My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7591 - SP7595
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP7508 -
>
SP7591 - SP7595
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 10:08:00 AM
Creation date
8/7/2023 9:57:11 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Combs Avenue Resurfacing
Limits
Sutliff Avenue to East End
Year
2023
Project Engineer
Terrance Powers
Roads Worked
Combs Avenue
Red Lines
Yes
Project #
222210
Districts
District 5
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7591 - SP7595
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />I <br />r <br />J B <br />LLL <br />LuLu <br />ESCALON <br />CITY LIMITS <br />_ o <br />COMBS <br />AVENUE <br />LEMON AVE <br />W <br />z <br />W <br />Q <br />LL <br />JONES AVE LL M <br />,ORANGE AVE — i <br />Tq � <br />:DI a <br />RIVER RD <br />LU■ <br />i <br />d <br />UJ <br />I <br />RIVER RD m <br />I <br />STANISLAUS <br />` COUNTY LIMITS • <br />w I <br />••9'v��gL � m J od9c <br />+f+� , • r r .'r ■ County <br />STANISLAUS <br />COUNTY �t�`♦ s.r`'...'■`` <br />C}5 <br />PROJECT LOCATION MAP <br />raKnow whars below. <br />z A CaII 811 before you dig. <br />O �� <br />PROJECT ENGINEER DATE <br />3/3/23 <br />NO SCALE <br />DPAVVINGt <br />INan4efa t3L f2ut-)Lk5C� .5ft C ry <br />'i �kti�irraalWn ey iiaayvc.t, ry i �t + ')f'allcar <br />CHECKED DATE ACCEPTED <br />3/3/23 <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />STOCKTON, CALIFORNIA <br />COMBS AVENUE RESURFACING <br />(Sutliff Avenue to East End) <br />To Be Supplemented by Standard Plans Dated 2018 <br />and Revised Standard Plans <br />COUNTY OF SAN JOAQUIN <br />Submitted March 7 , 2023 <br />"4.-- Ax,0 <br />JEE VAO F <br />DEPUTY DIRECTOR OF ENGINEERING <br />INDEX OF SHEETS <br />SHEET <br />NO. <br />1 <br />TITLE PAGE <br />SHEET <br />NO. <br />2 <br />GENERAL NOTES AND TYPICAL SECTION <br />SHEET <br />NO. <br />3 <br />PLAN <br />SHEET <br />NO. <br />4 <br />CONSTRUCTION DETAILS <br />SHEET <br />NO. <br />5 <br />SUMMARY OF QUANTITIES AND CONSTRUCTION DETAILS <br />THE STANDARD PLANS APPLICABLE TO THIS CONTRACT <br />ARE INCLUDED IN THE PROJECT SPECIFICATIONS BOOK. <br />ABBREVIATIONS <br />(In addition to abbreviations shown on A3A, A313, A3C and <br />Standard Specifications 1-1.06 Abbreviations) <br />BNSF RR = Burlington Northern Santa Fe Railroad <br />D = District (Supervisorial) <br />SJ Co Std = San Joaquin County Standard <br />SP = Standard Plans <br />TE = Tapered Edge <br />DATE <br />3/7/23 <br />Q, OFESS/O,�l <br />Z <br />No. 76379 <br />CIV \_ <br />F OF CNO <br />I <br />Jayna Rutz <br />RCE 76379 <br />Sheet No. <br />1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.