Laserfiche WebLink
Limits of clearing and grubbing <br />and mailbox relocation <br />A.C. Overlay <br />r. <br />Existing Roadway <br />- L J <br />♦4'-1' <br />EI <br />Variable Depth <br />Shoulder Backing <br />DETAIL 1 <br />Const. Limits of clearing and grubbing <br />and mailbox relocation <br />I ♦, <br />A.C. Overlay 4 1' <br />Var._ 8% E <br />V O <br />Vaf, c <br />I Hyl -111-1 -1117 � o <br />"'-- P I_ 11 I -III -111=- v <br />0.25' Shoulder <br />Existing Roadway <br />Imported Borrow <br />(May include excavated materials <br />from Earthwork-Misc. Areas) <br />DETAIL 2 <br />COUNTY OF SAN JOAQUIN <br />Backing <br />Const. Limits of clearing and grubbing <br />and mailbox relocation <br />Eorthwork <br />(Misc. Areas) <br />12' 2 ♦2, <br />A.C. Overlay <br />Existing Roadway <br />Shoulder <br />White Lane: <br />4' at Sto. 39+72 to 42+15 Lt. <br />4' at Sta. 43+80 to 47+80 Rt. <br />Solari Ranch_ Road <br />4' at Sto. 0+19 to 7+50 Lt. <br />DETAIL 3 <br />Wmw <br />♦Reduce as needed at obstructions <br />such as fences, trees, poles, ect. <br />SHOULDER DETAILS <br />�-:- �y7/��[��A�rieaiay�aeinoaaa:aLLlli. ,'�—.�a:r�ra��l•�'/..a <br />Backing <br />SHOULDER SCHEDULE <br />NOTE: <br />Lawn frontages shall receive topsoil conforming to the <br />section 20-2.01 "Top Soil" of the standard specifications, <br />see special provisions 19S. Locations to be determined by <br />the Engineer. Payment for this shall be included in the bid <br />price for shoulder backing. <br />Sheet No. <br />3 of 10 <br />LEfT <br />I <br />RIGHT <br />Station <br />to <br />Station <br />Detail <br />Station <br />to <br />Station <br />Detail <br />imikh <br />HILDRETH LANE <br />94+21 <br />to <br />98+00** <br />2 <br />94+21 <br />to <br />108+50 <br />2 <br />98+00 <br />to <br />112+70 <br />1 <br />108+50 <br />to <br />111+00 <br />1 <br />112+70 <br />to <br />122+00 <br />2 <br />111+00 <br />to <br />117+00 <br />2 <br />122+00 <br />to <br />127+00 <br />1 <br />117+00 <br />to <br />119+00 <br />1 <br />127+00 <br />to <br />154+00 <br />2 <br />119+00 <br />to <br />123+00 <br />2 <br />154+00 <br />to <br />155+50 <br />1 <br />123+00 <br />to <br />142+00 <br />1 <br />155+50 <br />to <br />157+50 <br />2 <br />142+00 <br />to <br />152+00 <br />2 <br />157+50 <br />to <br />163+55 <br />1 <br />1 <br />152+00 <br />to <br />163+55 <br />1 <br />** Sta. 96+20 to 97+00 (Lt.) <br />Conform to existing landscaping <br />WHITE <br />LANE <br />0+30 <br />to <br />1+80 <br />2 <br />0+30 <br />to <br />1+00 <br />3 <br />1 +80 <br />to <br />39+72 <br />1 <br />1+00 <br />to <br />7+10 <br />1 <br />39+72 <br />to <br />42+15 <br />3 <br />7+10 <br />to <br />12+92 <br />3 <br />42+15 <br />to <br />50+74 <br />1 <br />12+92 <br />to <br />16+25 <br />1 <br />16+25 <br />to <br />21+50 <br />3 <br />- <br />21+50 <br />to <br />26+65 <br />1 <br />26+65 <br />to <br />31+00 <br />3 <br />31+00 <br />to <br />33+40 <br />1 <br />33+40 <br />to <br />50+74 <br />3 <br />SOLARI RANCH ROAD <br />0+19 <br />to 7+50 <br />3 <br />0+19 <br />to <br />25+50 <br />1 <br />7+50 <br />to <br />13+00 <br />1 <br />25+50 <br />to <br />31+00 <br />2 <br />13+00 <br />to <br />17+50 <br />2 <br />31 +00 <br />to <br />33+00 <br />1 <br />17+50 <br />to <br />25+50 <br />1 <br />33+00 <br />to <br />49+12 <br />2 <br />25+50 <br />to <br />49+12 <br />2 <br />NOTE: <br />Lawn frontages shall receive topsoil conforming to the <br />section 20-2.01 "Top Soil" of the standard specifications, <br />see special provisions 19S. Locations to be determined by <br />the Engineer. Payment for this shall be included in the bid <br />price for shoulder backing. <br />Sheet No. <br />3 of 10 <br />