH INTERFERE WITH THE WORK SHALL BE RELOCATED OR MODIFIED AS <br />AND WHEN THE INSPECTOR SO DIRECTS AS THE WORK PROGRESSES TO <br />MEET "AS GRADED" CONDITIONS. <br />2. ALL LOOSE SOIL AND DEBRIS SHALL BE REMOVED FROM THE STREET AREAS <br />UPON STARTING OPERATIONS AND PERIODICALLY THEREAFTER AS DIRECTED <br />BY THE INSPECTOR <br />3. WHEN THE INSPECTOR SO DIRECTS, A 12 -INCH BERM SHALL BE MAINTAINED <br />ALONG THE TOP OF THE SLOPE OF THOSE FILLS ON WHICH GRADING IS NOT <br />IN PROGRESS. <br />4. STORM AND SEWER DRAIN TRENCHES THAT ARE CUT THROUGH BASIN DIKES <br />OR BASIN INLET DIKES SHALL BE PLUGGED WITH SANDBAGS. <br />5. EXCEPT WHEN THE INSPECTOR DIRECTS OTHERWISE, ALL DEVICES SHOWN <br />SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN RAIN IS <br />FORECAST, AND SHALL BE MAINTAINED DURING THE RAINY SEASON <br />(OCTOBER 15 TO APRIL 15). <br />6. SANDBAGS SHALL BE STOCKPILED ON SITE, READY TO BE PLACED IN <br />POSITION WHEN RAIN IS FORECAST, OR WHEN THE INSPECTOR SO DIRECTS. <br />7. A "STANDBY EMERGENCY CREW" SHALL BE ALERTED BY THE PERMITTEE OR <br />THE CONTRACTOR TO PERFORM EMERGENCY WORK DURING RAINSTORMS. THE <br />PARTY TO BE CONTACTED IS: <br />NAME: NN--- (TO BE FILLED IN BY CONTRACTOR) <br />PHONE NUMBER: <br />DUST CONTROL NOTES <br />1. DUST SHALL BE CONTROLLED BY WATERING AND/OR APPLYING A DUST <br />PALLIATIVE. THE DUST PALLIATIVE SHALL BE APPLIED IN THE AMOUNT AT <br />THE LOCATIONS AS DIRECTED BY THE ENGINEER. <br />2. WATER FOR DUST CONTROL SHALL BE APPLIED BY MEANS OF PRESSURE <br />TYPE DISTRIBUTORS OR PIPE LINES EQUIPPED WITH A SPRAY SYSTEM OR <br />HOSES WITH NOZZLES THAT WILL INSURE A UNIFORM APPLICATION OF <br />WATER. <br />3. UNLESS WATER IS APPLIED BY MEANS OF PIPE LINES, AT LEAST ONE <br />MOBILE UNIT WITH A MINIMUM CAPACITY OF 100 GALLONS SHALL BE <br />AVAILABLE FOR APPLYING WATER. <br />4. ALL SOIL MATERIALS OR DEBRIS TRUCKED FROM THE SITE SHALL BE <br />COVERED AND SPRINKLED PRIOR TO ENTERING PUBLIC STREETS. <br />5. PROVIDE FOR WET SUPPRESSION OR CHEMICAL STABILIZING OF EXPOSED <br />SOILS. <br />6. PROVIDE FOR RAPID CLEAN-UP OF SEDIMENTS DEPOSITED ON THE PAVED <br />ROADS. <br />7. LIMIT THE AMOUNT OF AREAS DISTURBED BY CLEARING & EARTH MOVING <br />OPERATIONS BY SCHEDULING THESE ACTIVITIES IN PHASES. <br />EROSION CONTROL LEGEND <br />FIBER ROLLS PER BEST MANAGEMENT PRACTICES <br />HANDBOOK DETAIL SE -5 <br />STABILIZED CONSTRUCTION ENTRANCE <br />JOB STAGING AREA: JOB TRAILER, MATERIAL <br />STORAGE EQUIPMENT, STORAGE WASTE, STORAGE, <br />CONCRETE WASHOUT, VEHICLE STORAGE AREA <br />DRAINAGE FLOW DIRECTION <br />SCALE 1 INCH = 10 FEET <br />10 0 10 20 <br />NORTH <br />L�:\ <br />2250 Douglas Blvd, Suite 200 <br />Roseville, CA 95661 <br />0:916.772.7688 <br />F:916.772.7699 <br />www.k,off.com <br />Engineer's Stamp <br />�o QROF ESS/p , <br />S�EPHE �, y <br />q � <br />W � <br />2087 <br />.6/30 <br />ENG�N�.���Q' <br />OF CAI.\FO <br />Project <br />Ce >= <br />Q <br />0 <br />LLE U <br />Q <br />� <br />Z Z <br />W � <br />J <br />O <br />W Q <br />> Z U <br />0Cez <br />W W <br />a % �' <br />C <br />Q <br />W oc 0 <br />W <br />Z <br />LL,U <br />Q <br />L - <br />W Cly <br />O <br />Sheet Title <br />EROSION & <br />SEDIMENT <br />CONTROL PLAN <br />& DETAILS <br />0 <br />Q <br />a <br />C/) <br />Z <br />C <br />0 <br />0 <br />+' <br />Q <br />V)' <br />i <br />ILL]() <br />L- <br />0 <br />C) <br />O <br />Z <br />DATE 06/24/22 <br />Designed RC <br />Drawn OB <br />Checked RC <br />JOB NO. 2100-045 <br />Drawing No. <br />• <br />