Project
Ray Road Resurfacing
Limits
Peltier Road to Kile Road
Year
2015
Roads Worked
Ray Rd.
Red Lines
Yes
Project #
220110
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6521 - SP6526
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Z <br />0 <br />GENERAL NOTES <br />1 The Hot Mix Asphalt (Type A) must be placed in two layers. First layer must be a <br />leveling course with 0.13' depth at �. Second layer must be a 0.12' overlay. <br />2. Placement of Hot Mix Asphalt Overlay must not begin until the Hot Mix Asphalt used in <br />Pavement Repair has been in place for a minimum of 18 hours. <br />3. Placement of all Hot Mix Asphalt Driveways must not begin until the Hot Mix Asphalt <br />used for Mainline Paving has been completed. <br />L Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain <br />in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The <br />Contractor must conduct earthwork operations so as not to modify or obstruct <br />the existing drainage. <br />7. All Earthwork, <br />except for final shoulder grading, must be completed <br />prior to placing <br />the final layer <br />of Hot Mix <br />Pavement. No Shoulder <br />10+13 <br />Backing must be <br />deposited or drifted <br />onto the final <br />layer of Hot <br />Mix Asphalt surfacing. <br />Where <br />the shoulder <br />placement <br />exceeds 0.50' <br />in thickness, <br />the Shoulder Backing <br />must be placed in <br />two (2) or more <br />full compacted <br />layers. <br />Lt <br />Sta <br />28+00 <br />CanSt <br />Limits of Clearing and Grubbing <br />Safety <br />Edge <br />(Typ) <br />_29 <br />EP <br />�10 2'2' 1' <br />�i <br />at T Vgria I <br />Shoupl e <br />Existing - - - - - xis ing� oa way <br />Surface <br />Grade existing ground <br />to place Safety Edge- TYPICAL SECTION <br />H' minimum width (Typ) - Sta 10+63 to Sta 60+00 <br />0.12' overlay over <br />variable depth HMA <br />Leveling Course <br />COUNTY OF SAN JOAQUIN No SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Randolph Noriega 1/2015 ,.�+r.X- � 41�/� <br />Existing <br />Surface <br />8. Shoulder Backing material at all intersection radii must receive Penetration Treatment <br />at 0.25 gallon/square yard. Limits of the Penetration Treatment work must be confined <br />to intersection radii plus fifty feet (50') in each direction or to the intersection <br />conform. <br />9. The Contractor will be responsible for adequately scheduling inspection and testing of <br />alI facilities constructed under this contract with a minimum 24 hour notice to the <br />County. All testing must conform to the Standard Specifications. All re -testing will be <br />paid by the Contractor. q <br />Const <br />Limits of Clearing and Grubbing <br />Safety <br />Edge - <br />(TYP) _Vo <br />Existing I Roadway <br />Grade existing ground TYPICAL SECTION <br />to place Safety Edge <br />1' minimum width (Typ) Sta 60+00 to Sto 63+64 <br />Const <br />�-Limits of Clearing and Grubbing <br />Earthwork <br />io (Mist Areas) <br />�- ✓�10' 52' 1P <br />Vaal- Existing Ground <br />Existing Roadway -�-- <br />i-------- 8q, Vor• <br />Conform <br />EARTHWORK DETAIL <br />EP <br />0' 2'2'�1'- <br />Variable <br />Depth <br />Shoulder <br />8% Backing <br />--_ �ot�(TYP) <br />- 0.25' HMA Overlay (Two Layers) <br />EARTHWORK SCHEDULE <br />Location <br />Sta <br />10+13 <br />to <br />Sta <br />10+42 <br />Lt <br />Sta <br />10+50 <br />to <br />Sta <br />13+25 <br />Rt <br />Sta <br />19+00 <br />to <br />Sta <br />46+50 <br />Lt <br />Sta <br />28+00 <br />to <br />Sto <br />30+00 <br />Rt <br />Sta <br />33+00 <br />to <br />Sta <br />60+00 <br />Rt <br />Sta <br />61+50 <br />to <br />Sta <br />62+75 <br />Lt <br />GENERAL NOTES, TYPICAL SECTION, I RAY ROAD RESURFACING <br />AND SHOULDER DETAILS (Peltier Road to Kile Rd) <br />3 <br />Sheet No. <br />2 of 6 <br />