My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6521 - SP6526
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6521 - SP6526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:25:33 PM
Creation date
8/7/2023 3:26:49 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Ray Road Resurfacing
Limits
Peltier Road to Kile Road
Year
2015
Roads Worked
Ray Rd.
Red Lines
Yes
Project #
220110
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6521 - SP6526
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
m <br />Z <br />O <br />I I <br />50' HMA Trans <br />, 25'� rt U) <br />o 0 <br />o o <br />0 <br />Variable <br />N o + + AC Frontage <br />on 00 w Type E Dwy <br />yI° o <br />° R —---- -------- <br />30 <br />—see <br />Detail <br />RAY <br />Hot Mix Asphalt Levelinq Course and 0.12' <br />LEGEND <br />0.1-21 Depth of Planing Asphalt Concrete Pavement <br />Variable Depth HMA Transition <br />■ Limits of Planing Asphalt Concrete Pavement <br />�9 Place Monument Frame and Cover. <br />For locations see Summary of Quantities. <br />R Conform to Existing Radii <br />RAY , <br />31 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Randolph Noriega 9/2015 <br />Variable <br />Const <br />Hot Mix Asphalt Leveling Course and 0.12' Overl <br />� Const <br />EP <br />vOV Z4 <br />0 <br />0 <br />ROAD o <br />35 36 37 38 0 <br />�� PLAN <br />CHE DATE <br />— Z4 <br />My pemor, using ? rsis craw <br />RAY ROAD RESURFACING <br />(Peltier Road to Kile Rd) <br />Sheet No. <br />3 of 6 <br />0 <br />1�6 <br />%3 <br />11 <br />0rR <br />0 <br />, <br />ro <br />o+ <br />wESURFACING <br />I <br />I <br />I <br />I <br />I <br />I <br />30 <br />—see <br />Detail <br />RAY <br />Hot Mix Asphalt Levelinq Course and 0.12' <br />LEGEND <br />0.1-21 Depth of Planing Asphalt Concrete Pavement <br />Variable Depth HMA Transition <br />■ Limits of Planing Asphalt Concrete Pavement <br />�9 Place Monument Frame and Cover. <br />For locations see Summary of Quantities. <br />R Conform to Existing Radii <br />RAY , <br />31 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Randolph Noriega 9/2015 <br />Variable <br />Const <br />Hot Mix Asphalt Leveling Course and 0.12' Overl <br />� Const <br />EP <br />vOV Z4 <br />0 <br />0 <br />ROAD o <br />35 36 37 38 0 <br />�� PLAN <br />CHE DATE <br />— Z4 <br />My pemor, using ? rsis craw <br />RAY ROAD RESURFACING <br />(Peltier Road to Kile Rd) <br />Sheet No. <br />3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.